Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20097691 KHIJIRPUR W/S SCHEME (HFCL) 20097691/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in the column of OHT, indicating poor compaction or improper concrete placement, which may affect the structural integrity. Rectification Status- Rectified Observation- Honeycombing repaired by cement grouting.
2 20086391 DHARI KHURD W/S SCHEME (HFCL) 20086391/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted steel reinforcement was used in the column, which may affect the bond strength with concrete and compromise the structural integrity. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction
3 20097093 NEWADAA W/S SCHEME (HFCL) 20097093/01 No Yes No No No No No No No No No No No Resolved tpi Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area.
4 20111029 KHATIRPUR W/S SCHEME (HFCL) 20111029/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Photo of coating with anti-rust chemical provided by TKC.
5 20088188 TODERPUR W/S SCHEME (HFCL) 20088188/01 No No No No No No Yes No No No No No No Resolved TPI Observation- 1. The cover block provided for the column reinforcement does not meet the specified thickness as per design and code requirements, which may lead to reduced durability and increased risk of reinforcement corrosion 2. Rusted steel was used in the OHT column reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability
6 20091435 BELSARI W/S SCHEME (HFCL) 20091435/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT raft casting reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability
7 20088552 M RAFI ALIAS SHIVDASPUR W/S SCHEME (HFCL) 20088552/01 No No No No No No Yes No No No No No No Observation- OHT Column steel found rusted.
8 20097737 ALAMPUR & SONA W/S SCHEME (HFCL) 20097737/01 No No No No No No Yes No No No No No No Observation- OHT Column steel found damage condition and all steel cut.
9 20088202 HASANPUR W/S SCHEME (HFCL) 20088202/01 No No No No No No Yes No No No No No No Observation- OHT Column steel found Damage Condition and Steel Cut.
10 20086418 TOKAWA W/S SCHEME (HFCL) 20086418/01 No No No No No No Yes No No No No No No Resolved Observation- OHT Ground brace beam Shuttering alignment not in center of column.
11 20086381 MALA KHURD W/S SCHEME (HFCL) 20086381/01 No No No No No No Yes No No No No No No Observation- Torq Rench Calibration certificate not available during inspection.
12 20091452 MAKRSAN W/S SCHEME (HFCL) 20091452/01 No No No No No No Yes No No No No No No Observation- OHT Column steel found damage Condition
13 20097760 CIPAH W/S SCHEME (HFCL) 20097760/01 No No No No No No Yes No No No No No No Observation- Overlapping found 400mm instead 800 at 1st brace beam
14 20097687 BARAR & JANUPUR W/S SCHEME (HFCL) 20097687/01 No No No No No No Yes No No No No No No Resolved Observation- Radial bars has been not provided at inner and outer portion according to specifications
15 20086255 CHITORA W/S SCHEME (HFCL) 20086255/01 No No No No No No Yes No No No No No No Observation- OHT Column steel found rusted.
16 20086199 TARAW W/S SCHEME (HFCL) 20086199/01 No No No No No No No No No No No No No Observation- OHT Column steel found rusted.
17 20100562 PIPNAR W/S SCHEME (HFCL) 20100562/01 No No No No No No No No No No No No No Observation- Proper support with Shuttering required in OHT Column works.
18 20086449 MARDANPUR W/S SCHEME (HFCL) 20086449/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT Plinth beam . This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability
19 20086425 BURANPUR W/S SCHEME (HFCL) 20086425/01 No No No No No No No No No No No No No
20 20086281 ODASAN W/S SCHEME (HFCL) 20086281/01 No No No No No No No No No No No No No
21 20100536 SALEMPUR BAGHAI W/S SCHEME (HFCL) 20100536/01 No No No No No No No No No No No No No
22 20074299 DEVAPAR W/S SCHEME (HFCL) 20074299/01 No No No No No No No No No No No No No
23 20100552 CHAK PAHAR M.MURTAJPUR W/S SCHEME (HFCL) 20100552/01 No No No No No No No No No No No No No
24 20097674 CHAK JAINAB W/S SCHEME (HFCL) 20097674/01 No No No No No No No No No No No No No
25 20075421 JAHNI W/S SCHEME (HFCL) 20075421/01 No No No No No No No No No No No No No
26 20088257 GOPALPUR W/S SCHEME (HFCL) 20088257/01 No No No No No No No No No No No No No
27 20073819 AARIPUR W/S SCHEME (HFCL) 20073819/01 No No No No No No No No No No No No No
28 20088430 JAIRAMPUR MANGWAL W/S SCHEME (HFCL) 20088430/01 No No No No No No No No No No No No No
29 20088221 SARDARPUR W/S SCHEME (HFCL) 20088221/01 No No No No No No No No No No No No No
30 20088470 KANERI W/S SCHEME (HFCL) 20088470/01 No No No No No No No No No No No No No
31 20075942 BARAULI SULTAN SINGH W/S SCHEME (HFCL) 20075942/01 No No No No No No No No No No No No No
32 20086207 MOUDIHA & BARWA KHURD W/S SCHEME (HFCL) 20086207/01 No No No No No No No No No No No No No
33 20088408 MALIKPURA W/S SCHEME (HFCL) 20088408/01 No No No No No No No No No No No No No
34 20100557 BURANPUR W/S SCHEME (HFCL) 20100557/01 No No No No No No No No No No No No No
35 20086446 SONBARSA W/S SCHEME (HFCL) 20086446/01 No No No No No No No No No No No No No
36 20092091 SARAI DHANESH W/S SCHEME (HFCL) 20092091/01 No No No No No No No No No No No No No
37 20074377 JALALPUR DHANI W/S SCHEME (HFCL) 20074377/01 No No No No No No No No No No No No No
38 20092007 KISHUN PUR W/S SCHEME (HFCL) 20092007/01 No No No No No No No No No No No No No
39 20076400 SHAHPUR & MURERA BUZURG W/S SCHEME (HFCL) 20076400/01 No No No No No No Yes No No No No No No Observation-Rusted reinforcement steel was observed being used in the casting of the Overhead Tank (OHT) brace beams. The presence of corrosion on steel bars can adversely affect the bond strength with concrete and may compromise the structural integrity of the member Rectification Status- Not Rectified Observation- Cement slurry is applied on OHT GL column steel
40 20088316 SIPARI W/S SCHEME (HFCL) 20088316/01 No No No No No No Yes No No No No No No Resolved Observation-"The provided development length of reinforcement was found to be insufficient and does not meet the prescribed specifications, which may compromise the structural integrity and load transfer efficiency. Rectification Status- Rectified Observation- Length rectified
41 20092034 GOVINDPUR W/S SCHEME (HFCL) 20092034/01 No No No No No No Yes No No No No No No Resolved Observation- Main bars of brace beam are merged at junction box which are not fit according to drawing Rectification Status- Rectified Observation-Main bar of brace beam rectified
42 20100544 AMABANSI W/S SCHEME (HFCL) 20100544/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted reinforcement bars were being used in the Overhead Tank (OHT) construction. The use of corroded steel compromises the bond with concrete and adversely affects the structural strength and durability of the structure. Rectification Status- Rectified Observation- OHT new lot reinforcement column & beam ring used
43 20088583 DAULATPUR W/S SCHEME (HFCL) 20088583/01 No No No No No No Yes No No No No No No Resolved Observation- The reinforcement steel used in the OHT raft was found in a rusted condition, which is unacceptable as per standard construction practices and may affect the durability and bonding of concrete. Rectification Status- Rectified Observation- OHT Raft before casting cement slurry used
44 20091456 PATE PUR W/S SCHEME (HFCL) 20091456/01 No No No No No No Yes No No No No No No Resolved 1. Observation- The specified concrete cover of 50 mm was not maintained; only 25 mm cover was provided. This deviation from the design specification compromises durability and corrosion protection of the reinforcement, and must be rectified immediately." Rectification Status- Rectified Observation-50 MM cover block provided and rectified
45 20076123 PAREWA W/S SCHEME (HFCL) 20076123/01 No No No No No No Yes No No No No No No Resolved 1. Observation- Rusted and corroded steel bars were being used for the OHT reinforcement work, which is against standard specifications and may compromise the structural integrity and durability of the structure. Rectification Status- Rectified Observation- Cement slurry is applied on OHT GL column steel
46 20088275 NEWADA W/S SCHEME (HFCL) 20088275/01 Yes No No No No No No No No No No No No Resolved Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area. Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area. TKC- NC’s Letter no.- MTCPL/SWSM/TPIA- CLUSTER-17/2024-25/105393 Letter Date- 25.12.2024 Block- Saidpur Scheme- Newada Rectification Status- Rectified Observation-Plinth beam alignment rectified
47 20097769 AHLADPUR W/S SCHEME (HFCL) 20097769/01 No No No No No No Yes No No No No No No Resolved Observation- Reinforcement bar overlapping has not been executed as per the specified standards. Improper lapping may compromise the structural strength and durability of the component. Rectification is necessary to ensure compliance with IS codes and design requirement Rectification Status- Rectified Observation-Plinth beam alignment rectified
48 20097086 TODAR PUR W/S SCHEME (HFCL) 20097086/01 No No No No No No Yes No No No No No No Resolved Observation-1. The cover block provided for the column reinforcement does not meet the specified thickness as per design and code requirements, which may lead to reduced durability and increased risk of reinforcement corrosion 2. Rusted steel was used in the OHT column reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1-Rectified, 2- Rectified
49 20094505 KHANPUR RAGHUBAR RAI & KRITSINGH PUR W/S SCHEME (HFCL) 20094505/01 No No No No No No Yes No No No No No No Resolved Observation- Hook bending of reinforcement bars at 135 degrees, as specified in IS 2502 and IS 456:2000, was not provided. This non-compliance may lead to inadequate anchorage and compromised structural integrity, particularly in seismic or high-stress zones." Rectification Status- Rectified Observation-135 degrees hook bending rectified
50 20097088 BELSAREE W/S SCHEME (HFCL) 20097088/01 No No No No No No Yes No No No No No No Observation- Rusted steel was used in the OHT raft casting reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Not Rectified
51 20074381 KANUWAN W/S SCHEME (HFCL) 20074381/01 No No No No No No Yes No No No No No No Resolved Observation- The spacing of reinforcement steel bars was found to be inconsistent with the approved structural drawings. Such deviation may affect the structural performance and load distribution, and must be rectified to comply with design specifications. Rectification Status- Rectified
52 20088510 MUHAMMADPUR W/S SCHEME (HFCL) 20088510/01 No No No No No No Yes No No No No No No Resolved Observation- Cover block not provided properly according to specifications, required 50mm but provided 30mm Rectification Status- Rectified
53 20073704 SUZNI PUR W/S SCHEME (HFCL) 20073704/01 No No No No No No Yes No No No No No No Resolved Observation- 1. Proper bending of OHT column ring hook at 135 degrees was not provided. 2. Cover block of OHT raft foundation not provided as per specified thickness. Rectification Status- 1-Rectified, 2-Rectified
54 20097015 MATH UCHORI W/S SCHEME (HFCL) 20097015/01 No No No No No No Yes No No No No No No Resolved Observation- OHT Coloumn steel is found in damaged condition. Rectification Status- Rectified
55 20073685 KATGHRA W/S SCHEME (HFCL) 20073685/01 No No No No No No Yes No No No No No No Observation- Rusted steel was used in the OHT reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Not Rectified
56 20086393 UTTAMPUR W/S SCHEME (HFCL) 20086393/01 No No No No No No Yes No No No No No No Resolved Observation- During the inspection, reinforcement steel was observed getting rusted due to exposure to environmental conditions. This can compromise the bond with concrete and affect the structural durability if not addressed promptly. Rectification Status- Rectified
57 20073748 BELHARA W/S SCHEME (HFCL) 20073748/01 No No No No No No Yes No No No No No No Resolved 1. Observation- Rusted and corroded steel was used in the OHT column reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
58 20092071 SADO PUR W/S SCHEME (HFCL) 20092071/01 No No No No No No Yes No No No No No No Observation- .Rusted and corroded steel was used in the OHT coloumn reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Not Rectified
59 20100532 CHAK MUKURI BAREJPUR W/S SCHEME (HFCL) 20100532/01 No No No No No No Yes No No No No No No Resolved Observation- A visible crack has been observed on the OHT column. Rectification Status- Rectified
60 20086408 SARAI BAHADUR W/S SCHEME (HFCL) 20086408/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT raft column reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
61 20088558 UCHORI W/S SCHEME (HFCL) 20088558/01 No No No No No No Yes No No No No No No Resolved Observation- Honeycomb visible in OHT Column area, proper finishing is required. Rectification Status- Rectified
62 20097732 PAHARPUR TAUFIR W/S SCHEME (HFCL) 20097732/01 No Yes No No No No No No No No No No No Resolved Observation- Alignment of the brace beam has not been executed as per design specifications. This misalignment can lead to structural inefficiency and potential stability concerns in the OHT framework. Rectification Status- Rectified
63 20094383 MUDARNA (MUDARBHA) W/S SCHEME (HFCL) 20094383/01 No No No No No No Yes No No No No No No Resolved Observation- Proper Dressing with Compaction is required in OHT Excavation for PCC work. Rectification Status- Rectified
64 20086196 VASILA & JAGMAL ZOT W/S SCHEME (HFCL) 20086196/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT coloumn reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
65 20088191 POOTA W/S SCHEME (HFCL) 20088191/01 No No No No No No Yes No No No No No No Observation- Staggered bars were not used for lapping, which is against standard reinforcement practices.Spacing of Slab Steel Bars Not as per Approved Drawing Rectification Status- Not Rectified
66 20073711 CHOKARI_W/S_SCHEME 20073711/01 No No No No No No Yes No No No No No No Resolved Observation- During the inspection of the OHT (Overhead Tank) column ring reinforcement work, it was observed that proper binding of ring hooks at 135 degrees was not provided as per standard detailing requirements. Rectification Status- Rectified
67 20086345 OTANA W/S SCHEME (HFCL) 20086345/01 No No No No No No Yes No No No No No No Resolved Observation- During the inspection of the OHT (Overhead Tank) column ring reinforcement work, it was observed that proper binding of ring hooks at 135 degrees was not provided as per standard detailing requirements. Rectification Status- Rectified
68 20086359 ENDRAPUR CHHIRI W/S SCHEME (HFCL) 20086359/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT plinth beam. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. 2. OHT plinth beam shuttering is not aligned. 3. Rusted steel was used in the OHT column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1- Rectified,2- Rectified, 3- Rectified
69 20073666 PAHARIPUR W/S SCHEME (HFCL) 20073666/01 No No No No No No Yes No No No No No No Resolved Observation- Honeycomb has been observed in the brace beam at the junction of columns 2. Honeycomb has been observed at junction of columns and brace beam Rectification Status-1- Rectified, 2- Rectified
70 20074355 BAHRAMPUR W/S SCHEME (HFCL) 20074355/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
71 20093397 CHAITHO BANDH W/S SCHEME (HFCL) 20093397/01 No No No No No No Yes No No No No No No Resolved Observation- Segregation was observed during concrete casting. Rectification Status- Rectified
72 20088204 DUDHAURA W/S SCHEME (HFCL) 20088204/01 No No No No No No Yes No No No No No No Resolved Observation- Segregation was observed during concrete casting. Rectification Status- Rectified
73 20102083 PURAN PUR W/S SCHEME (HFCL) 20102083/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT slab casting works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
74 20088383 LOHWA & HAZIPUR BARESAR & HASANPUR GAURA W/S SCHEME (HFCL) 20088383/01 No No No No No No Yes No No No No No No Resolved Observation- The beam of the OHT raft has been observed to be in an undulated shape. Rectification Status- Rectified
75 20106928 USIA W/S SCHEME (HFCL) 20106928/01 No No No No No No Yes No No No No No No Observation- Rusted steel was used in the OHT column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Not Rectified
76 20086444 BHALA W/S SCHEME (HFCL) 20086444/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT Brace beam works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
77 20092051 TISAURI W/S SCHEME (HFCL) 20092051/01 No No No No No No Yes No No No No No No Observation-. Rusted steel was used in the OHT Raft coloumn works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability 2. Rusted steel was used in the OHT Raft works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1- Not Rectified, 2- Not Rectified
78 20092082 TARKA & AMAROPUR W/S SCHEME (HFCL) 20092082/01 No No No No No No Yes No No No No No No Resolved Observation- Ring beam Steel binding is not found as per drawing. Stirrups of the beam not hold with main bar of the beam. Rectification Status- Rectified
79 20075253 KHETAABPUR W/S SCHEME (HFCL) 20075253/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT Plinth beam. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified
80 20073694 MARDAN PUR W/S SCHEME (HFCL) 20073694/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT Plinth beam . This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified
81 20087154 BIJAHARA W/S SCHEME (HFCL) 20087154/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT first brace beam of coloumn works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified
82 20100531 HUSAYPUR W/S SCHEME (HFCL) 20100531/01 No No No No No No Yes No No No No No No Resolved Observation- Rusted steel was used in the OHT first brace beam of column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified
83 20088554 KARAMPUR W/S SCHEME (HFCL) 20088554/01 No No No No No No No No No No No No No