Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Gayatri Projects LTD 218 329 196 76
26
94
29
40
52
79
137
213
50
72
75
118
0 218 120
2 LC INFRA 365 723 308 166
19
123
85
164
70
161
210
408
42
77
190
362
0 346 200
3 Rithwik-Koya (JV) 213 467 79 41
24
14
14
44
25
69
174
354
7
15
169
343
2 212 50
4 UNIVERSAL MEP 74 121 94 76
14
4
20
38
26
45
28
39
21
30
19
24
0 68 35
5 LC Infra Project Limited 200 396 380 116
0
264
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 1070 2036 1057 475
83
499
148
286
173
354
549
1014
120
194
453
847
2 844 405


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 LC INFRA 6 0 0 0 0 4 7 0 0 0 0 0 0 0
2 UNIVERSAL MEP 2 0 0 1 0 0 3 2 0 0 1 0 0 3
Total 8 0 0 1 0 4 10 2 0 0 1 0 0 3
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 Gayatri Projects LTD 50 2 0 0 276
2 LC INFRA 134 5 0 0 516
3 Rithwik-Koya (JV) 51 3 0 0 331
4 UNIVERSAL MEP 20 5 0 0 102
Total 255 15 0 0 1225
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 872 853 97.82
2 Pump House 872 839 96.22
3 Chlorination system 320 295 92.19
4 OHT 844 825/405 97.75
5 Distribution (Line Laying in Km.) 8118 7171 88.33
6 Solar Plant 768 549 71.48
7 F.H.T.C. 432496 424418 98.13
9 ROAD DISMENTLING/RESTORATION(KM) 2369 2211 93.33
10 Villages where 100 % road restoration completed 1223 1226 100.00
11 Comissioning of Village 1640 794 48.41
12 Regular water supply 1640 794 48.41
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 Gayatri Projects LTD 218 75 57 29 29 28
2 LC INFRA 365 113 83 85 83 67
3 Rithwik-Koya (JV) 213 24 9 14 14 7
4 UNIVERSAL MEP 74 28 28 20 20 20
Total 870 240 177 148 146 122
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 UNIVERSAL MEP 55 55 0 47 47 0
2 LC INFRA 280 254 26 117 110 7
3 Rithwik-Koya (JV) 109 101 8 31 31 0
4 Gayatri Projects LTD 137 123 14 38 32 6
Total 581 533 48 233 220 13
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 16 12
1 8358978 Tilatari GP Water Supply Scheme Gayatri Projects LTD 2 2 03-04-2026 09:16 AM
2 8359006 Jungle Thakurahi GP water supply scheme Gayatri Projects LTD 1 1 03-04-2026 09:16 AM
3 8359346 Gauri Buzurg G.P. water Supply Scheme Gayatri Projects LTD 2 2 03-04-2026 09:16 AM
4 8359370 Turak Patti G.P. water Supply Scheme Gayatri Projects LTD 2 2 03-04-2026 09:13 AM
5 8359696 Sikarhata GP Water Supply Scheme LC INFRA 3 0 03-04-2026 09:15 AM
6 8359707 Nenua GP Water Supply Scheme LC INFRA 1 0 03-04-2026 09:04 AM
7 8359816 Anand Nagar G.P. water Supply Scheme Gayatri Projects LTD 1 1 03-04-2026 09:16 AM
8 8359819 Gopalpur G.P. water Supply Scheme Gayatri Projects LTD 1 1 03-04-2026 09:16 AM
9 8359883 Barnai G.P. water Supply Scheme Gayatri Projects LTD 1 1 03-04-2026 09:16 AM
10 8359897 Balpur Shrinagar G.P. water Supply Scheme Gayatri Projects LTD 2 2 03-04-2026 09:15 AM
Department Contact Number
S.No. Name Designation Monile No.
1 Akhil Anand Executive Engineer 9453590179
2 Deoria DM 9454417543
3 Chandra Mohan Singh JE 9140034052
4 Shri Pawan Chaturvedi JE 9889485613
5 SHRI ABHISHEK TRIPATHI JE 8931922906
6 Mohd Aftab JE 9627871723
7 Pradeep Kumar JE 9532501056
8 SHRI SURYANARAYAN JE 8953836091
9 NARENDRA YADAV JE 9616334551
10 INDRAJEET YADAV JE 8052431446
11 EE EE E AND M 9473941984
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 07-Apr-2023 DWSM Meeting
2 22-Mar-2023 DWSM Meeting
3 14-Mar-2023 DWSM Meeting
4 28-Feb-2023 DWSM Meeting