Project Completion Certificate (Ground Water)
Scheme ID: 8388644 Name of Scheme: Olendha No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3334 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 01-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.09 M / 72.51 M Olendha 28.529292 77.529292
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50.60 M Olendha 28.529292 77.529292
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 16 M Olendha 28.529399 77.771919
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.0279
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.302
2 HDPE 75 0.713
3 HDPE 90 0.852
4 HDPE 110 0.13
5 HDPE 140 0.425
HSC Connection
Sno. Total Nos.
1 708
Other Details