Project Completion Certificate (Ground Water)
Scheme ID: 8389801 Name of Scheme: ATAURA W/S Scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2430 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Mar-2023 Actual Date of Completion (Capex): 12-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18Mtr / 112Mtr Ataura 28.703292 78.619292
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 0.5/45 Ataura 28.703292 78.619292
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 175KL / 11 M Ataura 28.703292 78.619292
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 125 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.240
2 HDPE Pipe PN-6: Class PE-100 75 0.331
3 HDPE Pipe PN-6: Class PE-100 63 3.817
4 HDPE Pipe PN-6: Class PE-100 110 0.189
5 HDPE Pipe PN-6: Class PE-100 140 0.309
6 HDPE Pipe PN-6: Class PE-100 160 0.006
7 HDPE Pipe PN-6: Class PE-100 200 0.043
HSC Connection
Sno. Total Nos.
1 459
Other Details
1.89
1.76
1.76
23-Sep-2025
26-Dec-2025