Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 NCC Ltd. 2 2 2 1
0
1
0
0
0
0
2
2
1
1
0
0
0 2 1
2 PNC-SPML-JV 863 1441 869 483
132
254
150
216
95
160
618
1067
233
377
305
571
1 857 363
3 Whoodhill Infrastructure LTD 25 29 27 1
0
26
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 890 1472 898 485
132
281
150
216
95
160
620
1069
234
378
305
571
1 859 364


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 NCC Ltd. 1 0 0 0 0 0 1 0 0 0 0 0 0 0
Total 1 0 0 0 0 0 1 0 0 0 0 0 0 0
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 NCC Ltd. 0 0 0 0 2
2 PNC-SPML-JV 432 11 0 0 1018
Total 432 11 0 0 1020
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 859 859 100.00
2 Pump House 859 862 100.00
3 Chlorination system 469 456 97.23
4 OHT 859 856/364 99.65
5 Distribution (Line Laying in Km.) 7003 7003 100.00
6 Solar Plant 842 812 96.44
7 F.H.T.C. 450229 445621 98.98
9 ROAD DISMENTLING/RESTORATION(KM) 5338 5248 98.31
10 Villages where 100 % road restoration completed 1020 1022 100.00
11 Comissioning of Village 1443 941 65.21
12 Regular water supply 1443 872 60.43
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 NCC Ltd. 2 0
2 PNC-SPML-JV 864 148 52 150 118 41
Total 866 148 52 150 118 41
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 NCC Ltd. 2 2 0 0
2 PNC-SPML-JV 1321 1224 97 410 377 33
Total 1323 1226 97 410 377 33
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 20 20
1 20007678 Atsena W/s Scheme PNC-SPML-JV 3 3 03-04-2026 09:22 AM
2 20008590 Ahmadnagar Rukhada Water Supply Scheme PNC-SPML-JV 3 3 03-04-2026 09:22 AM
3 20024306 KHANPUR DAYA PNC-SPML-JV 2 2 03-04-2026 09:22 AM
4 20024346 simaria PNC-SPML-JV 2 2 03-04-2026 09:22 AM
5 20024378 Ratanpur PNC-SPML-JV 2 2 03-04-2026 08:52 AM
6 20057345 Bhagautipur water supply scheme PNC-SPML-JV 2 2 03-04-2026 09:20 AM
7 20057494 Salempur bamni water supply scheme PNC-SPML-JV 3 3 03-04-2026 09:13 AM
8 20085919 BHASRALA WATER SUPPLY SCHEME PNC-SPML-JV 1 1 03-04-2026 09:20 AM
9 20090021 NARAURI NARAURA WATER SUPPLY SCHEME PNC-SPML-JV 1 1 03-04-2026 09:22 AM
10 Off 20007681 Navi Ganj water supply scheme PNC-SPML-JV 1 1 03-04-2026 08:12 AM
Department Contact Number
S.No. Name Designation Monile No.
1 NARINDER VERMA Executive Engineer 9473942570
2 Budaun DM 9454417525
3 NAVEEN KUMAR JE 8318251701
4 PARVIND KUMAR JE 8318883881
5 RAVI KASHYAP JE 9807712057
6 MANISH KUMAR JE 7376966651
7 Sohail Ahmed JE 8791836005
8 Budaun EE E AND M 9897236551
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 07-May-2025 Minutes of meeting
2 30-Apr-2025 Minutes of the meeting