Jal Jeevan Mission - Hathras

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 BGCCPL-Ramky (JV) 252 496 142 43
38
61
8
21
40
78
204
397
58
75
170
316
6 255 91
2 ION EXCHANGE 28 104 33 1
1
31
0
0
0
0
28
104
3
6
26
79
0 81 19
3 Pravin Electrical PVT 39 46 13 0
0
13
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 319 646 188 44
39
105
8
21
40
78
232
501
61
81
196
395
6 336 110


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
No RWS disruption found
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 BGCCPL-Ramky (JV) 14 0 0 0 261
2 ION EXCHANGE 3 0 0 0 84
Total 17 0 0 0 345
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 460 442 96.09
2 Pump House 460 422 91.74
3 Chlorination system 392 188 47.96
4 OHT 336 326/110 97.02
5 Distribution (Line Laying in Km.) 3489 3304 94.70
6 Solar Plant 154 124 80.52
7 F.H.T.C. 203986 198373 97.25
9 ROAD DISMENTLING/RESTORATION(KM) 1058 1005 94.99
10 Villages where 100 % road restoration completed 345 345 100.00
11 Comissioning of Village 600 179 29.83
12 Regular water supply 600 177 29.50
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 BGCCPL-Ramky (JV) 252 19 11 8 8 5
2 ION EXCHANGE 28 9 1 0
Total 280 28 12 8 8 5
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 BGCCPL-Ramky (JV) 334 246 88 17 15 2
2 ION EXCHANGE 141 92 49 0
Total 475 338 137 17 15 2
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 28 18
1 20064926 BHAKARI NAGLA BHOJ WSS BGCCPL-Ramky (JV) 5 4 03-04-2026 09:15 AM
2 20064934 KAPURA WSS BGCCPL-Ramky (JV) 1 1 03-04-2026 09:15 AM
3 Off 20020164 MAI WSS ION EXCHANGE 6 4 03-04-2026 07:44 AM
4 Off 20065020 BILKHAURA KALAN WSS BGCCPL-Ramky (JV) 2 1 03-04-2026 04:42 AM
5 Off 20065422 SAHPAU DEHAT WSS BGCCPL-Ramky (JV) 2 0 03-04-2026 09:15 AM
6 Off 20067228 DARIYAPUR WSS BGCCPL-Ramky (JV) 2 1 03-04-2026 02:13 AM
7 Off 20067406 DHATURA KHURD WSS BGCCPL-Ramky (JV) 4 2 03-04-2026 09:15 AM
8 Off 20068368 BARAMAI WSS BGCCPL-Ramky (JV) 3 2 03-04-2026 07:54 AM
9 Off 20070393 UGHAI WSS BGCCPL-Ramky (JV) 1 1 03-04-2026 08:45 AM
10 Off 20087483 SALEHPUR CHANDWARA WATER SUPPLY SCHEME BGCCPL-Ramky (JV) 2 2 03-04-2026 03:54 AM
Department Contact Number
S.No. Name Designation Monile No.
1 MOHIT KUMAR Executive Engineer 9473942536
2 Hathras DM 9454417515
3 Test JE 7905939308
4 Kuldeep JE 8006835358
5 SANDESH KUMAR JE 8077270757
6 GAURAV SHARMA JE 8287412909
7 Rajesh Kumar JE 9756782374
8 HATHRAS EE E AND M
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 28-Apr-2023 Reagarding JJM Phase-2&3 progress review
2 01-Mar-2023 Regarding DPR approval for SLSSC
3 06-Feb-2023 Regarding DPR approval for SLSSC
4 13-Jan-2023 Regarding DPR approval for SLSSC
5 22-Dec-2022 Regarding DPR approval for SLSSC
6 14-Nov-2022 Regarding DPR approval for SLSSC
7 30-Sep-2022 Regarding DPR approval for SLSSC
8 20-Aug-2022 Regarding DPR approval for SLSSC
9 20-Dec-2021 Reagarding JJM Phase-2 progress review