Physical Progress(Phase 1) District Wise

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 56 OHT
  • 2 CWR
  • 435.76 D.System
  • 437 Comissioning
  • 9 Electricity
  • 23608 FHTC
  • 1183 HGJ
  • 2233 HGJ CERT
  • 6166 HOV
  • Scheme Wise Category A
  • 725 No. of Schemes
  • 1203 No. of Villages
  • Scheme Wise Category B
  • 3434 No. of Schemes
  • 6291 No. of Villages
  • Scheme Wise Category C
  • 1512 No. of Schemes
  • 2384 No. of Villages
  • Scheme Wise Total
  • 5671 Total No. of Schemes
  • 9878 Total No. of Villages
  • Village Wise Category A
  • 1076 No. of Villages
  • Village Wise Category B
  • 5665 No. of Villages
  • Village Wise Category C
  • 3074 No. of Villages
  • Village Wise Total
  • 9815 Total No. of Villages
  • 4604 Agreement Done Scheme
  • 8250 Agreement Done Village
Total 6556 47 49 38 36 36 3133 3099 0 0 9707 9367 96%
+0
5643
86 98.99 61 165 / 15 100.00 62 358 / 16
+0
550 / 550
213 / 83 1697
+0
1684
837 6 1 7 29
  +0
1563 | 1641
1547 3 / 0 1309 / 104 1136 -- -- -- 46 44 175 495 44 43 172 462 -- 6613 834 1697 525 217 955 251 139 4 + 25 + 1 + 40 + 8 = 78 4 + 76 + 1 + 83 + 8 = 172 1206 1102 337091 2359637 10112730 310742 92.18% 2196511 9662867 455
+0
412
+0
453
449 58095.78
+0.00
57660.02
6556 1687693 5372
+ 3
4322
1664089 0 0 98.60
+0
900 / 891
+0
6069 / 4893
1624724.00
+0.00 / +73460.64
1386769.67
85.35% 4 6 7 13805 11527 2278 1135 238 897
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
329
96 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 10 76 Verified Verified 10 76 Verification Remarks Minutes of Meeting 589 589 116 3 5 108 17 1 0 + 5 + 0 + 0 + 0 = 5 0 + 12 + 0 + 0 + 0 = 12 126 118 38849 271943 1165470 31670 81.52% 223829 965871 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 336
+ 3
281
127865 0 0 99.98
+0
41 / 41
+0
342 / 337
156314.00
+0.00 / +4554.33
136622.31
87.40% 1037 818 219 62 11 51
  • 24 FHTC
  • 6 HGJ
  • 61 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54657 FHTC Given
  • 99 FHTC(%)
  • 68 Balance FHTC
  • 89 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 32 No. of Schemes
  • 53 No. of Villages
  • Scheme Wise Category B
  • 18 No. of Schemes
  • 43 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 43 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 51 Total No. of Schemes
  • 97 Total No. of Villages
  • 93 Total No. of OHT
  • 51 Schemes Sent to O&M
  • 93 No. of OHT in O&M Schemes
  • 28153 Water Demand(M3)
  • 28578.30 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 579 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 65 Verification Remarks Minutes of Meeting 187 53 80 0 1 79 10 8 0 + 1 + 0 + 0 + 0 = 1 0 + 1 + 0 + 0 + 0 = 1 49 35 27662 193634 829860 26843 97.04% 197702 851544 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +5609.97
87435.51
93.79% 1672 1540 132 36 33 3
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 202 0 0 1271 1255 99%
+0
529
97.24 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 22 146 2 2 22 146 -- 776 642 196 3 6 187 27 9 0 + 6 + 0 + 0 + 0 = 6 0 + 13 + 0 + 0 + 0 = 13 175 153 66511 465577 1995330 58513 87.97% 421531 1817415 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 538
+ 3
482
210131 0 0 99.99
+0
75 / 75
+0
544 / 539
249536.00
+0.00 / +10164.30
224057.82
89.79% 0 0 0 2709 2358 351 98 44 54
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 72 58 81%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 1 1 1 0
  +0
25 | 25
25 3 / 0 4 / 0 3 Integrated Off Verified Verified 0 9 Verified Verified 0 9 Verification Remarks Minutes of Meeting 121 0 28 6 2 20 6 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 12 5171 36197 155130 4969 96.09% 20154 88982 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 57
30332.00
+0.00 / +1839.79
22158.51
73.05% 125 107 18 20 2 18
  • 3 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 42 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 30 No. of Villages
  • Village Wise Category C
  • 8 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 46 Total No. of Schemes
  • 97 Total No. of Villages
  • 74 Total No. of OHT
  • 42 Schemes Sent to O&M
  • 70 No. of OHT in O&M Schemes
  • 13076 Water Demand(M3)
  • 2898.23 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 51 50 98%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 12 Verified Verified 3 10 Verification Remarks Minutes of Meeting 142 0 17 0 1 16 10 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 3844 26908 115320 3113 80.98% 16050 106608 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
57
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +-609.64
19737.98
92.41% 105 101 4 10 0 10
  • 8 D.System
  • 2 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 287 236 82%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 3
  +0
88 | 88
80 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 0 Verified Not Verified 5 0 Verification Remarks Minutes of Meeting 414 0 91 7 57 27 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 72 68 8888 62216 266640 7944 89.38% 54989 240232 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 0
72
86114 0 0 99.95
+0
21 / 21
+0
238 / 162
95975.00
+0.00 / +7429.09
73359.78
76.44% 447 323 124 57 1 56
  • 3 OHT
  • 205 D.System
  • 46 COV
  • 43 FHTC
  • 2 HGJ
  • 214 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 30-Nov-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Nov-2025 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 338 286 85% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 3
  +0
105 | 105
97 0 / 0 51 / 0 15 -- -- -- 2 1 10 12 2 1 8 10 -- 556 0 108 7 58 43 11 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 76 69 12732 89124 381960 11057 86.84% 71039 346840 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 0
129
98039 0 0 100
+0
28 / 28
+0
297 / 221
117334.00
+0.00
93097.76
79% 552 424 128 67 1 66
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 408 343 84%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 1 1 1 3
  +0
130 | 130
122 3 / 0 55 / 0 18 -- -- -- 3 2 10 21 3 2 8 21 -- 677 0 136 13 60 63 17 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 90 81 17903 125321 537090 16026 89.52% 91193 435822 37
+0
37
+0
37
37 4510.90
+0.00
4254.41
414 117652 412
+ 0
173
117609 0 0 99.96
+0
41 / 41
+0
362 / 278
147666.00
+0.00 / +8659.24
115256.27
78.05% 0 0 0 677 531 146 87 3 84
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 7 Verified Verified 0 7 Verification Remarks Minutes of Meeting 79 0 130 121 7 2 1 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 63 57 449 3143 13470 459 102.23% 5138 23909 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +621.21
25719.52
94.90% Yes 732 532 200 62 7 55
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79955 FHTC Given
  • 99 FHTC(%)
  • 19 Balance FHTC
  • 140 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 21183.08 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 129 128 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 4 3 Verified Verified 4 3 Verification Remarks Minutes of Meeting 285 0 46 0 7 39 23 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 62 58 11042 77294 331260 5922 53.63% 39268 214221 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 45475 129
+ 0
127
45475 0 0 100.00
+0
10 / 10
+0
131 / 129
39878.00
+0.00 / +971.73
36621.43
91.83% 674 532 142 37 1 36
  • 5 HGJ
  • 7 HGJ CERT
  • 132 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 0 0 859 857 100%
+0
320
99.38 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 4 10 2 2 4 10 -- 364 0 176 121 14 41 24 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 125 115 11491 80437 344730 6381 55.53% 44406 238130 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
322 105150 322
+ 0
318
105150 0 0 100
+0
83 / 83
+0
324 / 322
66979.00
+0.00 / +1592.94
62340.95
93.08% 0 1 0 1406 1064 342 99 8 91
4 Jalaun BGCCPL-Ramky (JV)


8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 148 122 82%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
14 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 19 19 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.30
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 7
20745.00
+0.00 / +1265.50
5948.65
28.68% 70 39 31 13 0 13
  • 4 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-Dec-2025
Comissioning
0
  • 31-Dec-2025 Intake
  • 31-Dec-2025 WTP
  • 31-Dec-2025 T/W
  • 31-Dec-2025 OHT
  • 31-Dec-2025 CWR
  • 31-Dec-2025 D.System
  • 31-Dec-2025 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 54 HGJ Certified
  • 88.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 142 121 85%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 2 + 0 + 0 + 1 + 0 = 3 2 + 0 + 0 + 1 + 0 = 3 22 22 0 0 0 0 0% 0 0 6
+0
6
+0
6
5 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 5
13157.00
+0.00 / +864.81
3770.43
28.66% 45 19 26 19 0 19
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-Dec-2025
Comissioning
0
  • 31-Dec-2025 Intake
  • 31-Dec-2025 WTP
  • 31-Dec-2025 T/W
  • 31-Dec-2025 OHT
  • 31-Dec-2025 CWR
  • 31-Dec-2025 D.System
  • 31-Dec-2025 Comissioning
8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 01-Sep-2024 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
190 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 2 + 0 + 2 + 0 = 4 0 + 2 + 0 + 2 + 0 = 4 127 125 0 0 0 0 0% 0 0 5
+0
5
+0
5
4 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 126
+0
505 / 188
52161.00
+0.00 / +2468.71
49382.21
94.67% 548 335 213 64 1 63
  • 30 OHT
  • 3 D.System
  • 10 COV
  • 3 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Dec-2025
Comissioning
0
  • 31-Dec-2025 Intake
  • 31-Dec-2025 WTP
  • 31-Dec-2025 T/W
  • 31-Dec-2025 OHT
  • 31-Dec-2025 CWR
  • 31-Dec-2025 D.System
  • 31-Dec-2025 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
298 0 0 5 26
  +0
217 | 270
204 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 2 + 2 + 0 + 3 + 0 = 7 2 + 2 + 0 + 3 + 0 = 7 168 166 0 0 0 0 0% 0 0 18
+0
18
+0
18
16 3431.00
+0.00
3426.35
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 141
+0
645 / 200
86063.00
+0.00
59101.29
69% 663 393 270 96 1 95
GVPR


8135513 Sala GOV 197 17-Jul-2025 0 0 0 0 0 0 0 0 496 492 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 4 12 Verified Verified 4 12 Verification Remarks Minutes of Meeting 253 0 56 11 13 32 17 10 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 4 + 0 = 4 62 61 9319 65233 279570 8922 95.74% 60304 242533 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 176
+ 0
123
43076 0 0 99.95
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +2778.86
41240.12
81.50% 236 139 97 40 0 40
  • 22 FHTC
  • 21 HGJ
  • 74 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 2 3 0 0 0 0 0 0 0 1709 1597 93%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
354 0 0 5 26
  +0
273 | 326
260 0 / 0 169 / 0 24 -- -- -- 1 1 4 12 1 1 4 12 -- 253 0 357 312 13 32 17 10 2 + 2 + 0 + 7 + 0 = 11 2 + 2 + 0 + 7 + 0 = 11 230 227 9319 65233 279570 8922 95.74% 60304 242533 29
+0
29
+0
29
27 5146.00
+0.00
5141.35
857 184499 392
+ 0
217
180645 0 0 97.91
+0
156 / 153
+0
842 / 397
136662.00
+0.00 / +7377.88
100341.41
73.42% 0 0 0 889 522 367 134 1 133
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 192 163 85%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Not Integrated Off Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 37 0 13 13 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 45 45 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
894.94
87 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
82 / 55
29730.00
+0.00 / +5906.75
25851.08
86.95% 221 121 100 26 19 7
  • 5 D.System
  • 5 COV
  • 70 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 40 No. of Villages
  • Village Wise Category B
  • 65 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 14498.57 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 32 32 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
782.23
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 10
+0
74 / 39
29676.00
+0.00 / +1022.77
18958.13
63.88% 147 75 72 16 15 1
  • 4 D.System
  • 19 COV
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
27
25 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
14 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 29 29 0 0 0 0 0% 0 0 11
+0
11
+0
11
11 868.26
+0.00
863.85
106 27423 28
+ 0
1
27176 0 0 99.10
+0
12 / 12
+0
59 / 19
29490.00
+0.00 / +4432.05
19962.03
67.69% 92 59 33 25 19 6
  • 4 D.System
  • 47 COV
  • 247 FHTC
  • 78 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 531 454 85% 67 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
39 0 / 0 12 / 0 23 -- -- -- -- 37 0 40 40 0 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 106 106 0 0 0 0 0% 0 0 28
+0
28
+0
28
28 2554.76
+0.00
2541.02
286 87119 128
+ 0
10
86638 0 0 99
+0
31 / 31
+0
215 / 113
88896.00
+0.00
64771.24
73% 460 255 205 67 53 14
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 71 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 9 8 Verification Remarks Minutes of Meeting 88 73 14 0 0 14 3 2 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 4 3 8491 59437 254730 9636 113.48% 68595 314700 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +763.35
27954.08
99.20% Yes 263 259 4 18 16 2
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 64 98%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 16 13 5 0 0 5 2 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 1930 13510 57900 1937 100.36% 13186 74849 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +268.27
6605.35
87.87% Yes 100 99 1 4 4 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 74 99%
+0
36
97 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 33 28 7 0 0 7 0 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 9 3419 23933 102570 5942 173.79% 37719 155933 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +374.94
11763.97
93.05% Yes 117 104 13 6 5 1
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 9 8 7 0 0 7 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3346 23422 100380 3874 115.78% 28353 126747 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +1401.87
10864.98
98.44% Yes 50 50 0 8 8 0
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 82 70 14 0 0 14 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 11 8009 56063 240270 7742 96.67% 70884 342681 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +794.59
26800.71
95.74% Yes 218 195 23 12 11 1
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 425 99% 160 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 140 119 33 0 0 33 6 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 21 16704 116928 501120 19495 116.71% 150142 700210 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56035.01
95% 485 448 37 30 28 2
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 17 0 6 0 0 6 1 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 4025 28175 120750 5415 134.53% 35654 136794 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +552.03
8586.65
88.49% Yes 155 150 5 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 257 257 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 93 0 9 0 0 9 1 7 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 0 0 4211 29477 126330 6935 164.69% 48450 184874 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +756.30
12732.70
86.94% Yes 151 151 0 6 6 0
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 321 0 0 1577 1497 95%
+0
384
62.75 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
101 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 32 62 -- 375 192 102 40 0 62 11 18 0 + 0 + 0 + 3 + 1 = 4 0 + 0 + 0 + 5 + 1 = 6 135 130 33432 234024 1002960 41481 124.08% 302841 1336579 67
+0
53
+0
67
67 5890.10
+0.00
5876.00
612 201505 453
+ 0
323
201015 0 0 99.76
+0
117 / 117
+0
539 / 434
200615.00
+0.00 / +16272.92
170079.68
84.78% 0 0 3 1514 1263 251 126 107 19
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 110 96%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 12 Verified Verified 7 11 Verification Remarks Minutes of Meeting 104 0 13 0 0 13 4 2 0 + 1 + 0 + 0 + 0 = 1 0 + 3 + 0 + 0 + 0 = 3 5 5 4106 28742 123180 3475 84.63% 27864 123025 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +161.82
17443.84
99.07% Yes 93 87 6 20 1 19
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 163 95%
+0
60
98 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 4 9 Verified Verified 4 6 Verification Remarks Minutes of Meeting 103 0 17 0 2 15 9 0 0 + 2 + 0 + 0 + 0 = 2 0 + 6 + 0 + 0 + 0 = 6 28 26 5701 39907 171030 3567 62.57% 30986 134638 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +1018.91
21258.09
86.42% 239 191 48 22 0 22
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 110 95%
+0
59
98 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 98 0 15 0 0 15 10 1 0 + 1 + 0 + 0 + 1 = 2 0 + 2 + 0 + 0 + 1 = 3 19 18 5836 40852 175080 4689 80.35% 31026 161651 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 50
23368.00
+0.00 / +497.43
22027.38
94.26% 125 96 29 21 0 21
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 0 0 0 0 0 0 0 55 52 95%
+0
55
95 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 4 Verified Verified 2 2 Verification Remarks Minutes of Meeting 79 0 11 0 1 10 4 1 0 + 4 + 0 + 0 + 0 = 4 0 + 15 + 0 + 0 + 0 = 15 11 10 2717 19019 81510 2324 85.54% 15942 94967 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 45
15059.00
+0.00 / +2160.93
14818.61
98.40% 71 58 13 12 0 12
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 59 95%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 53 0 4 0 0 4 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1696 11872 50880 3091 182.25% 21532 90020 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +701.68
5804.70
97.12% 42 40 2 3 0 3
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 36 95%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 14
5996.00
+0.00 / +428.27
4735.34
78.97% 52 52 0 6 1 5
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 5 5 5 193 192 0 0 557 530 95% 245 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 18 35 5 5 18 29 -- 437 0 66 0 3 63 28 7 0 + 8 + 0 + 0 + 1 = 9 0 + 26 + 0 + 0 + 1 = 27 65 61 20979 146853 629370 17146 81.73% 127350 604301 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 37
+0
251 / 226
92606.00
+0.00
86087.96
93% 622 524 98 84 2 82
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 0 0 0 0 0 0 0 18 16 89%
+0
15
94 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Verified Verified 0 1 Verified Verified 0 1 Verification Remarks Minutes of Meeting 79 0 6 0 3 3 0 3 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 3 3 603 4221 18090 1163 192.87% 7050 23422 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
16 / 15
4615.00
+0.00 / +106.00
3545.95
76.84% 43 38 5 4 0 4
  • 1 HGJ
  • 1 HGJ CERT
  • 16 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 12 0 4 0 0 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 1363 122.02% 9556 40835 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +260.26
3765.78
81.62% Yes 23 23 0 6 1 5
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 0 0 0 0 0 0 0 0 54 46 85%
+0
4
17 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 0 0 Not Verified Verified 0 0 Verification Remarks Minutes of Meeting 84 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 12 2551 17857 76530 4598 180.24% 9992 35438 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
0
8735 0 0 100.00
+0
5 / 5
+0
22 / 21
8794.00
+0.00 / +96.90
7277.77
82.76% 51 16 35 10 0 10
  • 1 COV
  • 23 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 30 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 2 8 Verified Verified 2 5 Verification Remarks Minutes of Meeting 33 0 8 0 0 8 1 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1989 13923 59670 2915 146.56% 18321 73511 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +447.94
8056.90
91.18% Yes 27 24 3 9 2 7
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 0 0 0 0 0 0 0 58 52 90%
+0
31
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 15 0 12 0 0 12 2 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 17 16 3126 21882 93780 3153 100.86% 22584 98448 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 31
9528.00
+0.00 / +188.46
8843.68
92.82% 139 107 32 15 1 14
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 15 0 4 0 0 4 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 1875 13125 56250 2499 133.28% 16479 75714 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +303.52
4589.43
76.40% 49 43 6 6 0 6
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 3 3 3 64 62 0 0 215 201 93% 99 500.00 3 / 0 500.00 2 / 0
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 7 24 4 5 7 21 -- 159 0 36 0 0 36 3 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 34 33 10658 74606 319740 14528 136.31% 76932 323946 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
95
35931 0 0 100
+0
21 / 21
+0
118 / 116
37779.00
+0.00
32533.56
86% 289 213 76 46 4 42
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 108 99%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 6 Verified Verified 3 5 Verification Remarks Minutes of Meeting 58 0 7 0 1 6 1 1 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 19 18 3394 23758 101820 3577 105.39% 26397 107829 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 36
14171.00
+0.00 / +637.20
12582.41
88.79% 164 121 43 17 0 17
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 52 0 0 115 114 99%
+0
53
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 4 7 Verified Verified 4 7 Verification Remarks Minutes of Meeting 88 0 10 0 3 7 3 2 0 + 0 + 1 + 2 + 1 = 4 0 + 0 + 1 + 12 + 1 = 14 19 18 2727 19089 81810 2216 81.26% 12710 83618 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 38
13299.00
+0.00 / +753.01
11569.42
86.99% 215 181 34 21 0 21
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 97 99%
+0
44
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Verified Verified 7 14 Verified Verified 7 11 Verification Remarks Minutes of Meeting 48 0 15 0 0 15 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 9 4790 33530 143700 5566 116.20% 32210 142695 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 42
16681.00
+0.00 / +860.67
15409.87
92.38% 129 115 14 17 1 16
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 142 0 0 322 319 99% 144 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 14 27 3 3 14 23 -- 194 0 32 0 4 28 5 5 0 + 0 + 1 + 5 + 1 = 7 0 + 0 + 1 + 23 + 1 = 25 48 45 10911 76377 327330 11359 104.11% 71317 334142 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 116
44151.00
+0.00
39561.70
90% 508 417 91 55 1 54
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Not Verified 2 6 Verification Remarks Minutes of Meeting 48 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1322 103.52% 9255 37011 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +360.54
3434.39
85.09% Yes 35 35 0 6 0 6
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 15 15 14 12 12 422 415 0 0 1143 1097 96%
+0
522
94.91 100.00 16 19 / 1 100.00 16 32 / 2
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 41 95 14 14 41 95 -- 917 0 148 0 10 138 36 21 0 + 8 + 1 + 5 + 4 = 18 0 + 26 + 1 + 23 + 4 = 54 150 142 44434 311038 1333020 45518 102.44% 291903 1322821 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
511
156973 0 0 100
+0
86 / 86
+0
549 / 492
183187.00
+0.00 / +8983.54
165163.56
90.16% 0 2 0 1493 1223 270 192 6 186
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
98 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 57 0 18 0 0 18 0 4 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 6 3 6444 45108 193320 8758 135.91% 60806 266392 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
61 / 60
27118.00
+0.00 / +1171.89
26341.47
97.14% Yes Yes Yes 256 233 23 11 0 11
  • 1 HGJ
  • 1 HGJ CERT
  • 61 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 73 Villages
  • 26427 Households
  • 0 Last Week FHTC Given
  • 26427 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 86.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 67.12 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 46 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 8548 Water Demand(M3)
  • 6631.88 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
96 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 7 21 Verified Verified 7 20 Verification Remarks Minutes of Meeting 155 0 32 0 0 32 9 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 3 5652 39564 169560 6907 122.20% 42014 140545 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
78 / 74
23602.00
+0.00 / +628.07
22934.14
97.17% Yes Yes Yes 214 197 17 22 0 22
  • 1 D.System
  • 3 HGJ
  • 3 HGJ CERT
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Off Verified Verified 22 38 Verified Verified 22 35 Verification Remarks Minutes of Meeting 209 0 40 0 0 40 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 3 6961 48727 208830 7526 108.12% 51330 225857 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +1107.82
25934.64
99.71% 169 159 10 20 1 19
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 29 59 2 2 29 55 -- 364 0 72 0 0 72 9 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 6 12613 88291 378390 14433 114.43% 93344 366402 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
155 / 150
49611.00
+0.00
48868.78
99% 383 356 27 42 1 41
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 0 0 0 0 0 0 0 158 157 99%
+0
35
92 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 98 0 13 0 3 10 6 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 7 2433 17031 72990 2438 100.21% 11402 62557 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 11976 36
+ 0
35
11800 0 0 98.53
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +202.47
13546.69
85.81% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 2 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 300 293 98%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 220 0 29 0 7 22 6 3 2 + 0 + 0 + 2 + 0 = 4 2 + 0 + 0 + 2 + 0 = 4 26 23 6979 48853 209370 6716 96.23% 42585 165602 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 89
33301.00
+0.00 / +2484.34
27390.79
82.25% Yes 440 373 67 4 0 4
  • 1 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 344 5 5 3 3 3 212 211 0 0 1125 1115 99%
+0
337
97.97 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 35 87 5 5 35 87 -- 739 0 132 0 10 122 21 17 2 + 0 + 0 + 3 + 0 = 5 2 + 0 + 0 + 3 + 0 = 5 55 39 28470 199290 854100 32345 113.61% 208137 860953 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
344 112223 343
+ 0
328
112047 0 0 99.84
+0
59 / 59
+0
349 / 335
125817.00
+0.00 / +5594.59
116147.73
92.31% 2 2 4 1079 962 117 57 1 56
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Not Verified Verified 0 2 Not Verified Verified 0 2 Verification Remarks Minutes of Meeting 71 0 12 0 2 10 5 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 6 6640 46480 199200 7918 119.25% 42616 149805 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +1086.41
25282.10
93.98% 156 146 10 0 0 0
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 51 No. of Schemes
  • 100 No. of Villages
  • Scheme Wise Category C
  • 20 No. of Schemes
  • 31 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 53 No. of OHT in O&M Schemes
  • 11094 Water Demand(M3)
  • 6301.00 Water Supply (M3)
  • 52 Agreement Done Scheme
  • 102 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 3 7 Not Verified Verified 3 7 Verification Remarks Minutes of Meeting 130 0 15 0 0 15 1 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 4720 33040 141600 5757 121.97% 48947 210959 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 161 154 7 0 0 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 140 0 12 0 0 12 10 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 2 9559 66913 286770 5896 61.68% 41368 151075 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 174 148 26 6 0 6
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 0 Verified Verified 6 0 Verification Remarks Minutes of Meeting 196 0 25 0 2 23 12 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 12994 90958 389820 7117 54.77% 61380 284208 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
203
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +656.73
40194.44
98.95% Yes 288 282 6 0 0 0
  • 2 FHTC
  • 3 HGJ
  • 12 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 9 7 2 3 9 7 -- 466 0 52 0 2 50 23 17 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 15 4 27273 190911 818190 18770 68.82% 151695 646242 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
430
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
77310.33
95% 623 584 39 6 0 6
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 20 0 30 0 0 30 2 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 11587 81109 347610 12618 108.90% 87646 368675 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +461.10
29622.54
90.24% Yes Yes 191 183 8 0 0 0
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 255 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 6 15 Verified Verified 6 14 Verification Remarks Minutes of Meeting 42 0 25 0 0 25 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 5 11812 82684 354360 11838 100.22% 79769 373869 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
255 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
255 / 255
33415.00
+0.00 / +1123.68
31088.78
93.04% Yes Yes 283 271 12 0 0 0
  • 1 HGJ
  • 4 HGJ CERT
  • 190 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 414 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 44 2 2 15 43 -- 62 0 55 0 0 55 2 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 11 23399 163793 701970 24456 104.52% 167415 742544 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
414 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
414 / 414
66243.00
+0.00
60711.32
92% 474 454 20 0 0 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 297 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 7 Verified Verified 1 7 Verification Remarks Minutes of Meeting 228 0 102 0 0 102 29 14 0 + 2 + 0 + 4 + 0 = 6 0 + 4 + 0 + 4 + 0 = 8 52 48 25823 180761 774690 21508 83.29% 151823 621493 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +779.99
6563.00
100.00% 883 788 95 20 0 20
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 43 0 5 0 1 4 2 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 2368 16576 71040 1444 60.98% 11924 60066 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 61
+ 0
59
9111 0 0 98.18
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +355.47
5943.68
91.47% 47 46 1 1 0 1
  • 2 COV
  • 169 FHTC
  • 2 HGJ
  • 4 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 154 0 48 0 6 42 11 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 37 33 11314 79198 339420 10853 95.93% 106659 438738 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +216.86
12360.43
95.20% 452 387 65 17 0 17
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1590 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 6 7 25 60 5 7 25 60 -- 1024 0 274 0 11 263 72 46 0 + 2 + 0 + 4 + 0 = 6 0 + 4 + 0 + 4 + 0 = 8 125 102 96818 677726 2904540 84949 87.74% 632132 2658889 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1599
+ 0
1568
310272 0 0 99.75
+0
200 / 200
+0
1603 / 1569
200307.00
+0.00 / +4680.24
188170.86
93.94% 2 0 0 2635 2405 230 44 0 44
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
25 0 / 0 30 / 0 22 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 348 0 27 3 7 17 17 0 0 + 5 + 0 + 6 + 0 = 11 0 + 29 + 0 + 15 + 0 = 44 25 21 13627 95389 408810 918 6.74% 5557 20868 16
+0
16
+0
16
14 3904.00
+0.00
3893.00
179 66179 149
+ 0
69
63547 0 0 96.02
+0
14 / 14
+0
145 / 109
74794.00
+0.00 / +4008.54
60493.96
80.88% 311 269 42 57 0 57
  • 11 D.System
  • 26 COV
  • 2632 FHTC
  • 30 HGJ
  • 110 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17524 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 41 No. of Villages
  • Village Wise Category C
  • 41 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 0 Schemes Sent to O&M
  • 0 No. of OHT in O&M Schemes
  • 0 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 177 0 15 0 0 15 1 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 13 6425 44975 192750 8074 125.67% 55793 296222 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
23
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +482.10
12520.47
94.54% 81 54 27 10 0 10
  • 6 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 15 15 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +374.07
14928.46
62.82% 34 19 15 16 0 16
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 19 10 9 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 11 11 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +242.60
7233.26
60.93% 10 5 5 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 1 1 0 0 -- 177 0 43 28 0 15 1 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 32 6425 44975 192750 8074 125.67% 55793 296222 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
23
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
43840.34
71% 144 88 56 28 1 27
NCC Ltd.


8338933 Patwadh GOV 658 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
46 0 / 0 47 / 0 0 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 347 0 55 0 47 8 5 0 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 10 6 3690 25830 110700 2789 75.58% 14560 73287 15
+0
15
+0
15
15 3885.16
+0.00
3478.22
658 103482 203
+ 0
22
97770 0 0 94.48
+0
16 / 12
+0
429 / 61
99181.00
+0.00 / +3803.18
73000.43
73.60% 485 473 12 151 59 92
  • 406 D.System
  • 232 COV
  • 4 Electricity
  • 5712 FHTC
  • 455 HGJ
  • 636 HGJ CERT
  • 654 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Dec-2025
Comissioning
30/12/2025
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Dec-2025 D.System
  • 30-Dec-2025 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 205 0 12 0 11 1 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 27 189 810 60 222.22% 418 11472 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +244.23
10571.84
88.54% Yes 25 14 11 1 1 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 71 0 8 0 8 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 7 7 0 0 0 0 0% 10660 58506 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 23 14 9 8 1 7
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Verified Verified 1 0 Verified Verified 1 0 Verification Remarks Minutes of Meeting 104 0 9 0 9 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 17 17 0 0 0 0 0% 17438 98211 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 76
12858.00
+0.00 / +208.49
11482.31
89.30% 74 50 24 16 1 15
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 0 0 0 0 0 0 0 0 33 33 100%
+0
180
97 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
7 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 75 0 9 2 1 6 3 1 0 + 2 + 0 + 6 + 3 = 11 0 + 2 + 0 + 16 + 3 = 21 14 14 4944 34608 148320 4766 96.40% 39638 176716 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
186 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
169 / 158
23145.00
+0.00 / +769.23
19158.82
82.78% 276 252 24 35 1 34
  • 2 D.System
  • 16 COV
  • 105 FHTC
  • 3 HGJ
  • 53 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 44 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
95 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 161 0 10 0 10 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 12 12 0 0 0 0 0% 0 14443 6
+0
6
+0
6
6 918.46
+0.00
918.46
44 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 42
18231.00
+0.00 / +2.55
15743.43
86.36% 62 37 25 7 5 2
  • 8 FHTC
  • 1 HGJ CERT
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
95.84
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 0
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 3 2 1 0 0 0
  • 1 OHT
  • 6 D.System
  • 3 COV
  • 2 Electricity
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 360 4 0 0 0 0 0 0 0 169 168 99% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 1 0
  +0
38 | 38
34 0 / 0 1 / 0 30 -- -- -- 3 2 1 2 3 2 1 2 -- 411 0 39 5 28 6 3 1 0 + 2 + 0 + 8 + 3 = 13 0 + 2 + 0 + 20 + 3 = 25 51 51 4944 34608 148320 4766 96.40% 67736 347876 20
+0
20
+0
20
20 4824.34
+0.00
4812.95
360 58561 353
+ 0
277
57781 0 0 99
+0
25 / 23
+0
338 / 313
66677.00
+0.00
57304.82
86% 438 355 83 66 8 58
Total Sonbhadra 1305 5 6 2 2 2 41 41 0 0 546 541 99%
+0
1214
93.03 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
3 5 0 1 0
  +0
162 | 162
143 0 / 0 108 / 0 72 -- -- -- 5 3 1 2 5 3 1 2 -- 1488 0 176 36 93 47 26 5 0 + 7 + 0 + 18 + 3 = 28 0 + 31 + 0 + 41 + 3 = 75 121 113 28713 200991 861390 16607 57.84% 144064 749725 77
+0
75
+0
75
73 15534.95
+0.00
15091.81
1305 288480 764
+ 0
402
270247 0 0 93.68
+0
83 / 77
+0
957 / 527
313955.00
+0.00 / +10134.99
245211.39
78.10% 0 1 0 1403 1199 204 298 68 230
Project Completion Plan

Minutes of Meeting Date -