Jal Jeevan Mission - Raebareli

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 NCC Ltd. 434 681 506 272
113
121
90
139
158
253
186
312
71
104
111
179
12 438 291
2 Vindhya-GAJA (JV) 211 360 232 148
22
62
31
50
38
61
142
249
43
70
71
113
3 214 129
3 Om Infra Limited 45 100 61 1
0
60
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 690 1141 799 421
135
243
121
189
196
314
328
561
114
174
182
292
15 652 420


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 NCC Ltd. 8 0 0 0 9 0 17 3 0 0 0 2 0 5
Total 8 0 0 0 9 0 17 3 0 0 0 2 0 5
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 NCC Ltd. 263 1 0 0 600
2 Vindhya-GAJA (JV) 115 0 0 0 332
Total 378 1 0 0 932
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 680 671 98.68
2 Pump House 680 640 94.12
3 Chlorination system 540 486 90.00
4 OHT 652 644/420 98.77
5 Distribution (Line Laying in Km.) 9607 9126 94.99
6 Solar Plant 642 593 92.37
7 F.H.T.C. 503473 470568 93.46
9 ROAD DISMENTLING/RESTORATION(KM) 2486 2443 98.27
10 Villages where 100 % road restoration completed 932 932 100.00
11 Comissioning of Village 1041 797 76.56
12 Regular water supply 1041 791 75.98
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 NCC Ltd. 434 125 79 90 65 41
2 Vindhya-GAJA (JV) 211 83 50 31 21 16
Total 645 208 129 121 86 57
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 Vindhya-GAJA (JV) 291 116 175 63 26 37
2 NCC Ltd. 692 575 117 221 209 12
Total 983 691 292 284 235 49
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 21 20
1 8360619 Para Kalan NCC Ltd. 1 1 03-04-2026 09:06 AM
2 8360627 khajuri NCC Ltd. 1 1 03-04-2026 08:19 AM
3 8360629 Pilkha NCC Ltd. 1 1 03-04-2026 09:06 AM
4 8360797 Salempur Siki NCC Ltd. 4 4 03-04-2026 08:18 AM
5 8360821 Chak Rar NCC Ltd. 2 2 03-04-2026 08:58 AM
6 8361867 RAIN NCC Ltd. 2 2 03-04-2026 08:46 AM
7 8361872 SARAI MUBARAK NCC Ltd. 3 3 03-04-2026 09:06 AM
8 8361878 AGHAURA NCC Ltd. 1 1 03-04-2026 09:06 AM
9 8361879 HATHKUI NCC Ltd. 2 1 03-04-2026 08:38 AM
10 8362064 OTHI NCC Ltd. 4 4 03-04-2026 09:06 AM
Department Contact Number
S.No. Name Designation Monile No.
1 S RAHMAN Executive Engineer 7007697119
2 Rae Bareli DM 9454417559
3 Sachin Kumar Prajapati JE 9559094217
4 Aqib Ansari JE 9532760814
5 Dheeraj Kumar JE 7007697119
6 Danish JE 7007011681
7 Sanchit Prakash Dwivedi JE 7011719162
8 Rae Bareli EE E AND M 8081255045
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 12-Oct-2022 DWSM MOM 12.10.2022
2 29-Sep-2022 DWSM MOM 29.09.2022
3 24-Sep-2022 DWSM MOM 24.09.2022
4 18-Jul-2022 DWSM MOM 18.7.2022
5 25-May-2022 DWSM MEETING MOM 25.05.2022
6 25-May-2022 DWSM MOM 25.5.2022
7 01-Dec-2021 DWSM MEETING 01.12.2021
8 12-Nov-2021 DWSM MEETING 12.11.2021