Jal Jeevan Mission - Bijnor

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 LC INFRA 301 641 613 584
23
6
123
237
92
219
86
189
85
191
3
6
0 301 213
2 Vindhya-GAJA (JV) 606 1324 1122 804
158
160
53
104
238
514
315
708
296
650
71
156
0 598 246
3 SSNR Projects Private Limited 99 158 92 85
5
2
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 1006 2123 1827 1473
186
168
176
341
330
733
401
897
381
841
74
162
0 899 459


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Vindhya-GAJA (JV) 6 3 0 0 0 1 10 6 3 0 0 0 1 10
Total 6 3 0 0 0 1 10 6 3 0 0 0 1 10
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 LC INFRA 270 1 0 0 564
2 Vindhya-GAJA (JV) 136 3 0 0 1195
Total 406 4 0 0 1759
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 913 913 100.00
2 Pump House 913 909 99.56
3 Chlorination system 796 706 88.69
4 OHT 899 896/459 99.67
5 Distribution (Line Laying in Km.) 7649 7292 95.33
6 Solar Plant 888 867 97.64
7 F.H.T.C. 516760 507813 98.27
9 ROAD DISMENTLING/RESTORATION(KM) 3445 3407 98.90
10 Villages where 100 % road restoration completed 1758 1764 100.00
11 Comissioning of Village 1965 1798 91.50
12 Regular water supply 1965 1792 91.20
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 LC INFRA 301 122 106 123 115 99
2 Vindhya-GAJA (JV) 606 108 76 53 34 23
Total 907 230 182 176 149 122
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 LC INFRA 526 505 21 243 237 6
2 Vindhya-GAJA (JV) 983 906 77 86 76 10
Total 1509 1411 98 329 313 16
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 22 18
1 8360938 KALANPUR BUZURG (111951) GRAMPANCHAYAT WATER SUPPLY SCHEME LC INFRA 2 2 03-04-2026 09:14 AM
2 8361017 BASANTPUR VILLAGE WATER SCHEME LC INFRA 3 3 03-04-2026 09:04 AM
3 8388726 SHERGARH, BAHADAR NAGAR, TAIMOORABAD SAHALIPUR VILLAGE WATER SUPPLY SCHEME LC INFRA 4 4 03-04-2026 09:14 AM
4 8388774 GHANSURPUR VILLAGE WATER SCHEME LC INFRA 3 0 03-04-2026 09:04 AM
5 8388820 BARAMJITPUR CHANDA GRAMPANCHAYAT WATER SUPPLY SCHEME LC INFRA 2 2 03-04-2026 09:14 AM
6 20011272 Ajdev LC INFRA 1 1 03-04-2026 09:14 AM
7 20018328 Sungarpur Water Supply Scheme LC INFRA 1 1 03-04-2026 09:14 AM
8 20019380 Kashmiri Abbunasarpur Water Supply LC INFRA 1 1 03-04-2026 09:14 AM
9 20020694 Khairullapur Bila Ahatmali Gram Panchayat Water Supply Vindhya-GAJA (JV) 2 2 03-04-2026 09:11 AM
10 20022082 Alhaidadpur Khajwa & Benipur Gram Panchayat Water Supply Vindhya-GAJA (JV) 3 2 03-04-2026 09:20 AM
Department Contact Number
S.No. Name Designation Monile No.
1 Rakesh Chaudhary Executive Engineer 9473942620
2 Bijnor DM 9454417570
3 M.Ali JE 9532501423
4 Sandeep Patel JE 8393969845
5 Rahul Yadav JE 7571012004
6 Pradeep JE 9532501304
7 Bharat Singh JE 7417988883
8 Ankit Verma JE 8874767216
9 Bijnor EE E AND M 9639227848
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 18-Jun-2025 DWSM Meeting
2 19-Apr-2025 Regarding Slow Progress meeting with agencies of Jal Jeevan Mission
3 17-Oct-2024 dwsm Meeting
4 07-Jun-2024 dwsm Meeting
5 27-Apr-2024 DWSM Meeting