OHT 6 and OHT 7 LPCD data, Total water supply data and Overall water supply data now showing on SCADA integration system and all OHTs are running properly
all CWRs are now showing connected to SCADA integration portal that was in problem mode. all data is visible and verified by NCC PM .
water logging in OHT 5 so for safety purpose supply was stopped. On OHT 3, solar panel not charge due to rain that why supply is showing on portal only 62% and resume water supply within 2 days s as per NCC DGM.