Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

Jal Jeevan Mission - Lucknow

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 NCC Ltd. 376 663 609 491
96
22
134
223
65
111
177
337
140
262
36
51
0 381 219
2 Vindhya Telelinks Limited 23 33 30 3
0
27
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 399 696 639 494
96
49
134
223
65
111
177
337
140
262
36
51
0 381 219


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 NCC Ltd. 5 0 0 1 1 0 7 1 0 0 1 1 0 3
Total 5 0 0 1 1 0 7 1 0 0 1 1 0 3
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 NCC Ltd. 222 3 0 0 580
Total 222 3 0 0 580
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 442 439 99.32
2 Pump House 442 437 98.87
3 Chlorination system 424 414 97.64
4 OHT 381 379/219 99.48
5 Distribution (Line Laying in Km.) 4940 4842 98.02
6 Solar Plant 374 363 97.06
7 F.H.T.C. 250572 246211 98.26
9 ROAD DISMENTLING/RESTORATION(KM) 2318 2302 99.31
10 Villages where 100 % road restoration completed 580 580 100.00
11 Comissioning of Village 663 646 97.44
12 Regular water supply 663 633 95.48
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 NCC Ltd. 376 128 77 134 100 63
Total 376 128 77 134 100 63
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 NCC Ltd. 1402 1341 61 531 515 16
Total 1402 1341 61 531 515 16
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 11 11
1 8359765 Khujauli NCC Ltd. 1 1 03-04-2026 08:58 AM
2 8359766 Parvar Pashchim NCC Ltd. 1 1 03-04-2026 09:08 AM
3 8360575 Puraheya NCC Ltd. 1 1 03-04-2026 09:08 AM
4 8360581 UDAY PUR NCC Ltd. 1 1 03-04-2026 09:08 AM
5 8360590 Terwa NCC Ltd. 1 1 03-04-2026 08:58 AM
6 8360591 DADOOPUR NCC Ltd. 1 1 03-04-2026 08:18 AM
7 8360593 Chandraval NCC Ltd. 1 1 03-04-2026 08:58 AM
8 8360594 Thavar NCC Ltd. 1 1 03-04-2026 08:18 AM
9 8360601 Meerakh Nagar NCC Ltd. 1 1 03-04-2026 09:08 AM
10 8360835 Ratana Pur NCC Ltd. 2 2 03-04-2026 08:18 AM
Department Contact Number
S.No. Name Designation Monile No.
1 ARVIND KUAMR TRIPATHI Executive Engineer 9532501599
2 Lucknow DM 9415005000
3 MRIDULA YADAV JE 7985118171
4 KASHISH YADAV JE 8429571512
5 AMITA SEN JE 7007641190
6 MOHD TABISH JE 9532430849
7 SHIV SHANKAR KANNAUJIA JE 9454698552
8 Lucknow EE E AND M 8081255045
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 15-Jul-2025 MOM DWSM
2 21-Apr-2025 MOM DWSM
3 31-Jan-2025 MOM DWSM
4 02-Dec-2024 MOM DWSM
5 11-Nov-2024 MOM DWSM
6 13-Oct-2024 MOM DWSM
7 13-Oct-2024 MOM DWSM
8 27-Sep-2024 MOM DWSM
9 31-Jul-2024 MOM DWSM
10 29-Jul-2024 MOM DWSM
11 23-Mar-2023 MOM DWSM
12 16-Dec-2022 MOM DWSM
13 09-Nov-2022 MOM DWSM
14 19-Oct-2022 MOM DWSM
15 28-Sep-2022 MOM DWSM
16 07-Jun-2022 MOM DWSM
17 16-Oct-2021 MOM DWSM
18 21-Sep-2021 MOM DWSM
19 12-Aug-2021 MOM DWSM
20 02-Jul-2021 MOM DWSM