Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

Jal Jeevan Mission - Sambhal

Table 1 Physical Progress Phase wise
Sno Agency Name Total
Schemes
Total
Villages
RWS Villages Work Completed Work In Progress Villages
in O&M
but not RWS
OHT
Total
RWS
Villages
100%
90% to 99%
< 90%
O&M
Schemes
Villages
Trial Run
Schemes
Villages
Schemes
Villages
Direct Pumping
Schemes
Villages
No RWS
Schemes
Villages
Required OHT Completed OHT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 LC INFRA 10 15 6 1
2
3
1
2
4
6
5
7
2
2
4
6
1 10 4
2 NKG-PRIMUS (JV) 360 565 44 7
2
35
3
8
10
14
347
543
20
19
324
508
0 363 104
3 SPML Infra 186 280 147 66
50
31
24
38
32
49
130
199
26
41
89
127
2 186 92
4 Om Infra Limited 26 29 19 2
3
14
0
0
0
0
0
0
0
0
0
0
0 0 0
Total 582 889 216 76
57
83
28
48
46
69
482
749
48
62
417
641
3 559 200


Table 2 RWS disruption(Village)
SNo. Agency Name Total RWS disruption(Village) O&M RWS disruption(Village)
Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total Theft Power
Electrical
Issue
Tullu
Pump
Road
Widening
Damage
Village
Internal
Works
Local
Repairing
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 SPML Infra 6 0 0 8 0 0 14 1 0 0 1 0 0 2
Total 6 0 0 8 0 0 14 1 0 0 1 0 0 2
Table 3 Certification/Jal Arpan/Jal Aklan/RPWSS/Road Restoration
SNo. Agency Name Certification Jal Arpan Jal Aklan RPWSS 100% Road Restoration Villages
1 2 3 4 5 6 7
1 LC INFRA 3 0 0 0 11
2 NKG-PRIMUS (JV) 34 0 0 0 312
3 SPML Infra 56 2 0 0 227
Total 93 2 0 0 550
Table 4 Components Wise Physical Progress
Sr.No. Components Physical Progress
Target Achivement %
1 2 3 4 5
1 Tubewell 565 562 99.47
2 Pump House 565 557 98.58
3 Chlorination system 253 209 82.61
4 OHT 559 555/200 99.28
5 Distribution (Line Laying in Km.) 5080 4942 97.28
6 Solar Plant 493 455 92.29
7 F.H.T.C. 327274 303943 92.87
9 ROAD DISMENTLING/RESTORATION(KM) 1924 1856 96.47
10 Villages where 100 % road restoration completed 550 550 100.00
11 Comissioning of Village 860 587 68.26
12 Regular water supply 860 571 66.40
Table 5 Unified Command and Control System (UCCS)-Automation
SNo. Agency Name Total O&M
Scheme Integrated Live Scheme Integrated Live
1 2 3 4 5 6 7 8
1 LC INFRA 10 1 0 1 1 0
2 NKG-PRIMUS (JV) 360 3
3 SPML Infra 186 26 10 24 17 7
Total 556 27 10 28 18 7
Table 6 Grievance Redressal System
SNo. Agency Name Total Complaint O&M Complaint
Total Close Pending Total Close Pending
1 2 3 4 5 6 7 8
1 NKG-PRIMUS (JV) 436 221 215 14 10 4
2 LC INFRA 30 19 11 12 12 0
3 SPML Infra 225 189 36 54 51 3
Total 691 429 262 80 73 7
Table 7 Water Quality [Comming Soon]
Table 8 Automation Integrated SchemesReference
Sno. Scheme Status Pump Status Scheme Id Scheme Name Agency Name Covered Village Regular Water Supply Last Data Receive Date
Total 14 13
1 8389793 Encholi GP W/S Scheme SPML Infra 1 1 03-04-2026 09:21 AM
2 20018920 HINDOLI WATER SUPPLY SCHEME SPML Infra 1 1 03-04-2026 09:21 AM
3 20018922 KAILI WATER SUPPLY SCHEME SPML Infra 1 1 03-04-2026 09:21 AM
4 Off 20016561 IKONA WATER SUPPLY SCHEME SPML Infra 1 1 03-04-2026 09:17 AM
5 Off 20016643 MADAWALI RASOOLPUR WATER SUPPLY SCHEME SPML Infra 2 1 03-04-2026 09:22 AM
6 Off 20022979 PURA WATER SUPPLY SCHEME SPML Infra 1 1 03-04-2026 09:14 AM
7 Off 20050571 SALAKHANA WSS SPML Infra 2 2 03-04-2026 09:14 AM
8 Off 20050609 GUNNAUR DAULAT KHAN WSS SPML Infra 3 3 03-04-2026 09:17 AM
9 Off 20070404 Rampur Urf Yarpur W/S Scheme SPML Infra 1 1 03-04-2026 09:14 AM
10 Off 20070405 Rasoolpur Sarai W/S Scheme SPML Infra 1 1 03-04-2026 09:17 AM
Department Contact Number
S.No. Name Designation Monile No.
1 Chandrahas Executive Engineer 7500821006
2 Sambhal DM 9454416890
3 Mohd Anas JE 9837383771
4 Preeti Gautam JE 7830530189
5 Sambhal EE E AND M 9897236551
DWSM Minutes of Meeting
S.No. DWSM MOM Date Subject Attachment
1 26-Jun-2025 DWSM Meeting
2 26-May-2025 DWSM Meeting
3 22-Apr-2025 DWSM Meeting