| 1 |
667823 |
hathnasa water supply scheme |
2006-2007 |
PWS |
Completed |
59.32 |
59.32 |
59.32 |
0.00 |
O&M |
|
| 2 |
701419 |
Hasnapur Water Supply Scheme |
2005-2006 |
PWS |
Completed |
50.79 |
50.79 |
50.79 |
0.00 |
O&M |
|
| 3 |
1755643 |
Baikhara PWS |
2008-2009 |
PWS |
Completed |
44.76 |
44.76 |
44.76 |
0.00 |
O&M |
|
| 4 |
4219715 |
Salarpur Water Supply Scheme |
2009-2010 |
PWS |
Completed |
84.50 |
84.50 |
84.50 |
0.00 |
O&M |
|
| 5 |
4307203 |
Tej gaon Water Supply Scheme |
2009-2010 |
PWS |
Completed |
132.00 |
128.26 |
128.26 |
0.00 |
O&M |
|
| 6 |
4307248 |
Dhuri Khera Water Supply Scheme |
2009-2010 |
PWS |
Completed |
124.00 |
107.17 |
107.17 |
0.00 |
O&M |
|
| 7 |
4307292 |
Jagatpur Bhichkaura Water Supply Scheme |
2009-2010 |
PWS |
Completed |
76.80 |
76.76 |
76.76 |
0.00 |
O&M |
|
| 8 |
4307612 |
Bardar Water Supply Scheme |
2009-2010 |
PWS |
Completed |
186.41 |
167.09 |
167.09 |
0.00 |
O&M |
|
| 9 |
4309148 |
Dighiya water supply scheme |
2009-2010 |
PWS |
Completed |
118.00 |
102.48 |
102.48 |
0.00 |
O&M |
|
| 10 |
4314880 |
Mau water supply scheme |
2010-2011 |
PWS |
Completed |
162.81 |
162.81 |
162.81 |
0.00 |
O&M |
Work cost is 132.062 but system does not allow to feed because expenditure is more .
|
| 11 |
4314926 |
Bahai Water Supply Scheme |
2010-2011 |
PWS |
Completed |
214.95 |
214.95 |
214.95 |
0.00 |
O&M |
|
| 12 |
4314956 |
Sultanpur Khera water supply scheme |
2010-2011 |
PWS |
Completed |
164.14 |
164.14 |
164.14 |
0.00 |
O&M |
Work cost is 153.32 but system does not allow to feed because expenditure is more .
|
| 13 |
4314966 |
Gojhari water supply scheme |
2010-2011 |
PWS |
Completed |
163.20 |
163.20 |
163.20 |
0.00 |
O&M |
Work cost is 154.76 but system does not allow to feed because expenditure is more . |
| 14 |
4314983 |
Uttara Gauri water supply scheme |
2009-2010 |
PWS |
Completed |
124.89 |
120.35 |
120.35 |
0.00 |
O&M |
|
| 15 |
4315113 |
Semarpaha water supply scheme |
2009-2010 |
PWS |
Completed |
170.42 |
152.24 |
152.24 |
0.00 |
O&M |
|
| 16 |
5200545 |
Jalalpur Dhai water supply scheme |
2012-2013 |
PWS |
Completed |
136.38 |
108.36 |
108.36 |
0.00 |
O&M |
|
| 17 |
5215539 |
Bhitargaon PWS |
2012-2013 |
PWS |
Completed |
469.30 |
465.49 |
465.49 |
0.00 |
O&M |
|
| 18 |
6652829 |
Sidhauna PWS FLUROIDE affected Village |
2014-2015 |
PWS |
Completed |
286.66 |
285.46 |
285.46 |
0.00 |
O&M |
|
| 19 |
6699169 |
Ghorwara water supply scheme |
1983-1984 |
PWS |
Completed |
29.53 |
29.53 |
29.53 |
0.00 |
Under Construction |
Scheme is reorganized as 20086676
GHURWARA GROUP OF VILLAGES
|
| 20 |
6699256 |
dewali water supply scheme |
1982-1983 |
PWS |
Completed |
38.30 |
38.30 |
38.30 |
0.00 |
Under Construction |
Scheme is reorganized as 20085256
DEVLI GROUP OF VILLAGES |
| 21 |
6699313 |
Pakrauli w/s scheme |
1981-1982 |
PWS |
Completed |
28.90 |
28.90 |
28.90 |
0.00 |
Under Construction |
Scheme is reorganized as 20085243
PAKHRAULI GROUP OF VILLAGES
|
| 22 |
6699488 |
SHIVGARH WATER SUPPLY SCHEME |
1971-1972 |
PWS |
Completed |
44.44 |
44.44 |
44.44 |
0.00 |
Under Construction |
Scheme is reorganized as
5329845
Shekhpur Samodha water supply scheme
|
| 23 |
6699539 |
NARETHUA WATER SUPPLY SCHEME |
1985-1986 |
PWS |
Completed |
37.17 |
37.17 |
37.17 |
0.00 |
Under Construction |
Scheme is reorganized as 20084337
NERTHUWA GROUP OF VILLAGES
|
| 24 |
6699648 |
SIWAN WATER SUPPLY SCHEME |
1985-1986 |
PWS |
Completed |
29.98 |
29.98 |
29.98 |
0.00 |
Under Construction |
Scheme is reorganized as 20086036
Siwan Group of villages
|
| 25 |
6699683 |
khiro w/s scheme |
1972-1973 |
PWS |
Completed |
21.05 |
21.05 |
21.05 |
0.00 |
Under Construction |
Scheme is reorganized as 20084189
Khiron G.O.V Reorganisational water Supply Scheme (Solar)
|
| 26 |
6699724 |
Manjhigawan w/s scheme |
1983-1984 |
PWS |
Completed |
15.87 |
15.87 |
15.87 |
0.00 |
Under Construction |
Scheme is reorganized as 20085566
MAJHIGAWAN G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR)
|
| 27 |
6699780 |
khargapur w/s scheme |
1983-1984 |
PWS |
Completed |
23.66 |
23.66 |
23.66 |
0.00 |
O&M |
Scheme is reorganized as
7345979
Khargapur QPV Scheme 2015 16 |
| 28 |
6699783 |
thulendi w/s scheme |
1976-1977 |
PWS |
Completed |
43.87 |
43.87 |
43.87 |
0.00 |
Under Construction |
Scheme is reorganized as
20084527
THULANDI Water Supply
|
| 29 |
6699837 |
sehgon w/s scheme |
1983-1984 |
PWS |
Completed |
40.00 |
40.00 |
40.00 |
0.00 |
Under Construction |
Scheme is reorganized as
20084571
SEHGON PASHCHIM Water Supply |
| 30 |
6700645 |
bhanw w/s scheme |
1980-1981 |
PWS |
Completed |
17.40 |
17.40 |
17.40 |
0.00 |
Under Construction |
|
| 31 |
6700665 |
rahi w/s scheme |
1970-1971 |
PWS |
Completed |
7.00 |
7.00 |
7.00 |
0.00 |
O&M |
Scheme is reorganized as
6845034
Rahi PWS
|
| 32 |
6700764 |
MON |
1980-1981 |
PWS |
Completed |
36.00 |
36.00 |
36.00 |
0.00 |
Under Construction |
Scheme is reorganized as
20086653
MON WATER SUPPLY |
| 33 |
6700793 |
PASCIM GANO W/S SCHEME |
1980-1981 |
PWS |
Completed |
19.84 |
19.84 |
19.84 |
0.00 |
Under Construction |
Scheme is reorganized as
20085622
PASCHIM GAON GROUP OF VILLAGES |
| 34 |
6700816 |
RADHOPUR |
1980-1981 |
PWS |
Completed |
13.19 |
13.19 |
13.19 |
0.00 |
Under Construction |
Scheme is reorganized as 20086029
RAGHOPUR Water Supply
|
| 35 |
6700823 |
Lodipur utarawan w/s scheme |
1982-1983 |
PWS |
Completed |
34.00 |
34.00 |
34.00 |
0.00 |
Under Construction |
Scheme is reorganized as 20086519
LODIPUR UTRAUWA GROUP OF VILLAGES
|
| 36 |
6700834 |
gandhawi w /s scheme |
1983-1984 |
PWS |
Completed |
13.44 |
13.44 |
13.44 |
0.00 |
O&M |
Scheme is reorganized as
7228575
GANDHAVI PWS SCHEME |
| 37 |
6700980 |
Aihar w/s scheme |
1974-1975 |
PWS |
Completed |
9.71 |
9.71 |
9.71 |
0.00 |
Under Construction |
Scheme is Reorganized as 20085544
AIHAR GROUP OF VILLAGES
|
| 38 |
6701043 |
ambara paschim w/s scheme |
1983-1984 |
PWS |
Completed |
31.78 |
31.78 |
31.78 |
0.00 |
Under Construction |
Scheme is Reorganized as 20084402
Ambara Paschim G.O.V Reorganisational water Supply Scheme (Solar)
|
| 39 |
6701059 |
kandranwa w/s scheme |
1983-1984 |
PWS |
Completed |
19.90 |
19.90 |
19.90 |
0.00 |
Under Construction |
Scheme is reorganized as 20086508
KAND RAWAN G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR)
|
| 40 |
6701081 |
JHOHWASHARKI W/S SCHEME |
1980-1981 |
PWS |
Completed |
27.35 |
27.35 |
27.35 |
0.00 |
Under Construction |
Scheme is reorganized as 20086068
JOHWAHISAR GROUP OF VILLAGES
|
| 41 |
6701090 |
BHOJPUR W/S SCHEME |
1978-1979 |
PWS |
Completed |
54.67 |
54.67 |
54.67 |
0.00 |
Under Construction |
|
| 42 |
6701098 |
bajpai pur w/s scheme |
1978-1979 |
PWS |
Completed |
6.80 |
6.80 |
6.80 |
0.00 |
Under Construction |
Scheme is reorganized as
20090058 Sondasi Water Supply Scheme in Phase -2 M/s NCC Ltd |
| 43 |
6701118 |
kharauli w/s scheme |
1985-1986 |
PWS |
Completed |
22.20 |
22.20 |
22.20 |
0.00 |
O&M |
Scheme is reorganized as 7197992
KHARAULI PWS SCHEMES
|
| 44 |
6701130 |
NEEMTEEKAR W/S SCHEME |
1982-1983 |
PWS |
Completed |
40.10 |
40.10 |
40.10 |
0.00 |
Under Construction |
Scheme is reorganized as 20084435
Neemtikar Group of Villages
|
| 45 |
6701150 |
PAHURI W/S SCHEME |
1983-1984 |
PWS |
Completed |
22.68 |
22.68 |
22.68 |
0.00 |
Under Construction |
Scheme is reorganized as 20085495
Pahuri G.O.V Reorganisational water Supply Scheme (Solar)
|
| 46 |
6701154 |
khajoorgaun w/s scheme |
1983-1984 |
PWS |
Completed |
18.36 |
18.36 |
18.36 |
0.00 |
Under Construction |
Scheme is reorganized as 20086102
Meethapur G.O.V water Supply Scheme (Solar)
|
| 47 |
6701177 |
ICHAULI W/S SCHEME |
1981-1982 |
PWS |
Completed |
41.54 |
41.54 |
41.54 |
0.00 |
Under Construction |
Scheme is reorganized as 20086021
Ichauli Water Supply
|
| 48 |
6701190 |
GOVIND PUR W/S SCHEME |
1978-1979 |
PWS |
Completed |
50.96 |
50.96 |
50.96 |
0.00 |
Under Construction |
Scheme is reorganized as 20084452
Govindpur G.O.V Reorganisational water Supply Scheme (Solar)
|
| 49 |
6701220 |
TILENDA W/S SCHEME |
1982-1983 |
PWS |
Completed |
29.71 |
29.71 |
29.71 |
0.00 |
Under Construction |
Scheme is reorganized as 20084524
TILENDA Water Supply
|
| 50 |
6701227 |
kamalpurpur w/s scheme |
1983-1984 |
PWS |
Completed |
18.00 |
18.00 |
18.00 |
0.00 |
Under Construction |
Scheme is reorganized as
20085473
KAMALPUR G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
| 51 |
6701233 |
SARAYN BAIRIYA KHERA W/S SCHEME |
1978-1979 |
PWS |
Completed |
3.12 |
3.12 |
3.12 |
0.00 |
Under Construction |
Scheme is reorganized as 20086123
SB Kheda G.O.V Reorganisational water Supply Scheme (Solar)
|
| 52 |
6701285 |
RAMKHERA W/S SCHEME |
1983-1984 |
PWS |
Completed |
26.20 |
26.20 |
26.20 |
0.00 |
Under Construction |
Scheme is reorganized as 20084310
RAMKHERA GROUP OF VILLEGAES
|
| 53 |
6701348 |
BALA W/S SCHEME |
1984-1985 |
PWS |
Completed |
15.87 |
15.87 |
15.87 |
0.00 |
Under Construction |
Scheme is Reorganized as 20085447
BALA GROUP OF VILLAGES
|
| 54 |
6701374 |
rasoolpur w/s scheme |
1983-1984 |
PWS |
Completed |
19.14 |
19.14 |
19.14 |
0.00 |
O&M |
Scheme is reorganized as 7208759
RASULPUR PWS SCHEME
|
| 55 |
6701377 |
Behata kalan w/s scheme |
1978-1979 |
PWS |
Completed |
78.79 |
78.79 |
78.79 |
0.00 |
Under Construction |
|
| 56 |
6701460 |
bannamau w/s scheme |
1978-1979 |
PWS |
Completed |
89.59 |
89.59 |
89.59 |
0.00 |
Under Construction |
Scheme is Reorganized as 20086769
Bannamau G.O.V Reorganisational water Supply Scheme (Solar)
|
| 57 |
6701462 |
bhrahmajeetpur w/s scheme |
1983-1984 |
PWS |
Completed |
18.50 |
18.50 |
18.50 |
0.00 |
Under Construction |
|
| 58 |
6701500 |
mirjapur aihari w/s scheme |
1983-1984 |
PWS |
Completed |
13.64 |
13.64 |
13.64 |
0.00 |
Under Construction |
Scheme is reorganized as 20084389
MIRAZAPUR AIHARI G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR)
|
| 59 |
6701525 |
jagatpur w/s scheme |
1978-1979 |
PWS |
Completed |
45.80 |
45.80 |
45.80 |
0.00 |
O&M |
Scheme is reorganized as 7208594
JAGATPUR PWS SCHEME(SAGY)
|
| 60 |
6845034 |
Rahi PWS |
2014-2015 |
PWS |
Ongoing |
307.98 |
307.98 |
294.42 |
13.56 |
O&M |
|
| 61 |
6845317 |
Terukha PWS |
2014-2015 |
PWS |
Completed |
302.63 |
299.17 |
299.17 |
0.00 |
O&M |
|
| 62 |
7197809 |
JHOHWASARKI PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
626.28 |
601.66 |
601.66 |
0.00 |
O&M |
|
| 63 |
7197862 |
SEMRI PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
260.41 |
258.49 |
258.49 |
0.00 |
O&M |
|
| 64 |
7197966 |
BELAKHARA PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
309.80 |
309.80 |
257.52 |
52.28 |
O&M |
|
| 65 |
7197992 |
KHARAULI PWS SCHEMES |
2014-2015 |
PWS |
Ongoing |
632.58 |
631.58 |
548.49 |
83.09 |
O&M |
|
| 66 |
7198020 |
GAURA HARDO PWS SCHEMES |
2014-2015 |
Retrofit |
Ongoing |
400.69 |
400.18 |
400.18 |
0.00 |
O&M |
|
| 67 |
7198051 |
PAHO PWS SCHEME |
2014-2015 |
PWS |
Completed |
209.72 |
209.72 |
209.72 |
0.00 |
O&M |
|
| 68 |
7201390 |
ITAURA BUJURG PWS |
2014-2015 |
PWS |
Ongoing |
794.36 |
794.36 |
671.30 |
123.06 |
Under Construction |
|
| 69 |
7206360 |
UNCHAHAR DEHAT PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
699.71 |
694.82 |
691.63 |
3.19 |
O&M |
|
| 70 |
7208562 |
BEHTA KALA PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
2244.44 |
2244.44 |
2217.71 |
26.73 |
Under Construction |
|
| 71 |
7208594 |
JAGATPUR PWS SCHEME(SAGY) |
2014-2015 |
PWS |
Ongoing |
2461.16 |
2461.16 |
1812.68 |
648.48 |
O&M |
|
| 72 |
7208605 |
KOTRA BAHADURGANJ PES SCHEME (Retrofitting) |
2014-2015 |
Retrofit |
Ongoing |
251.25 |
250.73 |
250.73 |
0.00 |
O&M |
|
| 73 |
7208752 |
BAKULIHA PWS SCHEME |
2014-2015 |
PWS |
Completed |
282.50 |
282.50 |
282.50 |
0.00 |
O&M |
|
| 74 |
7208759 |
RASULPUR PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
360.16 |
356.82 |
356.82 |
0.00 |
O&M |
|
| 75 |
7208762 |
KORIHAR PWS SCHEME |
2014-2015 |
PWS |
Completed |
578.32 |
578.32 |
578.32 |
0.00 |
O&M |
|
| 76 |
7228575 |
GANDHAVI PWS SCHEME |
2014-2015 |
PWS |
Ongoing |
705.72 |
705.56 |
700.40 |
5.16 |
O&M |
|
| 77 |
7232270 |
KANNAWA PWS SCHEME |
2009-2010 |
PWS |
Completed |
48.73 |
48.73 |
48.73 |
0.00 |
O&M |
|
| 78 |
7232367 |
TUKARIDANDU PWS SCHEME |
2010-2011 |
PWS |
Completed |
125.50 |
125.50 |
125.50 |
0.00 |
O&M |
|
| 79 |
7345861 |
Shekhpur Samodha PWS scheme 2015 16 |
2015-2016 |
PWS |
Completed |
164.43 |
164.43 |
164.43 |
0.00 |
O&M |
Work cost is 138.10 but system does not allow to feed because expenditure is more .
|
| 80 |
7345911 |
Bhitri PWS Scheme 2015 16 |
2015-2016 |
PWS |
Completed |
183.52 |
174.38 |
174.38 |
0.00 |
O&M |
|
| 81 |
7345956 |
Bijemau Khapura QPV Scheme 2015 16 |
2015-2016 |
PWS |
Completed |
209.50 |
209.50 |
209.50 |
0.00 |
O&M |
|
| 82 |
7345979 |
Khargapur QPV Scheme 2015 16 |
2015-2016 |
PWS |
Completed |
174.01 |
124.22 |
124.22 |
0.00 |
O&M |
|
| 83 |
7506611 |
Bela Bhela PWS Scheme |
2016-2017 |
PWS |
Completed |
827.56 |
827.56 |
783.87 |
43.69 |
O&M |
|
| 84 |
7621558 |
JAGDEESHPUR Single Village Scheme(SAGY) |
2016-2017 |
PWS |
Completed |
242.26 |
242.26 |
242.26 |
0.00 |
O&M |
|
| 85 |
7996490 |
Jagdishpur Retrofitting |
2020-2021 |
PWS |
Ongoing |
45.86 |
40.29 |
37.47 |
2.82 |
O&M |
|
| 86 |
7998129 |
Shekhpur Samodha |
2020-2021 |
Retrofit |
Ongoing |
46.45 |
42.54 |
42.54 |
0.00 |
O&M |
|
| 87 |
8015696 |
Mau Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
46.96 |
46.96 |
45.46 |
1.50 |
O&M |
|
| 88 |
8015703 |
Bahai |
2020-2021 |
Retrofit |
Ongoing |
91.80 |
74.66 |
74.66 |
0.00 |
O&M |
|
| 89 |
8157386 |
Terukha |
2019-2020 |
Retrofit |
Ongoing |
45.90 |
43.97 |
43.97 |
0.00 |
O&M |
|
| 90 |
8162870 |
Gaura Hardo Retrofitting |
2020-2021 |
PWS |
Ongoing |
45.84 |
41.87 |
41.87 |
0.00 |
O&M |
|
| 91 |
8165563 |
Johwa sarki retrofitting |
2020-2021 |
Retrofit |
Ongoing |
89.43 |
42.34 |
42.34 |
0.00 |
O&M |
|
| 92 |
8165596 |
Paho Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
85.86 |
85.45 |
80.45 |
5.00 |
O&M |
|
| 93 |
8165611 |
Bhitri Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
48.04 |
38.07 |
38.07 |
0.00 |
O&M |
|
| 94 |
8165622 |
Semri Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
57.19 |
39.69 |
39.69 |
0.00 |
O&M |
|
| 95 |
8165635 |
Khargapur Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
63.27 |
61.10 |
56.10 |
5.00 |
O&M |
|
| 96 |
8165649 |
Bejimau Khapura Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
93.35 |
88.88 |
83.88 |
5.00 |
O&M |
|
| 97 |
8165662 |
Bakuliha Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
93.23 |
85.24 |
74.44 |
10.80 |
O&M |
|
| 98 |
8165675 |
Sidhauna Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
108.36 |
67.32 |
65.28 |
2.04 |
O&M |
|
| 99 |
8165695 |
Jalalpur dhai retrofitting |
2020-2021 |
Retrofit |
Ongoing |
95.62 |
92.54 |
90.54 |
2.00 |
O&M |
|
| 100 |
8165718 |
Bheetergaon retrofitting |
2020-2021 |
Retrofit |
Ongoing |
123.78 |
105.14 |
95.34 |
9.80 |
O&M |
|
| 101 |
8165738 |
Rasoolpur Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
85.48 |
49.26 |
49.26 |
0.00 |
O&M |
|
| 102 |
8165752 |
Tikari dadu Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
151.06 |
118.97 |
103.52 |
15.45 |
O&M |
|
| 103 |
8165798 |
Kannawan Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
87.31 |
80.38 |
80.38 |
0.00 |
O&M |
|
| 104 |
8165936 |
Dighiya Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
70.51 |
70.08 |
70.08 |
0.00 |
O&M |
|
| 105 |
8165960 |
Belabhela Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
205.51 |
135.62 |
134.10 |
1.52 |
O&M |
|
| 106 |
8166259 |
Belakhar retrofitting |
2020-2021 |
Retrofit |
Ongoing |
83.29 |
60.08 |
58.17 |
1.91 |
O&M |
|
| 107 |
8166270 |
Hathnasa retrofitting |
2020-2021 |
Retrofit |
Ongoing |
73.64 |
73.64 |
71.98 |
1.66 |
O&M |
|
| 108 |
8166279 |
Hasnapur retrofitting |
2020-2021 |
Retrofit |
Ongoing |
52.76 |
52.76 |
41.33 |
11.43 |
O&M |
|
| 109 |
8166436 |
Tejgaon Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
81.83 |
80.23 |
75.23 |
5.00 |
O&M |
|
| 110 |
8166444 |
Dhuri khara retrofitting |
2020-2021 |
Retrofit |
Ongoing |
88.63 |
80.10 |
76.00 |
4.10 |
O&M |
|
| 111 |
8166534 |
Jagatpur Bhichkaura Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
68.62 |
60.71 |
53.28 |
7.43 |
O&M |
|
| 112 |
8166547 |
Semarpaha retrofitting |
2020-2021 |
Retrofit |
Ongoing |
155.90 |
135.17 |
126.17 |
9.00 |
O&M |
|
| 113 |
8166564 |
Gandhavi Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
180.26 |
167.65 |
111.81 |
55.84 |
O&M |
|
| 114 |
8166574 |
Kharauli Retrofitting |
2020-2021 |
Retrofit |
Ongoing |
153.26 |
115.74 |
99.79 |
15.95 |
O&M |
|
| 115 |
8168302 |
Unchahar Dehat retrofitting |
2020-2021 |
Retrofit |
Ongoing |
152.05 |
139.70 |
114.70 |
25.00 |
O&M |
|
| 116 |
8168318 |
Rahi retrofitting |
2020-2021 |
Retrofit |
Ongoing |
82.03 |
73.58 |
47.44 |
26.14 |
O&M |
|
| 117 |
20084189 |
Khiron G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
2236.00 |
2236.00 |
1250.14 |
985.86 |
Under Construction |
|
| 118 |
20084310 |
RAMKHERA GROUP OF VILLEGAES |
2022-2023 |
Retrofit |
Ongoing |
666.70 |
666.70 |
34.15 |
632.55 |
Under Construction |
|
| 119 |
20084337 |
NERTHUWA GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
1922.61 |
1922.61 |
291.35 |
1631.26 |
Under Construction |
|
| 120 |
20084389 |
MIRAZAPUR AIHARI G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
2022-2023 |
Retrofit |
Ongoing |
1335.05 |
1335.05 |
306.25 |
1028.80 |
Under Construction |
|
| 121 |
20084402 |
Ambara Paschim G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
2077.32 |
2077.32 |
355.95 |
1721.37 |
Under Construction |
|
| 122 |
20084435 |
Neemtikar Group of Villages |
2022-2023 |
Retrofit |
Ongoing |
1596.90 |
1596.90 |
217.62 |
1379.28 |
Under Construction |
|
| 123 |
20084452 |
Govindpur G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
1621.23 |
1621.23 |
720.43 |
900.80 |
Under Construction |
|
| 124 |
20084524 |
TILENDA Water Supply |
2022-2023 |
Retrofit |
Ongoing |
238.44 |
238.44 |
101.76 |
136.68 |
Under Construction |
|
| 125 |
20084527 |
THULANDI Water Supply |
2022-2023 |
Retrofit |
Ongoing |
1575.16 |
1575.16 |
144.23 |
1430.93 |
Under Construction |
|
| 126 |
20084571 |
SEHGON PASHCHIM Water Supply |
2022-2023 |
Retrofit |
Ongoing |
784.18 |
784.18 |
151.18 |
633.00 |
Under Construction |
|
| 127 |
20085243 |
PAKHRAULI GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
953.40 |
953.40 |
214.52 |
738.88 |
Under Construction |
|
| 128 |
20085256 |
DEVLI GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
696.74 |
696.74 |
342.20 |
354.54 |
Under Construction |
|
| 129 |
20085429 |
BEHATA KALAN GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
1701.01 |
1701.01 |
337.26 |
1363.75 |
Under Construction |
|
| 130 |
20085447 |
BALA GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
1577.47 |
1577.47 |
109.72 |
1467.75 |
Under Construction |
|
| 131 |
20085473 |
KAMALPUR G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
2022-2023 |
Retrofit |
Ongoing |
952.96 |
952.96 |
145.57 |
807.39 |
Under Construction |
|
| 132 |
20085495 |
Pahuri G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
746.78 |
746.78 |
155.04 |
591.74 |
Under Construction |
|
| 133 |
20085544 |
AIHAR GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
2004.50 |
2004.50 |
180.84 |
1823.66 |
Under Construction |
|
| 134 |
20085566 |
MAJHIGAWAN G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
2022-2023 |
Retrofit |
Ongoing |
1140.00 |
1140.00 |
72.12 |
1067.88 |
Under Construction |
|
| 135 |
20085622 |
PASCHIM GAON GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
980.70 |
980.70 |
277.15 |
703.55 |
Under Construction |
|
| 136 |
20085997 |
BARAMJITPUR URF KHWATA G.O.V. |
2022-2023 |
Retrofit |
Ongoing |
959.00 |
959.00 |
57.34 |
901.66 |
Under Construction |
|
| 137 |
20086021 |
Ichauli Water Supply |
2022-2023 |
Retrofit |
Ongoing |
1065.37 |
1065.37 |
185.84 |
879.53 |
Under Construction |
|
| 138 |
20086029 |
RAGHOPUR Water Supply |
2022-2023 |
Retrofit |
Ongoing |
740.17 |
740.17 |
67.10 |
673.07 |
Under Construction |
|
| 139 |
20086036 |
Siwan Group of villages |
2022-2023 |
Retrofit |
Ongoing |
1264.63 |
1264.63 |
434.07 |
830.56 |
Under Construction |
|
| 140 |
20086068 |
JOHWAHISAR GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
1522.06 |
1522.06 |
121.21 |
1400.85 |
Under Construction |
|
| 141 |
20086102 |
Meethapur G.O.V water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
261.37 |
261.37 |
50.95 |
210.42 |
Under Construction |
|
| 142 |
20086123 |
SB Kheda G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
502.01 |
502.01 |
55.94 |
446.07 |
Under Construction |
|
| 143 |
20086495 |
Sareni GOV water supply scheme |
1973-1974 |
PWS |
Completed |
6.80 |
6.80 |
6.80 |
0.00 |
Under Construction |
Scheme is reorganized as
20095385
Sareni G.O.V Reorganisational water Supply Scheme (Solar) |
| 144 |
20086508 |
KAND RAWAN G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
2022-2023 |
Retrofit |
Ongoing |
3160.70 |
3160.70 |
171.46 |
2989.24 |
Under Construction |
|
| 145 |
20086516 |
Ninawa GOV Water Supply scheme |
1985-1986 |
PWS |
Completed |
31.62 |
31.62 |
31.62 |
0.00 |
Under Construction |
Scheme is reorganized as 20095377
NINAWAN (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
|
| 146 |
20086519 |
LODIPUR UTRAUWA GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
2346.99 |
2346.99 |
256.39 |
2090.60 |
Under Construction |
|
| 147 |
20086522 |
Sundaha GOV water supply scheme |
1983-1984 |
PWS |
Completed |
22.83 |
22.83 |
22.83 |
0.00 |
Under Construction |
Scheme is reorganized as
20095374
SANDAHA (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
| 148 |
20086524 |
Kunwarmau GOV water supply scheme |
1980-1981 |
PWS |
Completed |
45.83 |
45.83 |
45.83 |
0.00 |
Under Construction |
Scheme is reorganized as 20095128
KUNWAR MAU (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
|
| 149 |
20086602 |
ASRAFPUR GOV water supply scheme |
1978-1979 |
PWS |
Completed |
25.70 |
25.70 |
25.70 |
0.00 |
Under Construction |
Scheme is Reorganized as 20095120
ASRAFPUR (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
|
| 150 |
20086618 |
Deeh GOV water supply scheme |
1980-1981 |
PWS |
Completed |
33.20 |
33.20 |
33.20 |
0.00 |
Under Construction |
Scheme is reorganized as 20095094
DEEH (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
| 151 |
20086629 |
AASHARASSEDPUR GOV water supply scheme |
1985-1986 |
PWS |
Completed |
29.98 |
29.98 |
29.98 |
0.00 |
Under Construction |
Scheme is Reorganized as 20095392
ASHA RASIDPUR (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
| 152 |
20086638 |
BHAON GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
3679.68 |
3679.68 |
921.65 |
2758.03 |
Under Construction |
|
| 153 |
20086646 |
Firojpur GOV water supply scheme |
1978-1979 |
PWS |
Completed |
78.25 |
78.25 |
78.25 |
0.00 |
Under Construction |
Scheme is reorganized as 20095086
FIROJPUR G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
| 154 |
20086653 |
MON WATER SUPPLY |
2022-2023 |
Retrofit |
Ongoing |
3603.60 |
3603.60 |
611.66 |
2991.94 |
Under Construction |
|
| 155 |
20086655 |
Harchandpur GOV water supply scheme |
1973-1974 |
PWS |
Completed |
14.62 |
14.62 |
14.62 |
0.00 |
Under Construction |
Scheme is reorganized as 20094863
HARCHANDPUR GROUP OF VILLAGES
|
| 156 |
20086676 |
GHURWARA GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
2296.30 |
2296.30 |
471.80 |
1824.50 |
Under Construction |
|
| 157 |
20086724 |
BHojpur G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
3616.33 |
3616.33 |
419.09 |
3197.24 |
Under Construction |
|
| 158 |
20086769 |
Bannamau G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
2826.62 |
2826.62 |
362.36 |
2464.26 |
Under Construction |
|
| 159 |
20086782 |
SHIVGARH WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
1296.20 |
1296.20 |
292.37 |
1003.83 |
Under Construction |
|
| 160 |
20094041 |
Rukunpur Retrofitting Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
73.93 |
55.85 |
55.05 |
0.80 |
O&M |
|
| 161 |
20094138 |
UttatraGauri Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
83.72 |
74.83 |
74.83 |
0.00 |
O&M |
|
| 162 |
20094611 |
Korihar Retrofitting Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
190.16 |
177.25 |
170.40 |
6.85 |
O&M |
|
| 163 |
20094649 |
Sultanpur khera Retrofitting Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
180.46 |
102.09 |
20.99 |
81.10 |
O&M |
|
| 164 |
20094660 |
Bardar Retrofitting Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
169.39 |
107.18 |
100.56 |
6.62 |
O&M |
|
| 165 |
20094672 |
Gojhari Retrofiiting Water Supply Scheme |
2020-2021 |
Retrofit |
Ongoing |
117.71 |
80.94 |
61.05 |
19.89 |
O&M |
|
| 166 |
20094863 |
HARCHANDPUR GROUP OF VILLAGES |
2022-2023 |
Retrofit |
Ongoing |
1158.50 |
1158.50 |
61.06 |
1097.44 |
Under Construction |
|
| 167 |
20095069 |
Kotara bahadurganj |
2020-2021 |
PWS |
Ongoing |
63.59 |
37.04 |
37.04 |
0.00 |
O&M |
|
| 168 |
20095086 |
FIROJPUR G.O.V. REORGANIZATION WATER SUPPLY SCHEME (SOLAR) |
2022-2023 |
Retrofit |
Ongoing |
612.00 |
612.00 |
35.66 |
576.34 |
Under Construction |
|
| 169 |
20095087 |
Itaura Bujurg Retrofitting water supply scheme |
2020-2021 |
PWS |
Ongoing |
195.69 |
99.93 |
73.83 |
26.10 |
O&M |
|
| 170 |
20095091 |
Jagatpur retrofitting water supply scheme |
2020-2021 |
PWS |
Ongoing |
234.22 |
62.28 |
58.78 |
3.50 |
O&M |
|
| 171 |
20095094 |
DEEH (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
3529.83 |
3529.83 |
815.09 |
2714.74 |
Under Construction |
|
| 172 |
20095120 |
ASRAFPUR (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
1909.90 |
1909.90 |
234.57 |
1675.33 |
Under Construction |
|
| 173 |
20095128 |
KUNWAR MAU (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
1016.91 |
1016.91 |
66.75 |
950.16 |
Under Construction |
|
| 174 |
20095374 |
SANDAHA (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
648.09 |
648.09 |
206.19 |
441.90 |
Under Construction |
|
| 175 |
20095377 |
NINAWAN (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
882.61 |
882.61 |
117.99 |
764.62 |
Under Construction |
|
| 176 |
20095382 |
Ralpur G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
1480.00 |
1480.00 |
659.97 |
820.03 |
Under Construction |
|
| 177 |
20095385 |
Sareni G.O.V Reorganisational water Supply Scheme (Solar) |
2022-2023 |
Retrofit |
Ongoing |
1296.10 |
1296.10 |
140.02 |
1156.08 |
Under Construction |
|
| 178 |
20095392 |
ASHA RASIDPUR (REORGANIZATION) GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME |
2022-2023 |
Retrofit |
Ongoing |
1926.67 |
1926.67 |
0.00 |
1926.67 |
Under Construction |
|