Jal Jeevan Mission - Azamgarh

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ECO PROTECTION ENGINEER 111 344 228 108
82
38
67
183
31
91
13
70
9
27
12
62
1 111 80
2 GA INFRA - BABA (JV) 128 303 184 99
26
59
60
161
27
59
41
83
9
24
41
83
0 129 100
3 GAJA - SGIPL (JV) 121 389 83 32
14
37
14
50
14
43
93
297
6
13
85
272
0 121 63
4 LC INFRA 402 856 324 165
87
72
126
257
109
213
167
388
7
12
156
364
0 401 254
5 SIEPL – BRCCPL (JV) / SKYLARK 117 291 115 34
19
62
35
93
18
40
64
159
4
10
62
149
0 116 85
6 M/s Sudhakara Infratech Pvt. Ltd 429 1145 575 199
168
208
101
262
75
241
253
658
57
137
203
545
1 430 232
7 VIKRAN-VPRPL (JV) 152 302 101 18
34
49
32
61
25
57
95
189
12
21
90
177
0 151 81
8 Sudhakara Infratech 94 172 66 44
18
4
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 1554 3802 1676 699
448
529
435
1067
299
744
726
1844
104
244
649
1652
2 1459 895


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 M/s Sudhakara Infratech Pvt. Ltd 1 0 0 1 0 3 5 1 0 0 0 0 1 2
Total 1 0 0 1 0 3 5 1 0 0 0 0 1 2
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 ECO PROTECTION ENGINEER 15 1 0 0 272
2 GA INFRA - BABA (JV) 95 1 0 0 252
3 GAJA - SGIPL (JV) 4 0 0 0 281
4 LC INFRA 141 1 0 0 525
5 SIEPL – BRCCPL (JV) / SKYLARK 39 3 0 0 210
6 M/s Sudhakara Infratech Pvt. Ltd 31 1 0 0 889
7 VIKRAN-VPRPL (JV) 4 1 0 0 208
Total 329 8 0 0 2637
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 1500 1484 98.93
2 Pump House 1500 1452 96.80
3 Chlorination system 842 770 91.45
4 OHT 1459 1435/895 98.36
5 Distribution (Line Laying in Km.) 19353 18399 95.07
6 Solar Plant 1430 1144 80.00
7 F.H.T.C. 623970 591901 94.86
9 ROAD DISMENTLING/RESTORATION(KM) 7155 6977 97.51
10 Villages where 100 % road restoration completed 2636 2644 100.00
11 Comissioning of Village 3630 1611 44.38
12 Regular water supply 3630 1772 48.82
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 ECO PROTECTION ENGINEER 111 88 65 67 67 63
2 GA INFRA - BABA (JV) 128 67 51 60 54 42
3 GAJA - SGIPL (JV) 121 26 9 14 7 3
4 LC INFRA 402 115 94 126 103 85
5 SIEPL – BRCCPL (JV) / SKYLARK 117 43 38 35 31 31
6 M/s Sudhakara Infratech Pvt. Ltd 429 110 87 101 80 69
7 VIKRAN-VPRPL (JV) 152 14 12 32 8 7
Total 1460 463 356 435 350 300
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 VIKRAN-VPRPL (JV) 98 53 45 12 5 7
2 GAJA - SGIPL (JV) 140 44 96 13 6 7
3 GA INFRA - BABA (JV) 222 172 50 151 128 23
4 ECO PROTECTION ENGINEER 200 165 35 142 115 27
5 SIEPL – BRCCPL (JV) / SKYLARK 139 68 71 64 35 29
6 M/s Sudhakara Infratech Pvt. Ltd 519 453 66 227 201 26
7 LC INFRA 480 420 60 290 237 53
Total 1798 1375 423 899 727 172
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 12 10
1 8359685 SIKRAURA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME LC INFRA 1 0 03-04-2026 09:15 AM
2 8388634 HARAKHPURA KHAS LC INFRA 1 1 03-04-2026 09:04 AM
3 20013092 Mahumudulla water supply scheme LC INFRA 1 1 03-04-2026 09:16 AM
4 20013096 Moiya Makhdumpur LC INFRA 1 1 03-04-2026 09:16 AM
5 20013331 DEWARA KADIM WATER SUPPLY SCHEME LC INFRA 1 1 03-04-2026 09:15 AM
6 20015455 Pawani kala water supply scheme LC INFRA 1 1 03-04-2026 09:15 AM
7 20016717 SAKATPUR WATER SUPPLY SCHEME LC INFRA 1 0 03-04-2026 09:04 AM
8 20021800 ASAUR WATER SUPPLY SCHEME GA INFRA - BABA (JV) 2 2 03-04-2026 09:15 AM
9 20021830 KASBA SARAI WATER SUPPLY SCHEME GA INFRA - BABA (JV) 2 2 03-04-2026 09:15 AM
10 20021834 PASHIM PATTI WATER SUPPLY SCHEME GA INFRA - BABA (JV) 1 1 03-04-2026 09:13 AM
Department Contact Number
S.No. Name Designation Monile No.
1 Rajendra Kumar Executive Engineer 9473942706
2 Azamgarh DM 9454417521
3 Pinku singh Chauhan JE 9450645426
4 Rajendra Kumar JE 8090829165
5 Abhimanyu Gupta JE 8355079020
6 AtikAnsari JE 7390840644
7 Swatantra rao JE 7210433907
8 Ravi Kumar Patel JE 8931074519
9 Abhishek kumar singh JE 9140284305
10 Vikas kushwaha JE 8948412290
11 Manish Maurya JE 9451615067
12 Rajendra Kumar_ JE 8090829165
13 INDRASEN CHAKRABORTY JE 9628931574
14 Rajendra Kumar JE 8090829165
15 RAJSHEKAR JE 8753673733
16 Satyaprakash JE 8840312648
17 Vijay Pratap Yadav JE 9838941497
18 Deepak Yadav JE 8808782256
19 Azamgarh EE E AND M 9512113735
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 07-Jan-2026 MOM of DWSM meeting month December 2025
2 07-Nov-2025 DWSM meeting for month October2025
3 10-Oct-2025 DWSM meeting MOM for month September 2025
4 04-Sep-2025 Monthly proogress review meeting for August 2025
5 28-Jul-2025 A meeting was held with the agency in which the review of the pending schemes from the last 2 years and 3 years was conducted.
6 04-Jul-2025 A meeting was held with the agency in which the review of the pending schemes from the last 2 years and 3 years was conducted.
7 22-May-2025 The monthly progress reports of all agencies were reviewed.
8 07-Apr-2025 The monthly progress reports of all agencies were reviewed.