Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20023430 SOHASA SUMALI GP WSS 20023430/01 No No No No No No Yes No No No No No No Resolved OHT slab finishing with chipping and plastering work is done
2 20075102 HASAUDI AVSANPUR GP WSS 20075102/01 No No Yes No No No No No No No No No No Resolved NDT Test is conducted result found satisfactory .
3 20021743 Tanuhar Urf Khalilwaliya 20021743/01 No No Yes No No No No No No No No No No Resolved OHT slab conducted NDT test & result found satisfied.
4 20023331 SANGRAM PUR GP WSS 20023331/01 No No Yes No No No No No No No No No No Resolved OHT 1st Brace Conducted NDT test & result found satisfied.
5 20075247 MAJHAWAN KALA GP WSS 20075247/01 No No Yes No No No No No No No No No No Resolved OHT 3rd lift column above 2nd brace beam conducted NDT test & result found satisfied.
6 20021713 Jahda Musthakam 20021713/01 No No No No No Yes No No No No No No No Resolved Water leak rectified and provide anode bag completed
7 20021823 Mahua Pathak 20021823/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
8 8362767 POKHAR BHITWA GP WSS 8362767/01 Yes No No No No No No No No No No No No Regarding Honeycomb in OHT ring beam
9 20096892 ROINHAWA GROUP OF GP WSS 20096892/01 No No No No No Yes No No No No No No No Gap found between slab and tank Slab is not in level
10 8362151 HATHIWAD TAAL GP WSS 8362151/01 No No No No Yes No No No No No No No No Column lapping zone and alignment issue
11 8362951 BARGO GP WATER SUPPLY SCHEME 8362951/01 No No No No No No No No No No No No No 1. During site visit it is found that staircase dowel bar is cut. 2. Site is situated at low land area. It is advised to prefer boundary wall and pump house drawing in column beam. It is advised to TKC rectify the work
12 20029207 BABHANI LAGARI GP WSS 20029207/01 No No No No No No Yes No No No No No No Precast OHT dowel bar used different size of Bar.
13 20021827 BASAWANPAKAR URF MADRAHIYA 20021827/01 No No No No Yes No No No No No No No No Resolved It has been observed that during column reinforcement (1 Nos. longitudinal bars), the required lap length of 1.50 m has not been provided (1.25 m provided) within the designated lapping zone as per IS 456:2000, which may adversely affect proper bond development and load transfer in the column. ATR submitted on 19.05.2026
14 20015996 BASAUNI 20015996/01 No No Yes No No No No No No No No No No Resolved OHT column first lift cube failure 7 - days.and Cube has been tested on 28 days result found satisfactory
15 20021620 Dokam amya 20021620/01 No No Yes No No No No No No No No No No Resolved cube failure of 1st and 2nd Brace beam and After NDT test Conducted result found satisfactory.
16 20016001 Badahar Ghat 20016001/01 No No No No No No Yes No No No No No No Resolved Rectification done Removing the Rusted steel of Raft and rest of steel used iron oxide before casting.
17 20075136 PARSOHAN GP WSS 20075136/01 No No Yes No No No No No No No No No No Resolved Concrete cube failed of OHT ring beam and cross beam below slab 28 days of testing and After NDT result found satisfactory.
18 20015987 Shivpati Nagar 20015987/01 No No Yes No No No No No No No No No No Resolved 28 Days cube compressive strength test has been done & found satisfactory.
19 20036638 KAPIYA MISHRA GP WSS 20036638/01 No No Yes No No No No No No No No No No Resolved Rebound hammer test done in 1st BB lift found satisfactory.
20 20075133 HISANUDDIN PUR WSS 20075133/01 No No Yes No No No No No No No No No No Resolved Concrete Cube failed of OHT raft and Plinth beam of 28bday and after NDT test result found satisfactory .
21 20023361 CHANNAR GADDI GP WSS 20023361/01 No No Yes No No No No No No No No No No Resolved Rebound hammer test done in col 1st lift found satisfactory.
22 20022651 MAJHARI 20022651/01 No No Yes No No No No No No No No No No Resolved OHTcol 1st lift and raft cube failure of 28- days. and After NDT Test result found Satisfactory.
23 20016002 Dewra Bazar 20016002/01 No No Yes No No No No No No No No No No Resolved OHT raft NDT has been done and test result found satisfactory
24 20023232 MAHUI GP WSS 20023232/01 No No No No No No Yes No No No No No No Resolved Construction of OHT Stair case trade and riser size issue. ATR Submitted on 19.05.2026.
25 20017615 Lamui Tall GP Water supply scheme 20017615/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
26 20059873 PADARIYA GP WSS 20059873/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
27 20036610 TIWARIPUR EAST GP WSS 20036610/01 No No Yes No No No No No No No No No No Resolved Raft NDT test & result found satisfied.
28 20012549 Para Nankar G.P. Water Supply Scheme 20012549/01 No No Yes No No No No No No No No No No Resolved OHT Raft Conducted NDT test & result found satisfied.
29 20075271 DUBAI AND MUJDIH GP WSS 20075271/01 No No No No No No Yes No No No No No No Resolved Comlun provide lap as per drawing within lapzone
30 20074947 Ahiroli padri wss 20074947/01 No No No No No No Yes No No No No No No Resolved reinforcement and layout as per drawing
31 20075242 JAGDISHPUR GRANT GP WSS 20075242/01 Yes No No No No No No No No No No No No Resolved Repairing done honeycombing area
32 20021816 BABHNI 20021816/01 Yes No No No No No No No No No No No No Resolved OHT 1st Brace beam and column above 1st brace beam Repairing done with injection grouting.
33 20020496 Teknaar WS scheme 20020496/01 Yes No No No No No No No No No No No No Resolved Honeycomb at 2nd brace meam. ATR is submitted on 19.05.2026
34 20096407 DEKHARI GP WSS 20096407/01 No No No No No No No No No No No No No OHT 1st brace Honeycomb found. Honeycomb is repaired with GP2 after that NDT (UPV and Rebound Hammer) is conducted in presence of UPJN & TPIA. reports found satisfactory.
35 20075254 LUCHUYA GP WSS 20075254/01 No No No No No No No No No No No No No Honeycomb found due to poor formwork and poor concrete compaction in Stair case. Honeycomb is repaired with GP-2 and NDT (UPV & Rebound hammer) is conducted in presence of UPJN and TPIA. report found satisfactory.
36 20075207 SEMRIYAON GP WSS 20075207/01 No No No No No No No No No No No No No OHT slab 28 days cube test is not found satisfactory. NDT is recommended. NDT test (UPV and Rebound hammer) test is conducted in presence of UPJN and TPIA an result found satisfactory.
37 20016124 Bhagta WSS 20016124/01 No No No No No Yes No No No No No No No 1. During site visit water leakage observed at the bottom periphery of zinc-alum tank. Water marks are visible on the concrete base near tank joints, indicating seepage from tank panel joints / bottom sealing. 2. It is also observed water seepage in bottom slab are seepage marks clearly evident on the slab surface.. 3. Uv foam sealing has not been provided at the bottom of the zinc-alum tank .
38 20020745 BACHADA BACHADI GP WATER SUPPLY SCHEME 20020745/01 No No No No No No No No No Yes No No No 1. Hydro-test of Zn-Al tank work is in progress without RFI and without supervision of manufacturer-engineer 2. During site visit it is found that thrust block of inlet , outlet ,Overflow , washout pipes are not made at site due to this total weight of pipe is carried out by Zn-Al tank this weight can damage the tank wall.
39 20016023 Semari 20016023/01 No No No No No No No No No No No Yes No 1. During site visit it is found that there is level difference in OHT slab panel .There is a chance of differential settlement of pre-cast slab panel after filling the tank with water. 2. Thrust block of inlet , outlet ,Overflow , washout pipes are not made at site due to this total weight of hanging pipe is carried out by Zn-Al tank this weight can damage the tank wall.
40 20058682 KOLHUI GP WSS 20058682/01 No No No No No No No No No No No Yes No 1. During site visit it is found that water is seepage through bottom of tank. 2. OHT Slab grouting of DI pipes is not done. Thrust block of inlet , outlet ,Overflow , washout pipes are not made at site due to this total weight of hanging pipe is carried out by Zn-Al tank this weight can damage the tank wall.
41 20023343 BIRDPUR NO 5 GP WSS 20023343/01 No No Yes No No No No No No No No No No 1.During cube testing in MEIL Lab test result of top dome cube (M-30) found unsatisfactory.(29.89 N/mm2)
42 20021622 Kudi 20021622/01 No No No No No No No No No No No No No Construction of OHT staircase 5th & 6th landing not as per drawing(Width and Alignment ) issue. Alignment of stair is repaired and verified by Site engineer along with upjn.