| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20033495 | AMIRTA PATHELI & HARRNA NARAYANPUR JJM SCHEME | 20033495/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1.Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 12-15 months. | |||||||||||||
| 2 | 20010255 | BASARA | 20010255/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-OHT column has found misaligned (not in plumb), indicating deviation from vertical alignment. | |||||||||||||
| 3 | 20016672 | ASIQ NAGAR JJM SCHEME | 20016672/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | 1.Severe honeycombing has been observed in OHT Ring beam, Staircase slab, conical wall with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. | |||||||||||||
| 4 | 20000057 | Ajan WS | 20000057/01 | No | Yes | No | No | No | Yes | No | No | No | No | No | No | No | 1.OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 2- Gap observed between slab and hold down bracket. 3-Water supply continued in village without chlorination. | |||||||||||||
| 5 | 20066562 | khakhra JJM SCHME | 20066562/01 | Yes | No | No | No | No | Yes | No | No | No | No | No | No | No | 1.Major crack and honeycomb found in staircase beam 2.Severe honeycombing observed in OHT walkway slab with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 3- DI pipes are being fitted with bends which are not recommended. 4- Grouting is required at the base of the zinc alum tank." | |||||||||||||
| 6 | 20033539 | BACHGAWAN JJM SCHEME | 20033539/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.The spacing between OHT columns is not as per approved structural drawing and needs to be corrected to maintain proper alignment and structural stability. | |||||||||||||
| 7 | 20033549 | BAGRETHI JJM SCHEME | 20033549/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1.Major leakage was observed from the cylindrical wall of the OHT, indicating structural or waterproofing failure. 2.Cracks were observed in the OHT walkway slab at three different locations, which may affect durability and safety. 3.By visual inspection, Two OHT columns appears to be not in proper vertical alignment. 4.Severe honeycombing has been observed in OHT staircase beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 5.Uneven surface has been observed on the OHT projection (chajja). 6.Visible structural cracks seen in walkway slab, indicating potential weakness. 7.Multiple leakages have been observed in the vertical wall of the OHT. | |||||||||||||
| 8 | 20016538 | BAIKUAN JJM SCHEME | 20016538/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.OHT column has been found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 9 | 20053008 | BANWARIPUR JJM SCHEME | 20053008/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.The Roof beam and bottom slab of OHT have become tilted & have sagged downward, and also honeycombing and cracks found in OHT bottom slab and beam. | |||||||||||||
| 10 | 20069724 | Barkhera and Himmatpur JJM SCHEME | 20069724/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1.Severe honeycombing observed in OHT 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. | |||||||||||||
| 11 | 20023912 | BUDHHIKHURD JJM SCHEME | 20023912/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 12 | 20066499 | Belbudhi JJM SCHEME | 20066499/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1.By visual inspection, OHT columns appears to be not in proper vertical alignment. 2.Deviation has been observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 13 | 20023873 | BELWA JJM SCHEME | 20023873/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Cement bags embedded between OHT Column and Tie beam junction. 2.Major honeycombing has been observed in beam & column of Overhead Tank (OHT), indicating poor compaction and workmanship. 3.Visible structural crack seen in walkway slab of Overhead Tank (OHT), indicating potential weakness. 4.The OHT DI pipe has been laid in the wrong position. | |||||||||||||
| 14 | 20007624 | BETI SAHADAVE | 20007624/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.One OHT column has found misaligned (not in plumb) above 2nd brace beam, indicating deviation from vertical alignment. | |||||||||||||
| 15 | 20052492 | BHADURI JJM SCHEME | 20052492/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Cracks have been observed in the OHT staircase beam. | |||||||||||||
| 16 | 20076685 | Bhikampur JJM SCHEME | 20076685/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.It is observed that the OHT excavation work has not been backfilled after completion of the foundation and related construction activities. Leaving the excavation open for a prolonged period may lead to soil erosion, accumulation of water, loss of bearing capacity, and potential safety hazards. | |||||||||||||
| 17 | 20085386 | BHUDA BHUDI JJM SCHEME | 20085386/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1.Misalignment observed in the ring beam of OHT, potentially impacting structural stability and load distribution. 2.Deviation observed 20 mm oversize in cross-section size of beam compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 18 | 20033444 | UMARPUR JJM SCHEME | 20033444/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1-Visible structural crack has been observed in staircase Landing at the column junction, indicating potential weakness. | |||||||||||||
| 19 | 20096801 | UCHAULIA JJM SCHEME | 20096801/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | The spacing between OHT columns is not as per approved structural drawing and needs to be corrected to maintain proper alignment and structural stability. | |||||||||||||
| 20 | 20059866 | BILLAI JJM SCHEME | 20059866/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | Yes | 1.OHT column has found misaligned (not in plumb), indicating deviation from vertical alignment. | |||||||||||||
| 21 | 20096942 | TELIYAR JJM SCHEME | 20096942/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1-So many leakage has been found in the RCC Overhead Tank (OHT). 2-Three no’s Over Head Tank (OHT) columns have found misaligned (not in plumb), indicating deviation from vertical alignment. 3-Leakage observed on inner and outer sides of OHT ring beam. | |||||||||||||
| 22 | 20096904 | VISHINGPURA JJM SCHEME | 20096904/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1.OHT DI pipe has been installed without providing proper clamping. 2.OHT column has found misaligned (not in plumb) above 1st brace beam, indicating deviation from vertical alignment tolerances. | |||||||||||||
| 23 | 20066883 | SUHELA JJM SCHEME | 20066883/01 | Yes | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1-Severe honeycombing has been observed in OHT walkway slab with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2-Misalignment has been observed in 3rd brace beam of OHT, potentially impacting structural stability and load distribution. 3-Deviation has been observed in cross-section size of 3rd brace beam compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 24 | 20054959 | SISORA SAHAMAT JJM SCHEME | 20054959/01 | Yes | No | No | No | Yes | No | No | No | No | No | No | No | Yes | 1-Major honeycombing observed in 2nd & 3rd brace beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 2-Deviation observed in cross-section size of column & beam at 3rd brace junctions compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 25 | 20061244 | CHEDUI PATEYA JJM SCHEME | 20061244/01 | Yes | Yes | No | Yes | Yes | No | Yes | No | No | No | No | No | No | 1.Visible structural crack observed in the staircase, indicating potential structural weakness and requiring immediate attention. 2.Major honeycombing observed in staircase of Overhead Tank (OHT), indicating poor compaction and workmanship. 3.Major honeycombing observed in cylindrical wall of Overhead Tank (OHT), indicating poor compaction and workmanship. 4.The external surface of the container wall is uneven, patchy, and undulated, with honeycombing. 5.Bottom surface of the staircase waist slab is uneven and honeycombed, with visible voids and exposed aggregates. 6.Thickness of the staircase 2nd lift waist slab measured at site is 80–90 mm, which is not as per the approved drawing and design specifications. 7.Visible structural crack seen in staircase above 2nd ,3rd brace beam at the column junction, indicating potential weakness. 8.By visual inspection, one OHT column appears to be not in proper alignment. 9.By visual inspection, one OHT column appears to be not in proper alignment. 10.Projected rebars in Overhead Tank (OHT) staircase were found heavily rusted. The construction work of OHT has been halted at 2nd lift staircase for approximately 8-10 months. | |||||||||||||
| 26 | 20010833 | SINGHIYA JJM SCHEME | 20010833/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-Three OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 2-Severe honeycombing observed in OHT 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. | |||||||||||||
| 27 | 20010744 | SHAHPUR RAJA SCHEME | 20010744/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | 1-Deviation has been observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 2-Severe honeycombing has been observed in OHT walkway slab & Staircase beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 3-Shuttering of staircase flights 7 & 8 has not been removed even after 6 months of casting. | |||||||||||||
| 28 | 20061220 | CHHAUCHH JJM SCHEME | 20061220/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Plywood embedded at bottom of staircase slab. 2.During inspection, cracks were observed in the OHT plinth protection. 3.GI pipe handrail was found improperly welded. 4.DI pipe clamping arrangement is not proper as per standard practice. | |||||||||||||
| 29 | 20010804 | SEDHAUNA SCHEME | 20010804/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 30 | 20016597 | SAUKHIA JJM SCHEME | 20016597/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | The vertical distance between the ground level and the first bracing beam of the OHT has been constructed higher than the level specified in the approved drawing, indicating a deviation from the sanctioned design and construction drawings. | |||||||||||||
| 31 | 20052920 | SARWANGPUR & DULHAPUR CHAUBE JJM SCHEME | 20052920/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 10-12 months. | |||||||||||||
| 32 | 20010267 | SARPTHA | 20010267/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 33 | 20062409 | Dahar, & ganeshpur grant JJM SCHEME | 20062409/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | Yes | 1.Severe honeycombing has been observed in OHT 2nd and 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2.Crack has been observed in the pump house chlorine room wall. | |||||||||||||
| 34 | 20067050 | SALVANT NAGAR JJM SCHEME | 20067050/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | 1-Severe honeycombing observed in OHT Bottom dome with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2-Major honeycombing observed in 5th staircase of Overhead Tank (OHT), indicating poor compaction and workmanship. | |||||||||||||
| 35 | 20016518 | DARIYABAD JJM SCHEME | 20016518/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1.During inspection, the waist slab thickness of the OHT staircase at the 1st and 4th lift was found to be approximately 80–100 mm, whereas the approved drawing specifies a thickness of 120 mm. This is a deviation from the approved drawing. Necessary verification should be carried out and appropriate corrective action ensured. | |||||||||||||
| 36 | 20096953 | SALLIYA JJM SCHEME | 20096953/01 | No | Yes | No | Yes | No | No | No | No | No | No | No | No | Yes | 1-One OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 2-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at full staging for approximately 12-15 months. | |||||||||||||
| 37 | 20010700 | ROSHAN NAGAR SCHEME | 20010700/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 38 | 20052561 | DHADHEL JJM SCHEME | 20052561/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Visible structural crack has been observed in staircase Landing at the column junction, indicating potential weakness. | |||||||||||||
| 39 | 20066455 | Razaganj (Ghunghuchi) JJM SCHEME | 20066455/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1-One OHT column found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 2-Deviation observed in cross-section size of column compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 40 | 20010794 | DHAKA SCHEME | 20010794/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Visible structural crack seen in Overhead Tank (OHT) vertical wall, indicating potential weakness. 2.Visible structural crack seen in Overhead Tank (OHT) 2nd & 4th Staircase landing flight , indicating potential weakness. | |||||||||||||
| 41 | 20033537 | RAMPUR MADARI JJM SCHEME | 20033537/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-Misalignment observed in 3rd brace beam of OHT, potentially impacting structural stability and load distribution. 2-Severe honeycombing observed in OHT beam & Column with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 3-OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 42 | 20069271 | PRATAP PUR JJM SCHEME | 20069271/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1-Severe honeycombing observed in OHT staircase with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2-OHT staircase landing beam with exposed reinforcement requires immediate attention to prevent further damage and ensure safety. 3-Major honeycombing has been observed in staircase beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 4-Cement bags embedded between OHT Column and Tie beam junction. 5-Severe honeycombing has been observed in staircase slab with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 6-By visual inspection, OHT column appears to be not in proper alignment. | |||||||||||||
| 43 | 20059831 | PIPRACHHIT JJM SCHEME | 20059831/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 44 | 20033046 | PARELI JJM SCHEME | 20033046/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | 1-Severe honeycombing has been observed in OHT 2nd and 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2-All DI pipes have been installed without proper clamping/support arrangement. 3-Improper bamboo shuttering has been used instead of standard formwork in the OHT structure. | |||||||||||||
| 45 | 20032768 | FAJAL NAGAR GRANT JJM SCHEME | 20032768/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | 1.Severe honeycombing observed in OHT 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2.Projected rebars in Overhead Tank (OHT) 7th lift staircase were found heavily rusted. The construction work of OHT has been halted at 7th lift staircase for approximately 6 months. | |||||||||||||
| 46 | 20069324 | PAKARIYA JJM SCHEME | 20069324/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | 1-The staircase slab of the OHT has been cast with a thickness of approximately 50–70 mm, which is significantly less than 120 mm thickness specified in the approved structural drawing. This deviation constitutes a Critical non-conformance and may compromise the structural integrity, load-bearing capacity, durability, and long-term safety of the staircase. 2-Projected rebars in Overhead Tank (OHT) 5th staircase were found heavily rusted. The construction work of OHT has been halted at staircase for approximately 5-6 months. 3-Major honeycombing observed in 2nd lift landing beam & staircase slab of Overhead Tank (OHT), indicating poor compaction and workmanship. | |||||||||||||
| 47 | 20085327 | OEL DEHAT JJM SCHEME | 20085327/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 48 | 20061747 | NAURANGA BAD JJM SCHEME | 20061747/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1-Seepage has been observed at the conical wall near the ring beam of the OHT. | |||||||||||||
| 49 | 20087320 | GARHAIYA JJM SCHEME | 20087320/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1.During site inspection, it was observed that 1nos column of OHT above the 2nd brace beam is not in proper vertical alignment. This deviation may affect structural stability and load transfer mechanism if not addressed. 2.During inspection, the OHT staircase waist slab thickness at the 1st and 2nd lift was found 80–100 mm against the required 120 mm as per drawing. This is a drawing deviation. This is a clear deviation from the approved design and may compromise structural strength and durability. | |||||||||||||
| 50 | 20052860 | NAKERA & MOHAMMAPUR KAMI JJM SCHEME | 20052860/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | 1-Major honeycombing has been observed in staircase first flight waist slab of Overhead Tank (OHT), indicating poor compaction and workmanship. 2-Major honeycombing has been observed in column & first brace beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 3-Shuttering ply has been embedded between OHT Column and Tie beam junction. 4-Visible structural crack seen in staircase landing flight at the column junction, indicating potential weakness. 5-Projected rebars in Overhead Tank (OHT) final staircase and walkway slab were found heavily rusted. The construction work of OHT final staircase has been halted for approximately 6-7 months. | |||||||||||||
| 51 | 20069359 | GAURA JJM SCHEME | 20069359/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | 1.Deviation observed in cross-section size of ring beam compared to approved drawings, which may affect structural alignment and load transfer. 2.The ring beam of Overhead Tank (OHT) is misaligned, and constructed level is not as per approved drawing. 3.The top surface level of OHT slab is uneven and not executed as per specified levels. 4.A visible structural crack has been observed in staircase landing flight above the first brace beam at column junction, indicating a possible structural weakness. 5.The railing angles on the OHT slab are not fixed properly, and the members show significant rusting, affecting safety and durability. 6.The Zn-Al storage tank is installed off-center on the slab, which may lead to uneven load distribution and structural imbalance. | |||||||||||||
| 52 | 20062288 | Ghoorkhera & Badriya JJM SCHEME | 20062288/01 | Yes | No | No | No | No | Yes | Yes | No | No | No | No | No | No | 1.Severe honeycombing has been observed in OHT bottom slab beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2.Plywood has been found embedded in the slab at locations where the DI pipe is installed. 3.OHT staircase and balcony handrailing have been found rusted. 4.Zinc-Aluminium tank grouting work is pending. 5.OHT DI pipe is found misaligned, and installation is not as per approved drawing. | |||||||||||||
| 53 | 20010584 | GHUTNA BUZURG | 20010584/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 54 | 20051200 | GOPALAPUR JJM SCHEME | 20051200/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.One OHT column found misaligned (not in plumb), indicating deviation from vertical alignment. 2.Misalignment observed in Staircase 3rd brace beam of OHT, potentially impacting structural stability and load distribution. | |||||||||||||
| 55 | 20101624 | GRANT NO.10 JJM SCHEME | 20101624/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1.The vertical distance between the ground level and the first bracing beam of the OHT has been constructed higher than the level specified in the approved drawing, indicating a deviation from the sanctioned design and construction drawings. | |||||||||||||
| 56 | 20016975 | GRANT NO 14 JJM SCHEME | 20016975/01 | No | No | No | No | No | Yes | Yes | No | No | No | No | No | No | 1.Seepage is observed in the cylindrical wall of the OHT. 2.MS ladder installed but it should be Aluminum ladder as per approved DpR. Also due to not proper Gl painted the purity of water may deteriorate." | |||||||||||||
| 57 | 20093386 | GRANT NO 3 JJM SCHEME | 20093386/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1.Reinforcement steel is visible in columns and beams due to inadequate concrete cover, indicating poor concreting and potential durability issues. 2.Major honeycombing has been observed in Column & beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 3.Two OHT columns have been found misaligned (not in plumb) above 2nd brace beam, indicating deviation from vertical alignment. | |||||||||||||
| 58 | 20055304 | IBRAHIMPUR JJM SCHEME | 20055304/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | Yes | 1.Misalignment observed in 2 tie beams of 3rd brace beam of OHT, potentially impacting structural stability and load distribution. 2.Centre alignment discrepancy observed at column and tie beam junction; tie beam not centered on the column. | |||||||||||||
| 59 | 20076937 | Jaiti JJM SCHEME | 20076937/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.The staircase slab of the OHT has been cast with a thickness of approximately 60–80 mm, which is significantly less than 130 mm thickness specified in the approved structural drawing. This deviation constitutes a Critical non-conformance and may compromise the structural integrity, load-bearing capacity, durability, and long-term safety of the staircase. | |||||||||||||
| 60 | 20086407 | JAMAITHA JJM SCHEME | 20086407/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | 1.OHT column has found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 2.OHT Inlet and outlet pipe clamping has not been fixed. 3.The OHT staircase has not been constructed as per the approved drawing. 4.Visible structural crack seen in staircase, Walkway slab, indicating potential weakness. 5.By visual inspection, one OHT column appears to be not in proper alignment. 6.Deviation observed in cross-section size of column below ring beam compared to approved drawings, which may affect structural alignment and load transfer. 7.Bulging has been observed in the ZnAl tank panels. 8.Staircase construction has been found not as per approved drawing and design details. | |||||||||||||
| 61 | 20069340 | JAMHAURA | 20069340/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1.Projected rebars in Overhead Tank (OHT) column above 1st brace beam were found heavily rusted. The construction work of OHT has been halted at 1st brace beam for approximately 10-12 months. | |||||||||||||
| 62 | 20052572 | KAIMA KHURD JJM SCHEME | 20052572/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1.By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 63 | 20066599 | KHAMBOL JJM SCHEME | 20066599/01 | No | Yes | No | Yes | No | No | Yes | No | No | No | No | No | No | 1.Major honeycombing observed in OHT 2nd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2.By visual inspection, OHT columns appears to be not in proper vertical alignment. 3.Major honeycombing has been observed in beam & column of Overhead Tank (OHT), indicating poor compaction and workmanship. 4.Cement bags have been embedded between OHT Column and Tie beam junction. 5.Visible structural crack seen in ring beam at the column junction & vertical wall, indicating potential weakness. | |||||||||||||
| 64 | 20052974 | KHANPUR GURAILA JJM SCHEME | 20052974/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1.By visual inspection, OHT one column appears to be not in proper vertical alignment. 2.Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 65 | 20052612 | KHUNTI BUZURG JJM SCHEME | 20052612/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Visible structural crack seen in staircase landing beam, indicating potential weakness. | |||||||||||||
| 66 | 20096643 | KAORAIYA CHAMRU & PIPRA KARAMCHANAD JJM SCHEME | 20096643/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1.Visible structural crack seen in staircase, Walkway slab & Column, indicating potential weakness. 2.Leakage has been observed in the ZnAl tank liner 3.By visual inspection, one OHT column appears to be not in proper alignment. 4.The DI pipe has been routed by breaking the staircase beam, which is not as per approved drawings and standard construction practice. | |||||||||||||
| 67 | 20017043 | KUNWARPUR JJM SCHEME | 20017043/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1.OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment. 2.It is observed that Non-Conformance (NC) was already issued earlier for this item. During Total Station survey of OHT columns, Column C1 is found deviated by more than 51 mm and Column C4 by more than 35 mm from their approved centreline positions, indicating significant deviation from the approved drawings. | |||||||||||||
| 68 | 20076680 | Kusmauri JJM SCHEME | 20076680/01 | Yes | No | No | No | No | Yes | Yes | No | No | No | No | No | No | 1.Severe honeycombing has been observed in OHT 3rd brace beam with exposed reinforcement, indicating inadequate concrete compaction and serious workmanship deficiency. 2.Major honeycombing has been observed in bottom dome of Overhead Tank (OHT), indicating poor compaction and workmanship. 3.Repair work in the OHT column has been executed without adherence to SWSM methodology and without prior RFI approval, leading to the development of cracks at the repaired portion of column, indicating poor workmanship and improper repair procedure. 4. Electrically operated valves at the outlet are manual working. 5. Lightning arrestor has not been installed as per design specifications. 6. Seepage was detected at the bottom slab of the overhead tank." | |||||||||||||
| 69 | 20053245 | LAUKA JJM SCHEME | 20053245/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-3 no’s OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 70 | 20085332 | MEDIYA JJM SCHEME | 20085332/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. 2-Shuttering material has been found embedded at the column and ring beam junction. | |||||||||||||
| 71 | 20086644 | MAHAMADABAD JJM SCHEME | 20086644/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | Yes | 1-RCC Slab and beam tilted or sag down | |||||||||||||
| 72 | 20017293 | MAHARIA JJM SCHEME | 20017293/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1-Visible structural crack seen in staircase balcony landing slab, indicating potential weakness. 2-Grouting work has not been carried out below the ZnAl tank base and along the slab side, which may affect proper load transfer and durability. | |||||||||||||
| 73 | 20010801 | MAHESHPUR SCHEME | 20010801/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-One OHT columns found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. | |||||||||||||
| 74 | 20069357 | MAKSOHA JJM SCHEME | 20069357/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1-Misalignment has been observed in brace beam of OHT, potentially impacting structural stability and load distribution. 2-Deviation has been observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. | |||||||||||||
| 75 | 20010822 | MALL BEHER SCHEME | 20010822/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1-Leakage has been observed from the RCC OHT conical wall near the ring beam portion. | |||||||||||||
| 76 | 20096672 | MATAIHIYA JJM SCHEME | 20096672/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-By visual inspection, OHT column appears to be not in proper alignment above 3rd brace beam. | |||||||||||||
| 77 | 20053328 | MIRZAPUR SUNAORA JJM SCHEME | 20053328/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | 1-Major honeycombing has been observed in 1st brace beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 2-Shuttering ply has been embedded between OHT Column and Tie beam junction. 3-Visible structural cracks have been observed in vertical wall and walkway slab, indicating potential weakness. 4-Bulging and surface unevenness observed on the vertical wall. 5-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 6-Cracks have been observed in boundary wall panels, indicating poor workmanship. | |||||||||||||
| 78 | 20017190 | MIYANPUR JJM SCHEME | 20017190/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. 2-During the site visit, it was observed that the staircase slab has not been constructed as per the approved structural drawing. 3-Deviation has been observed in cross-section size of ring beam compared to approved drawings, which may affect structural alignment and load transfer. 4-During the site visit, seepage was observed in the conical wall of the OHT. | |||||||||||||
| 79 | 20023884 | MOHAMMADAPUR JJM SCHEME | 20023884/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1-By visual inspection, OHT column appears to be not in proper alignment. 2-Staircase steps are damaged, and finishing is not proper. 3-ZAT slab side RCC grouting is not done / gaps observed. 4-DI pipe clamping arrangement is not proper as per standard practice. | |||||||||||||
| 80 | 20053097 | MOHAMMADPUR MAHEWA AND RUDARPUR KALAN JJM SCHEME | 20053097/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | 1-The DI pipe has been routed by breaking the staircase beam, which is not as per approved drawings and standard construction practice. 2-Visible structural multiple cracks have been observed in OHT staircase beam, staircase landing, and walkway slab, indicating potential weakness. 3-OHT columns have been found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 4-The DI pipe has not been properly fixed with an adequate thrust block. 5-Rusting has been observed on the DI pipe surface. | |||||||||||||
| 81 | 20033514 | MUDANIZAM JJM SCHEME | 20033514/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | 1-Honeycombing has been observed at various locations in the OHT structure, which is not as per standard construction practices. 2-Reinforcement steel is visible in the OHT walkway slab and cylindrical wall at multiple locations, indicating inadequate cover and poor concreting. | |||||||||||||
| 82 | 20059800 | MURIA JJM SCHEME | 20059800/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. | |||||||||||||
| 83 | 20088743 | ATRAULI JJM SCHEME | 20088743/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | 1.Deviation observed in cross-section size of ring beam compared to approved drawings, which may affect structural alignment and load transfer. 2.The ring beam of Overhead Tank (OHT) is misaligned, and constructed level is not as per approved drawing. | |||||||||||||
| 84 | 20088022 | MUKREHTA JJM SCHEME | 20088022/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 85 | 20096634 | JAMUNIYA KADHILEY | 20096634/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 86 | 20100362 | BELA KALAN JJM SCHEME | 20100362/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 87 | 20010796 | BASAHI COLONY SCHEME | 20010796/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 88 | 20066605 | SAIDAPUR DEVKALI JJM SCHEME | 20066605/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 89 | 20062458 | Behara jorawar & jamuniya rana JJM SCHEME | 20062458/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 90 | 20096781 | MARUA PASCHIM JJM SCHEME | 20096781/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 91 | 20052458 | IBRAHIMPUR JJM SCHEME | 20052458/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 92 | 20100359 | SINGHAI KHURD JJM SCHEME | 20100359/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 93 | 20052286 | ALI NAGAR JJM SCHEME | 20052286/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 94 | 20066639 | Behralal JJM SCHEME | 20066639/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 95 | 20016585 | KHARWAHIYA NO-2 JJM SCHEME | 20016585/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 96 | 20075375 | PARSEYA & Poya JJM SCHEME | 20075375/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 97 | 20076677 | Makanpur JJM SCHEME | 20076677/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 98 | 20054858 | MINNAPUR JJM SCHEME | 20054858/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 99 | 20077526 | Singaniya JJM SCHEME | 20077526/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | |||||||||||
| 100 | 20010799 | PATWARA SCHEME | 20010799/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 101 | 20087611 | MAQSUDPUR JJM SCHEME | 20087611/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 102 | 20062379 | Chataura & Pipra Jhala JJM SCHEME | 20062379/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 103 | 20076689 | Chikanajati JJM SCHEME | 20076689/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 104 | 20062487 | HARNAHA JJM SCHEME | 20062487/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 105 | 20096799 | BAROTHA JJM SCHEME | 20096799/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 106 | 20100030 | MANIKPUR JJM SCHEME | 20100030/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 107 | 20096666 | RAMIABEHAR JJM SCHEME | 20096666/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 108 | 20052299 | DANPUR JJM SCHEME | 20052299/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 109 | 20023904 | MADHAYA JJM SCHEME | 20023904/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 110 | 20055368 | MURADPUR JJM SCHEME | 20055368/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 111 | 20033518 | RAHJANIA JJM SCHEME | 20033518/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 112 | 20087998 | SANKARPUR RAJA JJM SCHEME | 20087998/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 113 | 20066622 | Multanpur Grant JJM SCHEME | 20066622/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 114 | 20069327 | SINGAWAR JJM SCHEME | 20069327/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 115 | 20075575 | SHEKHPUR JJM SCHEME | 20075575/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 116 | 20051211 | BARHAIYA JJM SCHEME | 20051211/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 117 | 20010829 | BASANTPUR SCHEME | 20010829/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 118 | 20016514 | CHORHA KHURRAM NAGAR JJM SCHEME | 20016514/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 119 | 20055311 | DIXITPUR & KULHAURA JJM SCHEME | 20055311/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 120 | 20017186 | GULCHAURA JJM SCHEME | 20017186/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 121 | 20069279 | JETHRA JJM SCHEME | 20069279/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 122 | 20066398 | Kharg Pur JJM SCHEME | 20066398/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 123 | 20033516 | NAWAGAON JAT JJM SCHEME | 20033516/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 124 | 20066550 | BICHIYANAGARA JJM SCHEME | 20066550/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 125 | 20016549 | GHARAYANIA JJM SCHEME | 20016549/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 126 | 20052292 | MAGHI JJM SCHEME | 20052292/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 127 | 20066635 | Semra Grant JJM SCHEME | 20066635/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 128 | 20061225 | SEMRAWAN JJM SCHEME | 20061225/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 129 | 20023867 | DIHUA KALA JJM SCHEME | 20023867/01 | Yes | Yes | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | Resolved | Resolved | |||||||||||
| 130 | 20066885 | GHUNGHUTTA BUZURG JJM SCHEME | 20066885/01 | Yes | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 131 | 20052596 | MADAWA JJM SCHEME | 20052596/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 132 | 20096940 | MAJHGAI JJM SCHEME | 20096940/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 133 | 20016544 | PASGAWAN JJM SCHEME | 20016544/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 134 | 20093378 | RAIPUR & SHAHPUR JJM SCHEME | 20093378/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 135 | 20032795 | AHMAD NAGAR JJM SCHEME | 20032795/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 136 | 20100048 | DHARMA PUR JJM SCHEME | 20100048/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 137 | 20000058 | Sahijana | 20000058/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 138 | 20130175 | Salahpur grant Water supply scheme | 20130175/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 139 | 20033493 | SOHAUNA JJM SCHEME | 20033493/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 140 | 20096670 | TIKHARA JJM SCHEME | 20096670/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 141 | 20053113 | SAINPUR JJM SCHEME | 20053113/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 142 | 20096671 | SHAHPUR JJM SCHEME | 20096671/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 143 | 20076664 | AMBARSOT JJM SCHEME | 20076664/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 144 | 20052606 | JAMUNIYA SHAGHABAZ JJM SCHEME | 20052606/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 145 | 20076628 | JIGNA JJM SCHEME | 20076628/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 146 | 20069275 | Rudrapur Gulariya JJM SCHEME | 20069275/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 147 | 20067066 | SOHAK JJM SCHEME | 20067066/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 148 | 20087596 | TENDUBAI JJM SCHEME | 20087596/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 149 | 20016525 | KALLUA | 20016525/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 150 | 20077548 | Bacchepara & Rari JJM SCHEME | 20077548/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 151 | 20099655 | RAIPUR GRANT JJM SCHEME | 20099655/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 152 | 20052430 | ACHHRAULA JJM SCHEME | 20052430/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 153 | 20100025 | BABAURA JJM SCHEME | 20100025/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 154 | 20066543 | saunaha | 20066543/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 155 | 20061754 | SURMA JJM SCHEME | 20061754/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 156 | 20024473 | BANKATI & SARIYAPARA JJM SCHEME | 20024473/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 157 | 20066555 | KHARWAHIA NO 1 JJM SCHEME | 20066555/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 158 | 20066431 | Maligaon JJM SCHEME | 20066431/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 159 | 20087604 | NAJOTA, DAVRAHI, MASAN KAMBH JJM SCHEME | 20087604/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 160 | 20075395 | Sunda & Dhakia JJM SCHEME | 20075395/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 161 | 20066462 | Ramlook JJM SCHEME | 20066462/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 162 | 20059858 | PAHARA JJM SCHEME | 20059858/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 163 | 20052622 | TERWA JJM SCHEME | 20052622/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 164 | 20087598 | NAGRA SALEMPUR | 20087598/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 165 | 20095579 | BAIREYA JJM SCHEME | 20095579/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 166 | 20076650 | Musepur Khurd JJM SCHEME | 20076650/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 167 | 20016674 | RASOOLPUR JJM SCHEME | 20016674/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 168 | 20010797 | BHANPURI COLONY SCHEME | 20010797/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 169 | 20016599 | MURTIHA JJM SCHEME | 20016599/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 170 | 20100014 | SAIDHARI JJM SCHEME | 20100014/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 171 | 20061340 | KHANTA DESU JJM SCHEME | 20061340/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 172 | 20000064 | Aliganj | 20000064/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 173 | 20066558 | KORIYA JUNGLE JJM SCHEME | 20066558/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 174 | 20101626 | MITOLI JJM SCHEME | 20101626/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 175 | 20010834 | ODRA SCHEME | 20010834/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 176 | 20061257 | TENDHUUWA JJM SCHEME | 20061257/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 177 | 20093363 | BASARIA JJM SCHEME | 20093363/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 178 | 20100006 | BALDEOTA JJM SCHEME | 20100006/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 179 | 20066646 | BANIKAGAON JJM SCHEME | 20066646/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 180 | 20052426 | DOHAK JJM SCHEME | 20052426/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 181 | 20061385 | SISORA NASIR JJM SCHEME | 20061385/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 182 | 20076660 | Mandariya JJM SCHEME | 20076660/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 183 | 20076655 | Kalliyarampur JJM SCHEME | 20076655/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 184 | 20052576 | MADARPUR JJM SCHEME | 20052576/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 185 | 20066649 | Baibha JJM SCHEME | 20066649/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 186 | 20062342 | Parsehra and sirsa JJM SCHEME | 20062342/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 187 | 20010816 | JAMHOURA SCHEME | 20010816/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 188 | 20032911 | SHIVPURI JJM SCHEME | 20032911/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 189 | 20023887 | ORAHARA JJM SCHEME | 20023887/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 190 | 20096673 | LAHORI NAGAR JJM SCHEME | 20096673/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | |||||||||||
| 191 | 20066694 | AGGAR BUZURG JJM SCHEME | 20066694/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 192 | 20069651 | RATASIYA JJM SCHEME | 20069651/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 193 | 20076591 | BASHA BHOOR JJM SCHEME | 20076591/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 194 | 20052279 | MIRZAPUR JJM SCHEME | 20052279/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 195 | 20061824 | MURA DHAMU JJM SCHEME | 20061824/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 196 | 20051199 | SAMAISA JJM SCHEME | 20051199/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 197 | 20069736 | ALLIPUR JJM SCHEME | 20069736/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 198 | 20059922 | GAURIA JJM SCHEME | 20059922/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 199 | 20096917 | KALUAPUR JJM SCHEME | 20096917/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 200 | 20010818 | MUSHEPUR SCHEME | 20010818/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 201 | 20066892 | ADLISHPUR JJM SCHEME | 20066892/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 202 | 20010211 | ROSHAN NAGAR | 20010211/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 203 | 20066512 | TUSARA JJM SCHEME | 20066512/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 204 | 20067061 | CHHAPARDAHA JJM SCHEME | 20067061/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 205 | 20051202 | KHAMARIYA JJM SCHEME | 20051202/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 206 | 20054800 | BHIKAMPUR JJM SCHEME | 20054800/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 207 | 20075478 | Devmaniya JJM SCHEME | 20075478/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 208 | 20007608 | GAURIYA BHILAM | 20007608/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 209 | 20069344 | HARSINGHPUR JJM SCHEME | 20069344/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 210 | 20017036 | PADUWA JJM SCHEME | 20017036/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 211 | 20010840 | RAM NAGARMULTIVILLAGE SCHEME | 20010840/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 212 | 20096950 | GEDANIA JJM SCHEME | 20096950/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 213 | 20062417 | Kasarawal JJM SCHEME | 20062417/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 214 | 20033521 | PAKRIYA JJM SCHEME | 20033521/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | ||||||||||||
| 215 | 20010824 | CHANPURA SCHEME | 20010824/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 216 | 20055343 | GANESHPUR JJM SCHEME | 20055343/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||