Jal Jeevan Mission - Chandauli

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 GA INFRA - BABA (JV) 98 267 205 173
21
11
81
205
2
11
15
51
0
0
15
51
0 98 84
2 HFCL- JWIL (JV) 84 272 104 73
15
16
12
40
21
63
51
169
18
54
45
153
1 85 22
3 ION EXCHANGE 164 588 184 157
14
13
22
52
41
234
101
303
32
69
97
287
0 178 54
4 VSA 127 232 88 81
6
1
26
37
25
43
76
154
19
29
68
137
0 127 56
5 East India Udhyog- Kaveri JV 1 88 0 0
0
0
0
0
0
0
1
88
0
0
1
88
0 9 0
6 GA Infra Private Limited 26 58 56 14
15
27
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 500 1505 637 498
71
68
141
334
89
351
244
765
69
152
226
716
1 497 216


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No RWS disruption found
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 GA INFRA - BABA (JV) 89 2 0 0 207
2 HFCL- JWIL (JV) 11 2 0 0 171
3 ION EXCHANGE 77 1 0 0 411
4 VSA 43 2 0 0 162
5 East India Udhyog- Kaveri JV 6 0 0 0 0
Total 226 7 0 0 951
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 551 539 97.82
2 Pump House 551 521 94.56
3 Chlorination system 307 304 99.02
4 OHT 506 489/218 96.64
5 Distribution (Line Laying in Km.) 8151 7425 91.09
6 Solar Plant 399 361 90.48
7 F.H.T.C. 284094 267803 94.27
9 ROAD DISMENTLING/RESTORATION(KM) 5374 5302 98.66
10 Villages where 100 % road restoration completed 951 952 100.00
11 Comissioning of Village 1447 720 49.76
12 Regular water supply 1447 573 39.60
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 GA INFRA - BABA (JV) 98 76 61 81 75 61
2 HFCL- JWIL (JV) 84 30 16 12 12 8
3 ION EXCHANGE 164 69 56 22 22 20
4 VSA 127 47 45 26 25 24
5 East India Udhyog- Kaveri JV 1 0
Total 474 222 178 141 134 113
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 East India Udhyog- Kaveri JV 36 35 1 0
2 GA INFRA - BABA (JV) 284 277 7 269 262 7
3 ION EXCHANGE 431 391 40 69 54 15
4 HFCL- JWIL (JV) 129 109 20 45 35 10
5 VSA 319 288 31 106 95 11
Total 1199 1100 99 489 446 43
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 18 16
1 8359777 BAHRAWANI VSA 1 1 03-04-2026 09:15 AM
2 8359780 BATHAWAR VSA 1 1 03-04-2026 09:15 AM
3 8360751 Manihara VSA 4 4 03-04-2026 09:15 AM
4 8361044 Naraina GP ION EXCHANGE 2 2 03-04-2026 09:15 AM
5 8361260 LATAON GP ION EXCHANGE 2 2 03-04-2026 09:15 AM
6 8361925 BASILA VSA 1 1 03-04-2026 09:15 AM
7 8361928 SURAULI VSA 3 3 03-04-2026 09:15 AM
8 8361936 LAUNDA VSA 2 0 03-04-2026 09:15 AM
9 8361938 KUNDALIYA VSA 1 1 03-04-2026 09:15 AM
10 8361945 MANIYARPUR VSA 1 1 03-04-2026 09:15 AM
Department Contact Number
S.No. Name Designation Monile No.
1 Amit Rajput Executive Engineer 8630907738
2 Chandauli DM 9454417576
3 Sonu Kumar JE 8853206069
4 Rohit Patel JE 7786825002
5 Avadhesh Kumar JE 8115541880
6 Swatantra Yadav JE 7007219353
7 Saurabh Kumar Agrahari JE 9120899862
8 Ravi Kumar Sharma JE 7985953470
9 Rahul Yadav JE 9621749136
10 CHANDAULI EE E AND M 8808458967
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 18-Sep-2025 Progress review meeting with All contractor and Jal Nigam Staff.
2 25-Sep-2023 Progress review meeting with All contractor and Jal Nigam Staff