| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20059013 | MAANPUR GP WSS | 20059013/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | During site visit it is found that OHT reinforcement bar is cut from concrete surface | |||||||||||||
| 2 | 20059025 | MALHWAR GP WSS | 20059025/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. Raft Ring Beam concrete had been executed without RFI Approval, and Quality is not assured. | |||||||||||||
| 3 | 20099656 | BELWA LAGUNHI WSS | 20099656/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube testing of OHT top dome (M-30 Grade) 28 days result failed and Honeycomb found in OHT bottom dome. Rectified With NDT test result found Satisfied . | ||||||||||||
| 4 | 20058968 | KURTHI DIHA AND PIPRA GADDI GP WSS | 20058968/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | OHT all Column steel missing at ground level. Dismantle all columns & Brace beam, provide the lap as per drawing/design. | |||||||||||||
| 5 | 20021600 | ATHKONIYA & BAGAHAWA WSS | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Regarding OHT staircase is not as per drawing.Height of staircase riser is increased and no of flight is decreased | ||||||||||||||
| 6 | 20058968 | KURTHI DIHA AND PIPRA GADDI GP WSS | S.Nagar-48 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 7 | 20059136 | BANJARAHA BUZURG & SAKARPAR | 20059136/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Slab and beam leveling is not done properly | |||||||||||||
| 8 | 20021616 | KAPIYA BUKNIHA GRANT | 20021616/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Railing fixing is not done properly it damage, Finishing and panting work is poor. ,Crack found in Balcony area need proper rectification and Rising main pipe hole is not grouted. | |||||||||||||
| 9 | 20021597 | PIPRAKANUNGO WATER SUPPLY SCHEME | 20021597/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Erection of OHT precast column not in plumb. | |||||||||||||
| 10 | 20059120 | AKLOHI & SIRSIYA CHAUBEY GP WSS | 20059120/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectify the railling column as per drawing replace it with MS angle section | ||||||||||||
| 11 | 20059209 | PANANI WSS | 20059209/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectify the railing column as per drawing replaced with MS angle section. | ||||||||||||
| 12 | 20099584 | GAURA GADH WSS | 20099584/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT 5th lift column cube test result was failed of 7days and Conducted NDT (Rebound Hammer test and UPV ) test has been performed and result found satisfactory. | ||||||||||||
| 13 | 20099659 | ITWA BAKSI & PIPRI BUJURG & SUHEELWA WSS | 20099659/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube (M-30) of OHT Column 2nd lift 7 days and column 1st lift does not gain its target compressive strength on 28 days of testing after performed NDT test & result found satisfied. | ||||||||||||
| 14 | 20075728 | MADARAHNA URF DATTPUR GP WSS | 20075728/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete Cube (OHT Raft) and column 1st lift and 2nd lift above GL does not gain its required strength in 28 days AND After NDT and core cutting test done & found satisfied. | ||||||||||||
| 15 | 20075548 | PAT KHAULI MAUFI AND KHAKHARAON GP WSS | 20075548/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete Cube (OHT Raft) and column 2nd lift does not gain its required strength in 28 day and After NDT & core cutting test done & found satisfied. | ||||||||||||
| 16 | 20059200 | MUDILI WSS | 20059200/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Honeycomb found at 2nd lift column beam junction and Rectify with NDT( Rebound Hammer test ) Performed test result found satisfied . | ||||||||||||
| 17 | 20021574 | MAHADEVA KHURD WSS | 20021574/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube of OHT column 4th lift does not gain its target compressive strength on 28 days of testing and After performed NDT test & result found satisfied. | ||||||||||||
| 18 | 20059750 | BEWA JIAUDEEN TURKAULIYA GP WSS | 20059750/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1. It is Observed that Raft mesh casting was completed more than 1.5 year ago, while raft beam reinforcement and casting are still pending, indicating excessive delay and improper construction sequencing. 2. Due to over 1.5 year work stoppage, exposed raft beam reinforcement has severely rusted, which may adversely affect bond strength and durability of the raft foundation. 3. It is recommended to replace all rusted reinforcement / dismantle and reconstruct the raft ring beam. | |||||||||||||