| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20100892 | QYAMPUR WATER SUPPLY SCHEME | 20100892/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 2 | 20095044 | BANDI KALA WATER SUPPLY SCHEME | 20095044/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 3 | 20095476 | GULLI GADH GRAM PANCHAYAT WATER SUPPLY SCHEME | 20095476/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | During inspection of the foundation pit for the Over Head Tank, the achieved excavation depth was measured as 2050 mm. As per approved drawing/BOQ, the required excavation depth is 2600 mm. Hence, there is a deficit of 550 mm in excavation depth. Update -New place shifted | ||||||||||||
| 4 | 20100901 | KAMTHARI NOORPUR WATER SUPPLY SCHEME | 20100901/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | The reinforcement bars of columns are heavily rusted due to prolonged exposure to the atmosphere and stagnant water at the site. | |||||||||||||
| 5 | 20085855 | RAJAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | 20085855/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | The vertical alignment of the brace beam is visibly distorted and slanted/curved instead of maintaining a true, straight horizontal axis between the two vertical columns | |||||||||||||
| 6 | 20085864 | TILSAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME | 20085864/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-The ground brace beam not in alignment. 2-The second brace beam not in alignment. | |||||||||||||