Phase 1

Physical Progress All Scheme

Total Scheme : 63 O&M Scheme : 43 Under Trial Run Scheme : 6 In-Progress Scheme : 14
S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trial Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Commissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismantle(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
CWR Images Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Commissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 36 OHT
  • 2 CWR
  • 230.46 D.System
  • 81 Comissioning
  • 2 Electricity
  • 12499 FHTC
  • 730 HGJ
  • 1834 HGJ CERT
  • 6157 HOV
  • Scheme Wise Category A
  • 806 No. of Schemes
  • 1425 No. of Villages
  • Scheme Wise Category B
  • 3840 No. of Schemes
  • 7067 No. of Villages
  • Scheme Wise Category C
  • 1088 No. of Schemes
  • 1604 No. of Villages
  • Scheme Wise Total
  • 5734 Total No. of Schemes
  • 10096 Total No. of Villages
  • Village Wise Category A
  • 1156 No. of Villages
  • Village Wise Category B
  • 5691 No. of Villages
  • Village Wise Category C
  • 3045 No. of Villages
  • Village Wise Total
  • 9892 Total No. of Villages
  • 4675 Agreement Done Scheme
  • 8360 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6547 49 53 45 45 45 4095 3898 6190013 74280156 10668 10291 96%
+22
5799
89 98.99 61 166 / 16 100.00 62 359 / 17
+0
557 / 557
213 / 83 1699
+0
1689
842 5 0 3 18
  +1
1643 | 1663
1578 0 / 0 1307 / 104 1136 -- -- -- 49 48 236 916 44 44 226 835 -- 6847 1991 1699 512 301 835 886 170 247 -- -- 1 + 4 + 1 + 57 + 4 = 67 1 + 7 + 1 + 91 + 4 = 104 255 114 319304 2235128 9579120 346047 108.38% 2293529 8961751 5908 493 193 261 715 4246 455
+0
453
+0
453
453 0 58117.33
+17.14
57886.87
6547 1685084 5816
+ 13
4712
1672589 0 0 99.26
+0
900 / 898
+1
6389 / 5256
1624724.00
+0.00 / +0.00
1448305.80
89.14% 8 8 5 22814 22491 323 1902 1010 892
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 1 1 1 342 342 0 0 691 688 100%
+1
337
99 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 22 114 Verified Verified 18 93 Verification Remarks Minutes of Meeting 785 785 116 0 8 93 108 9 1 26 9 0 + 1 + 0 + 0 + 0 = 1 0 + 4 + 0 + 0 + 0 = 4 34 26 39945 279615 1198350 34414 86.15% 222301 694464 342 0 0 13 59 270 39
+0
39
+0
39
39 0 4215.00
+0.00
4215.00
342 127889 342
+ 0
324
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
142656.23
91.26% 1665 1627 38 112 91 21
  • 18 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 31207.66 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 580 100%
+0
202
100 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 64 Verification Remarks Minutes of Meeting 175 150 80 0 1 64 79 13 19 30 14 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 6 0 27609 193263 828270 33292 120.58% 229659 913123 202 0 0 0 28 174 13
+0
13
+0
13
13 0 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
88170.52
94.58% 2544 2533 11 85 72 13
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 2 2 544 544 0 0 1271 1268 100%
+1
539
99.08 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 34 184 2 2 30 184 -- 960 935 196 0 9 157 187 22 20 -- -- 0 + 1 + 0 + 2 + 0 = 3 0 + 4 + 0 + 2 + 0 = 6 40 26 67554 472878 2026620 67706 100.23% 451960 1607587 544 0 0 13 87 444 52
+0
52
+0
52
52 0 6796.60
+0.00
6796.60
544 210155 544
+ 0
525
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
230826.75
92.50% 0 0 0 4209 4160 49 197 163 34
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 92 81 88%
+0
62
90 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 0 0 1
  +0
27 | 27
25 0 / 0 4 / 0 3 Integrated Off Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 291 0 28 5 7 25 16 2 4 7 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 2 3979 27853 119370 4255 106.94% 21958 55734 65 5 2 5 13 40 11
+0
11
+0
11
11 0 882.90
+0.00
877.85
69 19570 69
+ 0
53
19570 0 0 100.00
+0
13 / 13
+0
65 / 65
30332.00
+0.00 / +0.00
23608.05
77.83% 204 201 3 31 2 29
  • 1 OHT
  • 5 D.System
  • 4 COV
  • 16 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 43 No. of Schemes
  • 102 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 47 No. of Villages
  • Village Wise Category B
  • 0 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 47 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 81 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 0 Agreement Done Scheme
  • 0 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 59 58 98%
+0
58
98 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 154 0 17 3 13 17 1 0 0 11 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 434 3038 13020 310 71.43% 2172 15527 59 0 0 1 12 46 6
+0
6
+0
6
6 0 576.00
+0.00
567.05
59 11925 59
+ 0
59
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20939.14
98.03% 165 164 1 22 1 21
  • 8 D.System
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 304 274 90%
+9
233
81 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
86 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 28 Verified Not Verified 5 23 Verification Remarks Minutes of Meeting 480 0 91 7 84 23 0 0 0 2 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 27 23 0 0 0 0 0% 0 0 215 65 5 0 72 73 20
+0
20
+0
20
20 0 3052.00
+0.00
2846.86
286 86157 284
+ 0
131
86114 0 0 99.95
+0
21 / 21
+0
250 / 180
95975.00
+0.00 / +0.00
77188.06
80.43% 785 757 28 118 2 116
  • 205 D.System
  • 34 COV
  • 43 FHTC
  • 2 HGJ
  • 155 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 363 332 91% 291 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
103 0 / 0 51 / 0 15 -- -- -- 2 1 10 45 2 1 8 40 -- 634 0 108 10 97 40 1 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 28 24 434 3038 13020 310 71.43% 2172 15527 274 65 5 1 84 119 26
+0
26
+0
26
26 0 3628.00
+0.00
3413.91
345 98082 343
+ 0
190
98039 0 0 100
+0
28 / 28
+0
309 / 239
117334.00
+0.00
98127.20
84% 950 921 29 140 3 137
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 455 412 91%
+9
353
85.27 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 0 0 1
  +0
135 | 135
128 0 / 0 55 / 0 18 -- -- -- 3 2 10 71 3 2 8 71 -- 925 0 136 15 104 65 17 2 4 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 31 26 4413 30891 132390 4565 103.44% 24130 71261 339 70 7 6 97 159 37
+0
37
+0
37
37 0 4510.90
+0.00
4291.76
414 117652 412
+ 0
243
117609 0 0 99.96
+0
41 / 41
+0
374 / 304
147666.00
+0.00 / +0.00
121735.25
82.44% 0 0 0 1154 1122 32 171 5 166
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 3092513 37110156 793 793 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
130 / 130
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 3 Verified Verified 0 3 Verification Remarks Minutes of Meeting 86 51 130 122 0 3 8 7 1 29 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 3 1335 9345 40050 1358 101.72% 6280 36034 193 0 0 0 13 180 6
+0
6
+0
6
6 0 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes Yes 1368 1355 13 88 83 5
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 23842.29 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 129 20-Mar-2024 1 1 1 1 129 128 3097500 37170000 412 411 100%
+0
129
100 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 6 43 Verified Verified 6 32 Verification Remarks Minutes of Meeting 364 0 46 0 46 32 0 0 0 21 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 0 0 0 0 0% 1661 133730 129 0 0 2 19 108 10
+0
10
+0
10
10 0 1214.00
+0.00
1213.70
129 45475 129
+ 0
128
45475 0 0 100.00
+0
10 / 10
+0
129 / 129
39878.00
+0.00 / +0.00
37750.20
94.66% Yes Yes 1147 1143 4 58 52 6
  • 1 HGJ CERT
  • 127 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 6190013 74280156 1204 1203 100%
+0
320
99.38 100.00 2 11 / 0 100.00 2 5 / 0
+0
130 / 130
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 6 46 2 2 6 46 -- 450 51 176 122 46 35 8 7 1 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 3 1335 9345 40050 1358 101.72% 7941 169764 322 0 0 2 32 288 16
+0
16
+0
16
16 0 2541.83
+0.00
2541.53
322 105150 322
+ 0
319
105150 0 0 100
+0
83 / 83
+0
322 / 322
66979.00
+0.00 / +0.00
63469.72
94.76% 2 2 0 2515 2498 17 146 135 11
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 1123 963 86%
+0
229
45 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
272 0 0 3 16
  +1
234 | 253
189 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 24 18 0 0 0 0 0% 0 0 278 145 60 24 23 26 5
+0
5
+0
5
5 0 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
51396.42
98.53% 840 790 50 103 59 44
  • 19 OHT
  • 3 D.System
  • 5 COV
  • 2 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 132 79%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 0 0 0 0 0% 0 0 38 28 3 0 7 0 7
+0
7
+0
7
7 0 495.00
+0.00
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 37
20745.00
+0.00 / +0.00
7276.12
35.07% 94 92 2 16 3 13
  • 3 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 162 131 81%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 2 + 2 = 4 0 + 0 + 0 + 2 + 2 = 4 7 4 0 0 0 0 0% 0 0 27 17 4 0 5 1 6
+0
6
+0
6
6 0 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
4250.57
32.31% 159 151 8 22 21 1
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1453 1226 84% 302 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
301 0 0 3 17
  +1
261 | 281
215 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 2 + 2 = 4 0 + 0 + 0 + 2 + 2 = 4 33 23 0 0 0 0 0% 0 0 343 190 67 24 35 27 18
+0
18
+0
18
18 0 3431.00
+0.00
3426.54
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 171
86063.00
+0.00
62923.11
73% 1093 1033 60 141 83 58
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 495 100%
+5
185
94 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 10 56 Verified Verified 10 56 Verification Remarks Minutes of Meeting 213 0 56 0 18 56 38 22 13 18 10 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 4 1 10334 72338 310020 10795 104.46% 77402 318376 197 0 0 20 55 122 11
+0
11
+0
11
11 0 1715.00
+0.00
1715.00
197 43098 197
+ 0
181
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
44913.13
88.76% 478 472 6 42 42 0
  • 16 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1720 88%
+5
487
56.83 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
357 0 0 3 17
  +1
317 | 337
271 0 / 0 169 / 0 24 -- -- -- 1 1 10 56 1 1 10 56 -- 213 0 357 301 18 56 38 22 13 -- -- 0 + 0 + 0 + 4 + 2 = 6 0 + 0 + 0 + 4 + 2 = 6 37 24 10334 72338 310020 10795 104.46% 77402 318376 539 189 67 44 90 149 29
+0
29
+0
29
29 0 5146.00
+0.00
5141.54
857 184499 413
+ 0
275
180667 0 0 97.92
+0
156 / 154
+0
842 / 368
136662.00
+0.00 / +0.00
107836.24
78.91% 0 0 0 1560 1494 66 181 123 58
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 242 215 89%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 45 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 7 0 0 0 0 0% 0 0 78 21 0 0 6 51 8
+0
8
+0
8
8 0 899.95
+0.00
899.00
87 32259 82
+ 0
29
32223 0 0 99.89
+0
9 / 9
+0
87 / 66
29730.00
+0.00 / +0.00
26146.92
87.95% 363 351 12 33 24 9
  • 36 FHTC
  • 5 HGJ
  • 58 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 135 83%
+0
28
30 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 7 3 0 0 0 0 0% 0 0 80 19 4 13 15 29 9
+0
9
+0
9
9 0 786.55
+0.00
786.00
93 27437 33
+ 0
8
27285 0 0 99.45
+0
10 / 10
+0
89 / 59
29676.00
+0.00 / +0.00
18958.13
63.88% 278 270 8 34 16 18
  • 4 COV
  • 152 FHTC
  • 60 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 179 160 89%
+7
42
40 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 7 0 0 0 0 0% 0 0 74 24 11 7 4 28 11
+0
11
+0
11
11 0 868.26
+0.00
863.85
106 27423 39
+ 0
1
27209 0 0 99.22
+0
12 / 12
+0
96 / 45
29490.00
+0.00 / +0.00
25567.66
86.70% 145 133 12 41 26 15
  • 4 D.System
  • 10 COV
  • 214 FHTC
  • 67 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 583 510 87% 83 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 45 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 26 17 0 0 0 0 0% 0 0 232 64 15 20 25 108 28
+0
28
+0
28
28 0 2554.76
+0.00
2548.85
286 87119 154
+ 0
38
86717 0 0 100
+0
31 / 31
+0
272 / 170
88896.00
+0.00
70672.71
80% 786 754 32 108 66 42
Indian Hume Pipe


8010037 Kuraicha GOV 74 05-Feb-2024 1 1 1 1 74 72 0 0 294 291 99%
+0
69
93 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 119 0 14 0 0 14 14 0 4 30 15 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 4 1 8491 59437 254730 11964 140.90% 93932 329352 71 0 0 0 1 70 11
+0
11
+0
11
11 0 859.73
+0.00
859.37
74 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 385 380 5 25 23 2
  • 9 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 74 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 68 68 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 30 0 5 0 0 5 5 1 2 25 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1930 13510 57900 2961 153.42% 18485 80096 25 0 0 1 8 16 4
+0
4
+0
4
4 0 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6711.81
89.29% Yes 126 125 1 5 5 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 85 85 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 30 0 7 0 1 7 6 1 3 24 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 2972 20804 89160 4831 162.55% 27121 121361 37 1 0 1 11 24 4
+0
4
+0
4
4 0 297.97
+0.00
297.97
37 11549 37
+ 0
37
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11923.47
94.31% Yes 158 157 1 6 5 1
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 100 100 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 19 0 7 0 0 7 7 0 2 24 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3346 23422 100380 4485 134.04% 26595 112508 42 0 0 2 6 34 4
+0
4
+0
4
4 0 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 73 73 0 19 18 1
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 189 100%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 72 0 14 0 0 14 14 4 3 26 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 8009 56063 240270 9540 119.12% 55988 239882 59 2 1 9 22 25 8
+0
8
+0
8
8 0 869.06
+0.00
869.06
59 26650 59
+ 0
55
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26962.89
96.32% Yes 322 320 2 16 15 1
  • 4 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 442 442 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 151 0 33 0 1 33 32 6 10 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 16257 113799 487710 21817 134.20% 128189 553847 163 3 1 13 47 99 20
+0
20
+0
20
20 0 1724.58
+0.00
1724.58
163 56361 163
+ 0
158
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56463.15
95% 679 675 4 46 43 3
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 76 76 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 28 28 6 0 0 6 6 0 4 30 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4025 28175 120750 6325 157.14% 37282 166039 32 0 0 0 0 32 3
+0
3
+0
3
3 0 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
9021.80
92.97% Yes 246 245 1 5 5 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 263 263 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Off Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 90 90 9 0 1 9 8 1 6 28 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3916 27412 117480 7289 186.13% 47911 196199 57 0 0 0 0 57 5
+0
5
+0
5
5 0 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
13881.43
94.79% Yes 199 199 0 14 12 2
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1656 1579 95%
+7
401
65.52 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 433 118 102 39 3 62 60 7 24 -- -- 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 35 18 32690 228830 980700 47395 144.98% 307314 1245437 555 67 16 33 73 366 67
+0
67
+0
67
67 0 5890.10
+0.00
5883.83
612 201505 479
+ 0
355
201094 0 0 99.80
+0
117 / 117
+0
596 / 491
200615.00
+0.00 / +0.00
177993.17
88.72% 0 0 3 2295 2253 42 198 149 49
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 13 Verified Verified 7 12 Verification Remarks Minutes of Meeting 98 45 13 0 1 12 12 1 6 26 14 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 0 0 3955 27685 118650 6567 166.04% 36865 145498 50 0 0 0 3 47 9
+0
9
+0
9
9 0 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17578.70
99.83% Yes 142 142 0 25 25 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 15 No. of Schemes
  • 20 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 5 No. of Schemes
  • 5 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 14 Verification Remarks Minutes of Meeting 118 48 17 0 2 14 15 1 3 25 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 5631 39417 168930 5554 98.63% 43653 202180 60 0 0 2 6 52 8
+0
8
+0
8
8 0 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
23998.94
97.56% 374 374 0 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Verified Verified 2 13 Verified Verified 2 13 Verification Remarks Minutes of Meeting 78 29 15 0 0 13 15 1 8 28 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 5836 40852 175080 9985 171.09% 50792 254113 59 0 0 1 7 51 5
+0
5
+0
5
5 0 462.02
+0.00
520.82
60 17590 60
+ 0
54
17590 0 0 100.00
+0
6 / 6
+0
60 / 59
23368.00
+0.00 / +0.00
22206.49
95.03% 241 240 1 26 26 0
  • 6 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 54 98%
+0
57
98 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 87 36 11 0 1 9 10 1 4 26 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 2664 18648 79920 4607 172.94% 29347 113805 58 0 0 0 5 53 5
+0
5
+0
5
5 0 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 58
15059.00
+0.00 / +0.00
14955.24
99.31% 124 123 1 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 61 98%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 50 16 4 0 0 10 4 0 2 30 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1696 11872 50880 4913 289.68% 24424 104106 7 0 0 0 2 5 2
+0
2
+0
2
2 0 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5976.98
100.00% 78 78 0 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 2 30 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 15 0 0 0 1 14 3
+0
3
+0
3
3 0 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4881.97
81.42% 54 54 0 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 555 100% 249 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 63 5 5 21 58 -- 431 174 66 0 4 58 62 4 25 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 2 0 20705 144935 621150 31626 152.75% 185081 819702 249 0 0 3 24 222 32
+0
32
+0
32
32 0 2005.26
+0.00
2219.47
251 73409 251
+ 0
238
73409 0 0 100
+0
37 / 37
+0
251 / 249
92606.00
+0.00
89598.32
97% 1013 1011 2 96 96 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 15 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 1 1 Verified Verified 0 0 Verification Remarks Minutes of Meeting 58 24 6 0 2 0 4 4 0 4 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1114 7798 33420 342 30.70% 1845 7145 15 0 0 3 3 9 3
+0
3
+0
3
3 0 108.90
+0.00
108.90
15 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
15 / 15
4615.00
+0.00 / +0.00
3841.40
83.24% 59 59 0 5 4 1
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 24 24 4 0 0 4 4 0 4 30 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 2439 218.35% 13977 60439 16 0 0 0 0 16 3
+0
3
+0
3
3 0 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
4075.86
88.34% Yes 32 32 0 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 1 1 1 1 23 20 0 0 54 53 98%
+0
15
65 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 25 25 8 0 0 8 8 0 4 30 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 2 2551 17857 76530 3663 143.59% 23025 94626 23 0 1 0 2 20 4
+0
4
+0
4
4 0 148.83
+0.00
148.78
23 8735 23
+ 0
19
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
8027.09
91.28% 150 146 4 12 10 2
  • 4 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 35 35 8 0 0 8 8 0 4 25 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1989 13923 59670 2688 135.14% 17698 66138 31 0 0 0 3 28 4
+0
4
+0
4
4 0 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8610.34
97.45% Yes 49 49 0 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 22 22 12 0 0 12 12 0 11 30 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3126 21882 93780 6822 218.23% 35847 123110 32 0 0 0 6 26 3
+0
3
+0
3
3 0 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 32
9528.00
+0.00 / +0.00
9028.53
94.76% 190 190 0 18 16 2
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 18 18 4 0 0 4 4 0 2 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1875 13125 56250 4091 218.19% 21675 75226 17 0 0 0 0 17 2
+0
2
+0
2
2 0 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
5052.79
84.12% 75 74 1 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 5 5 5 5 119 113 0 0 215 214 100% 111 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 124 124 36 0 0 36 36 0 25 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 2 10658 74606 319740 19703 184.87% 112222 419539 119 0 1 0 11 107 16
+0
16
+0
16
16 0 682.92
+0.00
682.70
119 35931 119
+ 0
114
35931 0 0 100
+0
21 / 21
+0
119 / 119
37779.00
+0.00
34794.61
92% 496 491 5 52 48 4
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 38 0 7 0 1 7 6 0 4 25 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 3836 26852 115080 3725 97.11% 37241 141508 47 1 1 0 9 36 5
+0
5
+0
5
5 0 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 45
14171.00
+0.00 / +0.00
13523.42
95.43% 239 237 2 17 13 4
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 86 0 10 0 10 9 0 0 0 30 11 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 3 2 0 0 0 0 0% 13753 113533 54 3 3 0 16 32 6
+0
6
+0
6
6 0 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +0.00
11725.18
88.17% 334 330 4 23 11 12
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 55 0 15 0 0 15 15 4 4 26 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 4790 33530 143700 6029 125.87% 28439 84867 45 1 0 0 1 43 7
+0
7
+0
7
7 0 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15925.10
95.47% 204 203 1 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 15 31 3 3 14 31 -- 179 0 32 0 11 31 21 4 8 -- -- 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 6 3 8626 60382 258780 9754 113.08% 79433 339908 146 5 4 0 26 111 18
+0
18
+0
18
18 0 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 139
44151.00
+0.00
41173.70
93% 777 770 7 60 43 17
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 49 0 8 0 0 8 8 0 0 29 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1277 8939 38310 1326 103.84% 9272 36132 19 0 0 0 0 19 2
+0
2
+0
2
2 0 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 39 37 2 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 16 16 16 16 550 540 0 0 1143 1140 100%
+0
540
98.18 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 55 139 15 15 53 139 -- 841 322 148 0 17 133 131 12 58 -- -- 0 + 0 + 0 + 1 + 1 = 2 0 + 0 + 0 + 1 + 1 = 2 13 5 42384 296688 1271520 62749 148.05% 387852 1622426 547 5 4 6 64 468 71
+0
71
+0
71
71 0 4206.32
+0.00
4420.29
550 156973 549
+ 0
531
156973 0 0 100
+0
86 / 86
+0
549 / 541
183187.00
+0.00 / +0.00
172842.42
94.35% 0 2 0 2377 2361 16 214 192 22
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 60 01-Dec-2023 1 1 1 1 60 60 0 0 254 252 99%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 72 42 18 0 1 18 17 7 4 27 12 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 6 1 6407 44849 192210 5114 79.82% 47712 160924 59 0 1 0 10 48 6
+0
6
+0
6
6 0 672.57
+0.00
672.20
60 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
60 / 60
27118.00
+0.00 / +0.00
27118.00
100.00% Yes Yes Yes 487 481 6 11 3 8
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 74 Villages
  • 26604 Households
  • 0 Last Week FHTC Given
  • 26428 FHTC Given
  • 99 FHTC(%)
  • 176 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 85.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 66.22 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 35 Schemes Sent to O&M
  • 37 No. of OHT in O&M Schemes
  • 6579 Water Demand(M3)
  • 6838.87 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 75 15-Mar-2024 1 1 1 1 75 74 0 0 243 243 100%
+0
75
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 9 31 Verified Verified 9 30 Verification Remarks Minutes of Meeting 198 0 32 0 10 30 22 7 7 25 11 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 6 0 3791 26537 113730 4817 127.06% 33795 154676 74 0 1 2 5 66 10
+0
10
+0
10
10 0 601.08
+0.00
599.17
75 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
75 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 582 576 6 22 4 18
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 282 282 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 250 0 40 0 0 40 40 8 14 30 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 6961 48727 208830 7785 111.84% 50424 226056 77 1 0 6 11 59 22
+0
22
+0
22
22 0 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
26008.94
100.00% Yes Yes Yes 468 461 7 20 4 16
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 152 2 2 2 2 152 151 0 0 525 525 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 31 71 2 2 31 70 -- 448 0 72 0 10 70 62 15 21 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 10 0 10752 75264 322560 12602 117.21% 84219 380732 151 1 1 8 16 125 32
+0
32
+0
32
32 0 1386.08
+0.00
1383.42
152 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
152 / 150
49611.00
+0.00
48943.08
99% 1050 1037 13 42 8 34
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 36 01-Jul-2024 1 1 1 1 36 35 0 0 181 181 100%
+0
35
97 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 12 Verified Verified 0 2 Verification Remarks Minutes of Meeting 112 0 13 0 3 2 10 8 1 23 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 2760 19320 82800 615 22.28% 2679 20286 36 0 1 7 10 18 9
+0
9
+0
9
9 0 349.51
+0.00
349.35
36 11799 36
+ 0
35
11799 0 0 100.00
+0
9 / 9
+0
36 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes Yes Yes 201 195 6 0 0 0
  • 1 HGJ CERT
  • 36 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 418 402 96%
+0
94
99 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 1 24 Verified Verified 1 11 Verification Remarks Minutes of Meeting 131 0 29 0 2 11 27 2 1 5 12 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 4 + 0 = 4 17 5 8221 57547 246630 7756 94.34% 53250 135454 90 0 4 12 37 37 9
+0
9
+0
9
9 0 804.48
+0.00
801.00
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
28849.34
86.63% Yes 606 587 19 4 0 4
  • 3 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 343 5 5 4 4 4 248 246 0 0 1375 1357 99%
+0
341
99.42 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 38 125 5 5 38 125 -- 763 42 132 0 16 101 116 32 27 -- -- 0 + 0 + 0 + 5 + 0 = 5 0 + 0 + 0 + 6 + 0 = 6 38 7 28141 196987 844230 26088 92.70% 187860 697396 336 1 7 27 73 228 56
+0
56
+0
56
56 0 3212.64
+0.00
3205.97
343 112046 343
+ 0
328
112046 0 0 100
+0
59 / 59
+0
343 / 338
125817.00
+0.00 / +0.00
118457.11
94.15% 4 3 2 2344 2300 44 57 11 46
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 0 Verification Remarks Minutes of Meeting 120 0 12 0 6 0 6 2 2 16 7 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 1 0 3818 26726 114540 4173 109.30% 31460 121089 123 0 3 2 19 99 5
+0
5
+0
5
5 0 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25970.57
96.54% 231 230 1 17 1 16
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 58 No. of Schemes
  • 113 No. of Villages
  • Scheme Wise Category C
  • 13 No. of Schemes
  • 18 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 55 Schemes Sent to O&M
  • 57 No. of OHT in O&M Schemes
  • 11888 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 58 Agreement Done Scheme
  • 114 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 125 0 15 0 0 7 15 1 9 19 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 4720 33040 141600 7515 159.22% 55397 171142 86 0 1 6 5 74 6
+0
6
+0
6
6 0 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 233 231 2 20 8 12
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 141 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
100 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 53 0 12 0 0 9 12 2 0 28 15 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 1 0 9559 66913 286770 8904 93.15% 55897 235072 138 3 2 4 9 120 7
+0
7
+0
7
7 0 723.50
+0.00
723.50
141 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
141 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 339 338 1 38 1 37
  • 118 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 213 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 192 0 25 0 0 10 25 9 11 15 13 0 + 0 + 0 + 2 + 1 = 3 0 + 0 + 0 + 3 + 1 = 4 5 0 14505 101535 435150 12319 84.93% 74350 340148 207 1 3 2 2 199 11
+0
11
+0
11
11 0 1327.06
+0.00
1327.06
213 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
213 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 474 467 7 54 6 48
  • 2 FHTC
  • 1 HGJ
  • 6 HGJ CERT
  • 173 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 440 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 16 26 3 3 15 26 -- 370 0 52 0 0 26 52 12 20 -- -- 0 + 0 + 0 + 3 + 1 = 4 0 + 0 + 0 + 4 + 1 = 5 8 0 28784 201488 863520 28738 99.84% 185644 746362 431 4 6 12 16 393 24
+0
24
+0
24
24 0 3022.67
+0.00
3022.67
440 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
440 / 437
81119.00
+0.00
77310.33
95% 1046 1036 10 112 15 97
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+5
30
0 0 0 0 0
  +0
30 | 30
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 54 54 30 0 1 29 29 0 2 27 14 0 + 3 + 0 + 2 + 0 = 5 0 + 3 + 0 + 5 + 0 = 8 1 0 11180 78260 335400 12542 112.18% 81794 345979 159 0 0 4 20 135 9
+0
9
+0
9
9 0 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29948.30
91.23% Yes Yes 351 349 2 26 2 24
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 36 29 25 0 0 23 25 0 12 26 14 1 + 0 + 0 + 0 + 0 = 1 1 + 0 + 0 + 0 + 0 = 1 1 1 11579 81053 347370 15947 137.72% 101299 348074 254 0 0 3 24 227 7
+0
7
+0
7
7 0 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 254
33415.00
+0.00 / +0.00
31276.44
93.60% Yes Yes 436 435 1 43 5 38
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+5
55
0 0 0 0 0
  +0
55 | 55
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 90 83 55 0 1 52 54 0 14 -- -- 1 + 3 + 0 + 2 + 0 = 6 1 + 3 + 0 + 5 + 0 = 9 2 1 22759 159313 682770 28489 125.18% 183093 694053 413 0 0 7 44 362 16
+0
16
+0
16
16 0 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 413
66243.00
+0.00
61224.74
92% 787 784 3 69 7 62
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 76 Verified Verified 1 76 Verification Remarks Minutes of Meeting 436 307 102 0 9 76 93 17 29 28 11 0 + 0 + 1 + 19 + 0 = 20 0 + 0 + 1 + 30 + 0 = 31 11 1 22567 157969 677010 14977 66.37% 84878 433302 305 5 6 18 30 246 2
+0
2
+0
2
2 0 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1276 1260 16 107 42 65
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 1 3 Verified Not Verified 1 2 Verification Remarks Minutes of Meeting 35 0 5 0 0 2 5 3 2 24 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 2968 20776 89040 3334 112.33% 17867 81949 63 0 1 4 15 43 1
+0
1
+0
1
1 0 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
6413.97
98.71% 88 87 1 11 3 8
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 263 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Verified Verified 0 35 Verified Verified 0 34 Verification Remarks Minutes of Meeting 105 0 48 0 5 34 43 12 5 0 5 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 4 + 0 = 4 7 1 11983 83881 359490 10191 85.05% 58661 58669 262 1 1 0 34 226 2
+0
2
+0
2
2 0 1344.50
+0.00
1344.50
263 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12393.12
95.46% 617 607 10 61 49 12
  • 2 COV
  • 136 FHTC
  • 4 HGJ
  • 13 HGJ CERT
  • 242 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1069 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
274
0 0 0 0 0
  +0
274 | 274
269 0 / 0 291 / 99 296 -- -- -- 9 9 34 195 8 7 33 195 -- 1156 390 274 0 21 190 253 46 72 -- -- 1 + 3 + 1 + 30 + 1 = 36 1 + 3 + 1 + 46 + 1 = 52 30 3 92881 650167 2786430 89901 96.79% 561602 2135424 1597 10 17 43 158 1369 50
+0
50
+0
50
50 0 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1573
310295 0 0 99.76
+0
200 / 200
+0
1599 / 1568
200307.00
+0.00 / +0.00
189875.73
94.79% 2 0 0 4045 4004 41 375 117 258
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 1 1 1 1 179 97 0 0 20 20 100%
+0
170
95 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 210 0 27 3 14 22 10 3 0 18 6 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 20 + 0 = 20 3 0 8699 60893 260970 4919 56.55% 52083 180989 151 5 2 3 5 136 16
+0
16
+0
16
16 0 3904.00
+0.00
3904.00
179 66179 178
+ 0
133
66172 0 0 99.99
+0
14 / 14
+0
171 / 73
74794.00
+0.00 / +0.00
65085.22
87.02% 496 492 4 68 1 67
  • 7 FHTC
  • 1 HGJ
  • 46 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Jul-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17571 FHTC Given
  • 96 FHTC(%)
  • 598 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 153 121 15 0 0 0 15 3 3 31 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 6425 44975 192750 7346 114.33% 40374 179443 29 1 0 0 0 28 9
+0
9
+0
9
9 0 744.00
+0.00
744.00
29 19081 29
+ 0
25
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
13244.00
100.00% 110 110 0 11 3 8
  • 4 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 52 0 0 0 0 0 0 0 0 63 63 100%
+0
52
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 9
+0
7
2 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 9 9 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 8 0 1 4 0 3 3
+0
3
+0
3
3 0 616.21
+0.00
602.40
52 15616 21
+ 0
1
10981 0 0 70.32
+0
4 / 4
+0
16 / 7
23765.00
+0.00 / +0.00
15430.89
64.93% 43 41 2 22 0 22
  • 2 OHT
  • 13 D.System
  • 36 COV
  • 4635 FHTC
  • 31 HGJ
  • 51 HGJ CERT
  • 52 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
  • 16-Jun-2026 Comissioning
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 0 1 0 0 1 0 0 4
+0
3
+0
3
3 0 610.00
+0.00
610.00
8 8051 3
+ 0
0
7223 0 0 89.72
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9174.10
73.49% 23 23 0 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 828 FHTC
  • 5 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 15 12 11 8 0 3 1 0 0 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2710 18970 81300 2044 75.42% 12263 20438 2 0 1 1 0 0 3
+0
2
+0
2
2 0 306.24
+0.00
306.24
6 8465 1
+ 0
0
7538 0 0 89.05
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7419.11
62.50% 15 15 0 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 927 FHTC
  • 5 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 95 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 45
+3
35
5 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 0 0 0 0 -- 168 133 45 27 0 0 18 4 3 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 9135 63945 274050 9390 102.79% 52637 199881 40 1 2 6 0 31 19
+0
17
+0
17
17 0 2276.45
+0.00
2262.64
95 51213 54
+ 0
26
44823 0 0 88
+0
20 / 20
+0
49 / 39
61363.00
+0.00
45268.10
74% 191 189 2 35 4 31
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 191 98%
+0
597
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Off Verified Verified 1 5 Verified Verified 1 4 Verification Remarks Minutes of Meeting 279 0 55 0 38 4 17 1 14 9 4 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 5 + 0 = 5 9 0 4358 30506 130740 7913 181.57% 59872 264726 600 142 58 44 33 323 15
+0
15
+0
15
15 0 3885.16
+17.14
3622.65
650 101050 556
+ 13
112
100689 0 0 99.64
+0
16 / 16
+1
632 / 371
99181.00
+0.00 / +0.00
83938.49
84.63% 1000 991 9 181 95 86
  • 262 D.System
  • 18 COV
  • 361 FHTC
  • 94 HGJ
  • 538 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Sep-2026
Comissioning
30/09/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 150 0 12 0 0 0 12 7 1 31 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 7826 54782 234780 1956 24.99% 15841 88142 12 0 0 1 0 11 7
+0
7
+0
7
7 0 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10929.93
91.54% Yes 38 38 0 4 2 2
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
46
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 2 2 Not Verified Verified 1 2 Verification Remarks Minutes of Meeting 59 0 8 0 4 2 4 2 1 6 5 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 0 0 936 6552 28080 1337 142.84% 4885 10906 45 0 2 6 0 37 4
+0
4
+0
4
4 0 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
9191.10
97.03% 34 34 0 11 1 10
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 1 1 1 80 42 0 0 64 64 100%
+0
80
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Verified Verified 1 9 Not Verified Not Verified 1 8 Verification Remarks Minutes of Meeting 58 0 9 0 1 8 8 1 5 10 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3019 21133 90570 4955 164.13% 34506 87427 79 0 1 1 0 77 4
+0
4
+0
4
4 0 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 108 108 0 18 1 17
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 20-Mar-2026 1 0 0 0 0 0 0 0 33 33 100%
+0
186
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 67 0 9 2 0 0 7 2 4 23 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 5597 39179 167910 5021 89.71% 53519 193186 176 2 2 15 2 155 5
+0
5
+0
5
5 0 1421.64
+0.00
1418.76
186 19691 184
+ 0
137
19595 0 0 99.51
+0
6 / 6
+0
185 / 174
23145.00
+0.00 / +0.00
20488.45
88.52% 375 375 0 41 6 35
  • 2 D.System
  • 96 FHTC
  • 2 HGJ
  • 49 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 115 0 10 0 10 0 0 0 0 4 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 14125 68823 26 1 8 11 1 5 6
+0
6
+0
6
6 0 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
16072.90
88.16% 67 67 0 10 6 4
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 0 0
  +0
3 | 3
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 0 0 0 0 0% 0 0 0 0 0 0 0 0 1
+0
1
+0
1
1 0 102.16
+0.00
102.16
4 1168 1
+ 0
0
596 0 0 51.03
+0
2 / 2
+0
3 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 6 5 1 0 0 0
  • 1 COV
  • 572 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 361 5 1 1 1 80 42 0 0 169 169 100% 354 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 0 0
  +0
39 | 39
36 0 / 0 1 / 0 30 -- -- -- 3 2 3 11 0 1 2 10 -- 299 0 39 5 15 10 19 5 10 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 1 0 9552 66864 286560 11313 118.44% 107035 360342 326 3 13 33 3 274 20
+0
20
+0
20
20 0 4824.34
+0.00
4819.27
361 58561 354
+ 0
281
57871 0 0 99
+0
25 / 25
+0
356 / 289
66677.00
+0.00
60047.67
90% 590 589 1 80 14 66
Total Sonbhadra 1297 7 8 4 4 4 300 180 0 0 546 543 99%
+0
1228
94.68 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 178
+0
168
5 5 0 0 0
  +0
163 | 163
156 0 / 0 106 / 0 72 -- -- -- 5 5 16 38 1 3 15 38 -- 1106 133 178 35 67 36 76 20 28 -- -- 0 + 0 + 0 + 11 + 0 = 11 0 + 0 + 0 + 26 + 0 = 26 15 2 39572 277004 1187160 35490 89.68% 287468 1094080 1129 151 75 87 41 775 77
+0
75
+0
75
75 0 15534.95
+17.14
15253.56
1297 286048 1154
+ 13
563
278600 0 0 97.40
+0
83 / 83
+1
1220 / 784
313955.00
+0.00 / +0.00
265269.41
84.49% 0 1 0 2315 2299 16 363 115 248
Project Completion Plan

Minutes of Meeting Date -