Physical Progress(Phase 1) District Wise

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake WTP No Of CWR No Of OHT O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Water supply Issues OHT 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Water supply Issues Village
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 63 OHT
  • 2 CWR
  • 504.49 D.System
  • 691 Comissioning
  • 25 Electricity
  • 32458 FHTC
  • 1241 HGJ
  • 2362 HGJ CERT
  • 6197 HOV
  • Scheme Wise Category A
  • 860 No. of Schemes
  • 1500 No. of Villages
  • Scheme Wise Category B
  • 3111 No. of Schemes
  • 5668 No. of Villages
  • Scheme Wise Category C
  • 1601 No. of Schemes
  • 2455 No. of Villages
  • Scheme Wise Total
  • 5572 Total No. of Schemes
  • 9623 Total No. of Villages
  • Village Wise Category A
  • 1619 No. of Villages
  • Village Wise Category B
  • 4778 No. of Villages
  • Village Wise Category C
  • 2880 No. of Villages
  • Village Wise Total
  • 9277 Total No. of Villages
  • 3729 Agreement Done Scheme
  • 6722 Agreement Done Village
Total 6596 45 47 38 35 35 3082 3032 0 0 9283 8968 97%
+0
5668
86 98.99 61 165 / 15 100.00 62 358 / 16
+0
550 / 550
213 / 83 1697
+0
1784
839 6 1 10 133
  +0
1554 | 1634
1518 0 / 0 1309 / 104 1136 -- -- -- 34 33 115 277 -- 7588 425 1697 626 311 760 321 95 9 + 46 + 17 + 30 + 36 = 138 13 + 83 + 19 + 76 + 43 = 234 282225 1975575 8466750 0 0% 1303806 6399606 455
+0
412
+0
453
445 58095.78
+0.00
57591.29
6596 1701150 5354
+ 1
4233
1668696 0 0 98.09
+0
900 / 875
+0
5835 / 4773
1624724.00
+0.00 / +0.00
1313309.03
80.83% 3 6 7 9765 7770 1995 2263 2246 17
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
325
95 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 5 25 Verification Remarks Minutes of Meeting 667 232 116 0 13 103 49 4 2 + 13 + 0 + 1 + 3 = 19 2 + 14 + 0 + 1 + 3 = 20 37058 259406 1111740 25042 67.58% 159565 877016 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 302
+ 1
211
127736 0 0 99.88
+0
41 / 41
+0
342 / 335
156314.00
+0.00 / +0.00
132067.98
84.49% 736 601 135 175 175 0
  • 153 FHTC
  • 40 HGJ
  • 131 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 91 Villages
  • 54807 Households
  • 0 Last Week FHTC Given
  • 54739 FHTC Given
  • 99 FHTC(%)
  • 68 Balance FHTC
  • 90 HGJ
  • 90 HGJ Certified
  • 98.90 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 47 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.31 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 26 No. of Schemes
  • 40 No. of Villages
  • Scheme Wise Category B
  • 24 No. of Schemes
  • 50 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 40 No. of Villages
  • Village Wise Category B
  • 50 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 91 Total No. of Villages
  • 51 Total No. of Schemes
  • 91 Total No. of Villages
  • 89 Total No. of OHT
  • 50 Schemes Sent to O&M
  • 88 No. of OHT in O&M Schemes
  • 27114 Water Demand(M3)
  • 27114.30 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 91 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 201 0 0 580 578 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Off Verified Verified 12 58 Verification Remarks Minutes of Meeting 232 172 80 0 1 79 35 8 0 + 5 + 1 + 1 + 0 = 7 0 + 5 + 1 + 1 + 0 = 7 27684 193788 830520 17241 62.28% 179480 801026 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
200
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
81825.54
87.77% 1186 1048 138 105 105 0
  • 2 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 201 0 0 1271 1254 99%
+0
525
96.51 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 17 83 -- 899 404 196 0 14 182 84 12 2 + 18 + 1 + 2 + 3 = 26 2 + 19 + 1 + 2 + 3 = 27 64742 453194 1942260 0 0% 296761 1635758 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 504
+ 1
411
210002 0 0 99.93
+0
75 / 75
+0
544 / 537
249536.00
+0.00 / +0.00
213893.52
85.72% 0 0 0 1922 1649 273 280 280 0
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 72 58 81%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 1 1 1 0
  +0
25 | 25
24 0 / 0 4 / 0 3 Integrated Off Verified Verified 0 4 Verification Remarks Minutes of Meeting 170 0 28 8 19 1 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 159 1113 4770 3 1.89% 3 14019 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 57
30332.00
+0.00 / +0.00
20318.72
66.99% 88 77 11 36 36 0
  • 3 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44623 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 70 OHT Required
  • 70 OHT Completed
  • Scheme Wise Category A
  • 24 No. of Schemes
  • 117 No. of Villages
  • Scheme Wise Category B
  • 23 No. of Schemes
  • 27 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 117 No. of Villages
  • Village Wise Category B
  • 27 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 144 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 82 Total No. of OHT
  • 43 Schemes Sent to O&M
  • 78 No. of OHT in O&M Schemes
  • 16000 Water Demand(M3)
  • 18344.13 Water Supply (M3)
  • 42 Agreement Done Scheme
  • 86 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 51 50 98%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 3 2 Verification Remarks Minutes of Meeting 100 0 17 0 0 17 17 0 0 + 3 + 0 + 0 + 0 = 3 0 + 3 + 0 + 0 + 0 = 3 4278 29946 128340 0 0% 18090 76372 6
+0
6
+0
6
6 576.00
+0.00
538.34
59 11925 59
+ 0
53
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20347.62
95.26% 88 69 19 27 27 0
  • 37 D.System
  • 6 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 287 236 82%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 5
  +0
86 | 86
60 0 / 0 29 / 0 4 Integrated Off Not Verified Not Verified 5 0 Verification Remarks Minutes of Meeting 656 0 91 2 77 12 12 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 4995 34965 149850 0 0% 23463 105102 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 0
56
86114 0 0 99.95
+0
21 / 21
+0
233 / 146
95975.00
+0.00 / +0.00
65930.69
68.70% 334 252 82 134 134 0
  • 5 OHT
  • 205 D.System
  • 51 COV
  • 43 FHTC
  • 2 HGJ
  • 230 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 30-Jun-2025 OHT
  • 30-Jun-2024 CWR
  • 31-Aug-2025 D.System
  • 31-Jul-2025 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 338 286 85% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 5
  +0
103 | 103
77 0 / 0 51 / 0 15 -- -- -- 1 1 8 2 -- 756 0 108 2 77 29 29 0 0 + 3 + 0 + 0 + 1 = 4 0 + 3 + 0 + 0 + 1 = 4 9273 64911 278190 0 0% 41553 181474 26
+0
26
+0
26
26 3628.00
+0.00
3385.20
345 98082 343
+ 0
109
98039 0 0 100
+0
28 / 28
+0
292 / 205
117334.00
+0.00
86278.31
74% 422 321 101 161 161 0
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 408 343 84%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 1 1 1 5
  +0
128 | 128
101 0 / 0 55 / 0 18 -- -- -- 2 2 8 6 -- 926 0 136 10 96 30 30 0 0 + 3 + 0 + 0 + 1 = 4 0 + 3 + 0 + 0 + 1 = 4 9433 66031 282990 0 0% 41553 195489 37
+0
37
+0
37
37 4510.90
+0.00
4225.70
414 117652 412
+ 0
153
117609 0 0 99.96
+0
41 / 41
+0
357 / 262
147666.00
+0.00 / +0.00
106597.03
72.19% 0 0 0 510 398 112 197 197 0
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 7 Verification Remarks Minutes of Meeting 61 0 130 118 6 6 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1109 7763 33270 876 78.99% 5215 22980 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25098.31
92.61% Yes 487 384 103 121 121 0
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 135 Villages
  • 75404 Households
  • 0 Last Week FHTC Given
  • 75385 FHTC Given
  • 99 FHTC(%)
  • 19 Balance FHTC
  • 132 HGJ
  • 124 HGJ Certified
  • 91.85 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 53 Handed Over Initiated/Approved On Portal
  • 60.00 Handed Over %
  • 39 OHT Required
  • 39 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 108 No. of Villages
  • Scheme Wise Category B
  • 24 No. of Schemes
  • 27 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 3 No. of Villages
  • Village Wise Category A
  • 108 No. of Villages
  • Village Wise Category B
  • 27 No. of Villages
  • Village Wise Category C
  • 3 No. of Villages
  • Village Wise Total
  • 138 Total No. of Villages
  • 102 Total No. of Schemes
  • 138 Total No. of Villages
  • 105 Total No. of OHT
  • 75 Schemes Sent to O&M
  • 78 No. of OHT in O&M Schemes
  • 19543 Water Demand(M3)
  • 20177.69 Water Supply (M3)
  • 91 Agreement Done Scheme
  • 126 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 134 129 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Not Verified 4 3 Verification Remarks Minutes of Meeting 152 0 46 0 43 3 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 878 6146 26340 221 25.17% 2745 14079 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 48335 134
+ 0
127
48335 0 0 100.00
+0
10 / 10
+0
131 / 130
39878.00
+0.00 / +0.00
35649.70
89.40% 482 351 131 73 73 0
  • 7 HGJ CERT
  • 130 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 327 2 2 2 2 2 327 320 0 0 859 857 100%
+0
320
97.86 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 1 4 10 -- 213 0 176 118 49 9 7 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1987 13909 59610 0 0% 6864 35962 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
327 108010 327
+ 0
318
108010 0 0 100
+0
83 / 83
+0
324 / 323
66979.00
+0.00 / +0.00
60748.01
90.70% 0 1 0 969 723 246 194 194 0
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
190 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 5
+0
5
+0
5
4 2511.00
+0.00
2505.50
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 124
+0
504 / 188
52161.00
+0.00 / +0.00
46913.50
89.94% 394 291 103 127 127 0
  • 30 OHT
  • 5 D.System
  • 11 COV
  • 5 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2025
Comissioning
0
  • 31-Jul-2025 Intake
  • 31-Jul-2025 WTP
  • 31-Jul-2025 T/W
  • 31-Jul-2025 OHT
  • 31-Jul-2025 CWR
  • 31-Jul-2025 D.System
  • 31-Jul-2025 Comissioning
  • 60 Villages
  • 26350 Households
  • 0 Last Week FHTC Given
  • 26350 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 60 HGJ
  • 53 HGJ Certified
  • 88.33 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 20 Handed Over Initiated/Approved On Portal
  • 38.33 Handed Over %
  • 34 OHT Required
  • 34 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category C
  • 56 No. of Schemes
  • 63 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 60 Total No. of OHT
  • 28 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5080 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 0 Agreement Done Scheme
  • 0 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 148 122 82%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
14 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.00
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 7
+0
72 / 7
20745.00
+0.00 / +0.00
4683.15
22.57% 47 32 15 16 16 0
  • 1 D.System
  • 11 COV
  • 1 Electricity
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-Jul-2025
Comissioning
0
  • 31-Jul-2025 Intake
  • 31-Jul-2025 WTP
  • 31-Jul-2025 T/W
  • 31-Jul-2025 OHT
  • 31-Jul-2025 CWR
  • 31-Jul-2025 D.System
  • 31-Jul-2025 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 142 121 85%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
11 0 0 0 1
  +0
9 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 6
+0
6
+0
6
5 425.00
+0.00
424.20
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 6
+0
61 / 5
13157.00
+0.00 / +0.00
2905.62
22.08% 21 17 4 7 7 0
  • 1 OHT
  • 6 COV
  • 1 Electricity
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-Jul-2025
Comissioning
0
  • 31-Jul-2025 Intake
  • 31-Jul-2025 WTP
  • 31-Jul-2025 T/W
  • 31-Jul-2025 OHT
  • 31-Jul-2025 CWR
  • 31-Jul-2025 D.System
  • 31-Jul-2025 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
297 0 0 5 26
  +0
216 | 270
204 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 18
+0
18
+0
18
16 3431.00
+0.00
3423.70
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 137
+0
637 / 200
86063.00
+0.00
54502.27
63% 462 340 122 150 150 0
GVPR


8135513 Sala GOV 197 0 0 0 0 0 0 0 0 496 490 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Not Verified Verified 1 0 Verification Remarks Minutes of Meeting 166 0 56 39 11 6 2 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1602 11214 48060 406 25.34% 11166 25629 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 176
+ 0
122
43076 0 0 99.95
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
38461.26
76.01% 124 97 27 58 58 0
  • 22 FHTC
  • 21 HGJ
  • 75 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 0 3 0 0 0 0 0 0 0 1709 1595 93%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
353 0 0 5 26
  +0
272 | 326
260 0 / 0 169 / 0 24 -- -- -- 0 1 1 0 -- 166 0 357 340 11 6 2 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1602 11214 48060 0 0% 10760 25223 29
+0
29
+0
29
27 5146.00
+0.00
5138.70
857 184499 392
+ 0
216
180645 0 0 97.91
+0
156 / 149
+0
834 / 397
136662.00
+0.00 / +0.00
92963.53
68.02% 0 0 0 576 431 145 206 206 0
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 192 163 85%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 13 13 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
894.94
87 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
82 / 55
29730.00
+0.00 / +0.00
19944.33
67.08% 134 82 52 56 56 0
  • 5 D.System
  • 5 COV
  • 70 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 100 Villages
  • 47583 Households
  • 0 Last Week FHTC Given
  • 46777 FHTC Given
  • 98 FHTC(%)
  • 806 Balance FHTC
  • 95 HGJ
  • 89 HGJ Certified
  • 89.00 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 44 Handed Over Initiated/Approved On Portal
  • 75.00 Handed Over %
  • 15 OHT Required
  • 13 OHT Completed
  • Scheme Wise Category A
  • 27 No. of Schemes
  • 37 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 56 No. of Villages
  • Scheme Wise Category C
  • 4 No. of Schemes
  • 4 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 66 Total No. of Schemes
  • 97 Total No. of Villages
  • 79 Total No. of OHT
  • 63 Schemes Sent to O&M
  • 76 No. of OHT in O&M Schemes
  • 11985 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 63 Agreement Done Scheme
  • 94 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
24
26 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
782.23
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 9
+0
60 / 39
29676.00
+0.00 / +0.00
17935.36
60.44% 109 50 59 32 32 0
  • 4 D.System
  • 33 COV
  • 1 Electricity
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
27
25 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
11 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 11
+0
11
+0
11
10 868.26
+0.00
863.85
106 27423 27
+ 0
1
27171 0 0 99.08
+0
12 / 12
+0
51 / 11
29490.00
+0.00 / +0.00
15529.98
52.66% 63 50 13 48 48 0
  • 4 D.System
  • 55 COV
  • 252 FHTC
  • 79 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 531 454 85% 64 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
36 0 / 0 12 / 0 23 -- -- -- -- 0 0 40 40 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 28
+0
28
+0
28
27 2554.76
+0.00
2541.02
286 87119 127
+ 0
10
86633 0 0 99
+0
31 / 30
+0
193 / 105
88896.00
+0.00
53409.67
60% 306 182 124 136 136 0
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 73 70 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Verified Verified 9 8 Verification Remarks Minutes of Meeting 166 0 14 0 0 14 0 5 1 + 0 + 0 + 1 + 0 = 2 5 + 0 + 0 + 3 + 0 = 8 8491 59437 254730 13412 157.96% 81592 340186 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 28830 72
+ 0
69
28821 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27190.73
96.49% Yes 189 180 9 43 43 0
  • 9 FHTC
  • 3 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 64 98%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verification Remarks Minutes of Meeting 46 0 5 0 0 5 2 2 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 1930 13510 57900 2743 142.12% 15534 62278 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6337.08
84.30% Yes 77 72 5 12 12 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 74 99%
+0
36
97 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verification Remarks Minutes of Meeting 64 0 7 0 1 6 5 0 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 3133 21931 93990 692 22.09% 12559 78914 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11389.03
90.08% Yes 81 67 14 17 17 0
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verification Remarks Minutes of Meeting 31 0 7 0 0 7 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3346 23422 100380 3117 93.16% 21651 94837 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
9463.11
85.74% Yes 43 39 4 25 25 0
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verification Remarks Minutes of Meeting 97 0 14 0 2 12 3 1 1 + 4 + 0 + 0 + 0 = 5 1 + 4 + 0 + 0 + 0 = 5 7169 50183 215070 9307 129.82% 49887 245577 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26006.12
92.90% Yes 167 146 21 37 37 0
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 425 99% 160 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 -- 238 0 33 0 3 30 13 3 1 + 4 + 1 + 0 + 2 = 8 1 + 4 + 1 + 0 + 2 = 8 15578 109046 467340 15859 101.80% 99631 481606 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
53195.34
90% 368 324 44 91 91 0
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verification Remarks Minutes of Meeting 23 0 6 0 0 6 0 1 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 4025 28175 120750 4350 108.07% 28808 122783 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8034.62
82.80% Yes 99 96 3 20 20 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 257 257 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+100
109
0 0 0 0 100
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verification Remarks Minutes of Meeting 115 0 9 0 0 9 2 0 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 4211 29477 126330 7040 167.18% 29739 147100 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
11976.40
81.78% Yes 120 115 5 29 29 0
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 611 7 7 7 7 7 325 320 0 0 1577 1497 95%
+0
381
62.36 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
202
0 0 0 0 100
  +0
102 | 102
98 0 / 0 112 / 0 99 -- -- -- 7 7 32 56 -- 542 0 102 40 3 59 15 9 2 + 4 + 2 + 1 + 4 = 13 6 + 4 + 2 + 3 + 4 = 19 32306 226142 969180 0 0% 199110 1051015 67
+0
53
+0
67
66 5890.10
+0.00
5876.00
611 200920 451
+ 0
322
200425 0 0 99.75
+0
117 / 116
+0
517 / 426
200615.00
+0.00 / +0.00
153806.76
76.67% 0 0 3 1082 897 185 319 319 0
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 59 59 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Off Verified Verified 3 9 Verification Remarks Minutes of Meeting 144 0 13 0 3 10 7 0 0 + 0 + 2 + 0 + 2 = 4 0 + 0 + 3 + 0 + 2 = 5 3362 23534 100860 1970 58.60% 11766 52761 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 37
17608.00
+0.00 / +0.00
17282.02
98.15% Yes 63 55 8 17 17 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 101 Villages
  • 44662 Households
  • 0 Last Week FHTC Given
  • 44662 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 101 HGJ
  • 94 HGJ Certified
  • 93.07 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 44 Handed Over Initiated/Approved On Portal
  • 50.50 Handed Over %
  • 13 OHT Required
  • 11 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 8 No. of Schemes
  • 67 No. of Villages
  • Scheme Wise Category C
  • 9 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 9 No. of Villages
  • Village Wise Category B
  • 45 No. of Villages
  • Village Wise Category C
  • 32 No. of Villages
  • Village Wise Total
  • 86 Total No. of Villages
  • 22 Total No. of Schemes
  • 86 Total No. of Villages
  • 38 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11058 Water Demand(M3)
  • 3774.33 Water Supply (M3)
  • 11 Agreement Done Scheme
  • 64 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 89 88 99%
+0
60
98 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 4 0 Verification Remarks Minutes of Meeting 141 0 17 0 8 9 8 0 0 + 4 + 7 + 0 + 3 = 14 0 + 13 + 8 + 0 + 4 = 25 3417 23919 102510 1044 30.55% 13345 114072 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 52
24598.00
+0.00 / +0.00
20239.18
82.28% 169 130 39 34 34 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 0 0 0 0 0 0 0 45 44 98%
+0
59
98 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 135 0 15 1 10 4 4 0 0 + 3 + 1 + 0 + 1 = 5 0 + 14 + 1 + 0 + 1 = 16 1935 13545 58050 421 21.76% 5154 52774 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 44
23368.00
+0.00 / +0.00
21529.95
92.13% 79 49 30 25 25 0
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 0 0 0 0 0 0 0 30 28 93%
+0
55
95 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 0 0 Verification Remarks Minutes of Meeting 125 0 11 0 8 3 2 1 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 7 = 7 570 3990 17100 548 96.14% 4012 17908 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 5
+0
58 / 50
15059.00
+0.00 / +0.00
12657.68
84.05% 49 46 3 12 12 0
  • 1 Electricity
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 10 9 90%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 1 Verification Remarks Minutes of Meeting 124 0 4 0 1 3 1 1 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 1565 10955 46950 2058 131.50% 14164 47267 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5103.02
85.38% 29 22 7 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 12 12 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 4 2 1 1 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 272 1904 8160 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 11
5996.00
+0.00 / +0.00
4307.07
71.83% 42 37 5 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 4 4 4 133 132 0 0 245 240 98% 245 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 4 4 9 10 -- 669 0 66 1 34 31 23 3 0 + 7 + 10 + 0 + 11 = 28 0 + 27 + 12 + 0 + 17 = 56 11121 77847 333630 6041 54.32% 48441 284782 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 36
+0
251 / 201
92606.00
+0.00
81118.92
88% 431 339 92 97 97 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 0 0 0 0 0 0 0 18 18 100%
+0
16
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 103 0 6 5 1 0 0 0 0 + 0 + 0 + 0 + 3 = 3 0 + 0 + 0 + 0 + 4 = 4 0 0 0 0 0% 12 49 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 4454 16
+ 0
16
4454 0 0 100.00
+0
4 / 4
+0
16 / 12
4615.00
+0.00 / +0.00
3439.95
74.54% 38 21 17 8 8 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verification Remarks Minutes of Meeting 35 0 4 0 0 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1117 7819 33510 1157 103.58% 7331 30293 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3505.52
75.98% Yes 20 19 1 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 0 0 0 0 0 0 0 0 37 27 73%
+0
4
17 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 123 0 8 0 6 2 2 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1068 7476 32040 325 30.43% 1860 7760 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
0
8735 0 0 100.00
+0
5 / 4
+0
21 / 13
8794.00
+0.00 / +0.00
7180.87
81.66% 27 16 11 12 12 0
  • 2 COV
  • 1 Electricity
  • 23 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 30 0 0 23 23 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 2 2 Verification Remarks Minutes of Meeting 38 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1989 13923 59670 2350 118.15% 12979 28663 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
7608.96
86.11% Yes 15 11 4 10 10 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 0 0 0 0 0 0 0 37 36 97%
+0
31
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 0 5 Verification Remarks Minutes of Meeting 41 0 12 0 0 12 1 1 0 + 0 + 2 + 0 + 2 = 4 0 + 0 + 2 + 0 + 2 = 4 3126 21882 93780 3286 105.12% 16361 82036 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
31 / 31
9528.00
+0.00 / +0.00
8655.22
90.84% 107 89 18 14 14 0
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 45 45 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Not Verified Not Verified Verification Remarks Minutes of Meeting 21 0 4 0 0 4 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1875 13125 56250 2319 123.68% 15620 61493 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4285.91
71.35% 35 25 10 7 7 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 3 3 3 64 62 0 0 157 146 93% 99 500.00 3 / 0 500.00 2 / 0
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 3 3 5 11 -- 258 0 36 0 6 30 3 2 0 + 0 + 2 + 0 + 2 = 4 0 + 0 + 2 + 0 + 2 = 4 9175 64225 275250 9437 102.86% 54151 210245 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
95
35931 0 0 100
+0
21 / 20
+0
116 / 108
37779.00
+0.00
31236.48
83% 204 160 44 50 50 0
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 44 0 0 93 93 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 5 Verification Remarks Minutes of Meeting 82 8 7 0 0 7 5 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 4365 30555 130950 1178 26.99% 12703 52226 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 33
14171.00
+0.00 / +0.00
11945.21
84.29% 118 95 23 19 19 0
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 52 0 0 93 92 99%
+0
53
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 3 3 Verification Remarks Minutes of Meeting 74 4 10 0 2 8 6 0 0 + 0 + 1 + 2 + 1 = 4 0 + 0 + 1 + 12 + 1 = 14 3554 24878 106620 294 8.27% 18378 79454 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 40
13299.00
+0.00 / +0.00
10816.41
81.33% 165 135 30 23 23 0
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 37 0 0 90 89 99%
+0
44
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 6 6 Verification Remarks Minutes of Meeting 104 9 15 0 0 15 6 0 0 + 3 + 0 + 0 + 2 = 5 0 + 5 + 0 + 0 + 2 = 7 4600 32200 138000 4213 91.59% 22323 93043 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 6
+0
45 / 36
16681.00
+0.00 / +0.00
14549.20
87.22% 83 77 6 25 25 0
  • 2 Electricity
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 133 0 0 276 274 99% 144 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 12 14 -- 260 21 32 0 2 30 17 0 0 + 3 + 1 + 5 + 3 = 12 0 + 5 + 1 + 23 + 3 = 32 12519 87633 375570 5685 45.41% 53404 224723 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 19
+0
145 / 109
44151.00
+0.00
37310.82
85% 366 307 59 67 67 0
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 26 26 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 53 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1277 8939 38310 1322 103.52% 9254 37136 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3073.85
76.16% Yes 25 20 5 8 8 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 551 15 15 13 11 11 362 346 0 0 719 701 97%
+0
523
94.92 100.00 16 19 / 1 100.00 16 32 / 2
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 11 10 26 35 -- 1343 21 148 6 43 99 43 5 0 + 10 + 13 + 5 + 19 = 47 0 + 32 + 15 + 23 + 26 = 96 34097 238679 1022910 0 0% 142778 734450 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
551 157926 550
+ 0
512
157926 0 0 100
+0
86 / 82
+0
547 / 449
183187.00
+0.00 / +0.00
156180.02
85.26% 0 2 0 1060 844 216 225 225 0
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 61 61 0 0 201 201 100%
+0
61
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Verified Verified 6 18 Verification Remarks Minutes of Meeting 138 0 18 0 0 18 2 3 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 6444 45108 193320 6250 96.99% 45902 165852 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 22511 61
+ 0
61
22511 0 0 100.00
+0
7 / 7
+0
61 / 61
27118.00
+0.00 / +0.00
25169.58
92.82% Yes Yes Yes 187 156 31 21 21 0
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 68 Villages
  • 20375 Households
  • 0 Last Week FHTC Given
  • 20308 FHTC Given
  • 99 FHTC(%)
  • 67 Balance FHTC
  • 64 HGJ
  • 59 HGJ Certified
  • 86.76 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 42 Handed Over Villages(before Portal)
  • 3 Handed Over Initiated/Approved On Portal
  • 66.18 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 30 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 9 No. of Schemes
  • 9 No. of Villages
  • Village Wise Category A
  • 4 No. of Villages
  • Village Wise Category B
  • 55 No. of Villages
  • Village Wise Category C
  • 9 No. of Villages
  • Village Wise Total
  • 68 Total No. of Villages
  • 41 Total No. of Schemes
  • 68 Total No. of Villages
  • 53 Total No. of OHT
  • 39 Schemes Sent to O&M
  • 41 No. of OHT in O&M Schemes
  • 5163 Water Demand(M3)
  • 6257.90 Water Supply (M3)
  • 41 Agreement Done Scheme
  • 68 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 78 77 0 0 235 235 100%
+0
78
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Verified Verified 4 20 Verification Remarks Minutes of Meeting 178 0 32 0 0 32 2 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6637 46459 199110 7502 113.03% 47767 187780 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 25257 78
+ 0
78
25257 0 0 100.00
+0
11 / 11
+0
78 / 78
23602.00
+0.00 / +0.00
22306.07
94.51% Yes Yes 104 70 34 37 37 0
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 1 25 Verification Remarks Minutes of Meeting 474 0 40 0 0 40 16 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6642 46494 199260 4445 66.92% 38848 154470 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 77
26009.00
+0.00 / +0.00
24826.82
95.45% 110 81 29 28 28 0
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 155 154 0 0 467 467 100% 155 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 5 45 -- 652 0 72 0 0 72 18 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13279 92953 398370 11947 89.97% 86615 342250 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 53329 155
+ 0
154
53329 0 0 100
+0
34 / 34
+0
155 / 155
49611.00
+0.00
47132.89
95% 214 151 63 65 65 0
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 0 0 0 0 0 0 0 158 157 99%
+0
36
95 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 91 0 13 0 4 9 7 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2728 19096 81840 801 29.36% 8241 31430 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 12331 37
+ 0
35
12155 0 0 98.57
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13344.22
84.53% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 300 293 98%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Verified Verified 0 2 Verification Remarks Minutes of Meeting 204 0 29 1 14 14 11 0 3 + 0 + 0 + 0 + 3 = 6 3 + 0 + 0 + 0 + 3 = 6 4727 33089 141810 1779 37.63% 7329 70673 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
81
30104 0 0 100.00
+0
9 / 9
+0
95 / 85
33301.00
+0.00 / +0.00
24906.45
74.79% Yes 256 58 198 4 4 0
  • 1 D.System
  • 14 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 349 5 5 4 3 3 216 215 0 0 1125 1115 99%
+0
342
97.99 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 4 4 11 65 -- 1085 0 132 1 18 113 38 18 3 + 0 + 1 + 0 + 3 = 7 3 + 0 + 1 + 0 + 3 = 7 27178 190246 815340 0 0% 127309 589428 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
349 118275 348
+ 0
331
118099 0 0 99.85
+0
59 / 59
+0
349 / 337
125817.00
+0.00 / +0.00
110553.14
87.87% 1 2 4 657 365 292 90 90 0
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Not Verified Not Verified 0 2 Verification Remarks Minutes of Meeting 79 0 12 0 3 9 8 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6304 44128 189120 268 4.25% 28220 93814 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
24195.69
89.94% 136 100 36 22 21 1
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 124 Villages
  • 33701 Households
  • 0 Last Week FHTC Given
  • 33626 FHTC Given
  • 99 FHTC(%)
  • 75 Balance FHTC
  • 121 HGJ
  • 119 HGJ Certified
  • 95.97 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 74.19 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 52 No. of Schemes
  • 87 No. of Villages
  • Scheme Wise Category C
  • 23 No. of Schemes
  • 34 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 83 No. of Villages
  • Village Wise Category C
  • 37 No. of Villages
  • Village Wise Total
  • 121 Total No. of Villages
  • 76 Total No. of Schemes
  • 123 Total No. of Villages
  • 78 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 161 Water Demand(M3)
  • 5765.00 Water Supply (M3)
  • 53 Agreement Done Scheme
  • 89 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 103 0 15 0 1 14 9 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4632 32424 138960 3824 82.56% 33794 122013 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 138 128 10 34 34 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 0 0 Verification Remarks Minutes of Meeting 101 0 12 0 0 12 6 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9559 66913 286770 5445 56.96% 42508 167563 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 118 107 11 62 62 0
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 214 212 0 0 276 276 100%
+0
214
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 0 0 Verification Remarks Minutes of Meeting 160 0 25 0 0 25 14 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14505 101535 435150 6988 48.18% 54607 256170 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42759 213
+ 0
204
42757 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
39537.71
97.33% Yes 216 208 8 89 89 0
  • 2 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 441 435 0 0 479 479 100% 441 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 2 2 0 0 -- 364 0 52 0 1 51 29 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 28696 200872 860880 16257 56.65% 130909 545746 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92871 440
+ 0
431
92869 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
76653.60
94% 472 443 29 185 185 0
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 14 Verification Remarks Minutes of Meeting 33 0 30 0 0 30 0 0 0 + 1 + 0 + 0 + 2 = 3 0 + 1 + 0 + 0 + 2 = 3 11587 81109 347610 11252 97.11% 78508 319568 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29161.44
88.83% Yes Yes 154 111 43 40 37 3
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 255 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 4 Verification Remarks Minutes of Meeting 109 0 25 0 0 25 3 13 1 + 0 + 0 + 0 + 2 = 3 1 + 0 + 0 + 0 + 2 = 3 11812 82684 354360 17543 148.52% 86961 350060 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
255 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
255 / 255
33415.00
+0.00 / +0.00
29965.10
89.68% Yes Yes 244 199 45 48 40 8
  • 1 HGJ
  • 4 HGJ CERT
  • 190 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 414 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 18 -- 142 0 55 0 0 55 3 13 1 + 1 + 0 + 0 + 4 = 6 1 + 1 + 0 + 0 + 4 = 6 23399 163793 701970 28795 123.06% 165469 669628 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
414 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
414 / 414
66243.00
+0.00
59126.54
89% 398 310 88 88 77 11
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 309 01-Feb-2024 1 1 1 1 305 297 0 0 234 234 100%
+0
298
96 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Verified Not Verified 1 0 Verification Remarks Minutes of Meeting 400 0 102 18 11 73 29 11 0 + 2 + 0 + 3 + 0 = 5 0 + 3 + 0 + 5 + 0 = 8 17181 120267 515430 12718 74.02% 63232 218028 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
309 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
5783.01
88.12% 715 561 154 131 129 2
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 6 HGJ
  • 13 HGJ CERT
  • 283 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 58 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 60 0 5 0 5 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 61
+ 0
58
9111 0 0 98.18
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5588.21
86.00% 37 21 16 14 13 1
  • 2 COV
  • 169 FHTC
  • 2 HGJ
  • 5 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 204 0 48 0 8 40 13 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13929 97503 417870 16126 115.77% 111400 448964 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12143.57
93.53% 352 250 102 72 70 2
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1609 9 9 9 9 9 1609 1589 0 0 1069 1065 100%
+0
1591
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 5 4 16 20 -- 1249 0 274 18 28 228 82 37 1 + 3 + 0 + 3 + 4 = 11 1 + 4 + 0 + 5 + 4 = 14 89510 626570 2685300 0 0% 425066 1902016 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1609 311079 1600
+ 0
1568
310295 0 0 99.75
+0
200 / 200
+0
1603 / 1569
200307.00
+0.00 / +0.00
183490.62
91.60% 2 0 0 2110 1685 425 510 493 17
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 1 1
  +0
24 | 25
24 0 / 0 30 / 0 22 Integrated Not Verified Not Verified Verification Remarks Minutes of Meeting 353 0 27 5 17 5 4 0 0 + 2 + 0 + 6 + 0 = 8 0 + 15 + 0 + 15 + 0 = 30 3642 25494 109260 6 0.16% 837 837 16
+0
16
+0
16
14 3904.00
+0.00
3893.00
179 66179 147
+ 0
64
59612 0 0 90.08
+0
14 / 14
+0
145 / 61
74794.00
+0.00 / +0.00
56485.42
75.52% 180 139 41 44 44 0
  • 2 OHT
  • 11 D.System
  • 26 COV
  • 6567 FHTC
  • 32 HGJ
  • 115 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
3 Nos New OHTs work as per Revised DPR.
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 31-Jan-2025 OHT
  • 30-May-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
  • 54 Villages
  • 14221 Households
  • 0 Last Week FHTC Given
  • 14221 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 54 HGJ
  • 39 HGJ Certified
  • 72.22 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 10 Handed Over Villages(before Portal)
  • 32 Handed Over Initiated/Approved On Portal
  • 77.78 Handed Over %
  • 1 OHT Required
  • 1 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 19 No. of Schemes
  • 53 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 48 No. of Villages
  • Village Wise Category C
  • 6 No. of Villages
  • Village Wise Total
  • 54 Total No. of Villages
  • 20 Total No. of Schemes
  • 54 Total No. of Villages
  • 23 Total No. of OHT
  • 0 Schemes Sent to O&M
  • 0 No. of OHT in O&M Schemes
  • 0 Water Demand(M3)
  • 2025.45 Water Supply (M3)
  • 19 Agreement Done Scheme
  • 53 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 255 0 15 1 0 14 7 6 0 + 2 + 0 + 0 + 2 = 4 0 + 2 + 0 + 0 + 2 = 4 8553 59871 256590 3587 41.94% 11069 11069 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
23
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12038.37
90.90% 56 45 11 11 11 0
  • 6 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
58
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
0 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 17131 21
+ 0
0
11231 0 0 65.56
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14554.39
61.24% 24 24 0 12 12 0
  • 13 D.System
  • 58 COV
  • 5900 FHTC
  • 37 HGJ
  • 58 HGJ CERT
  • 57 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 15 10 5 1 1 0
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 11 11 0 0 0 0 1 + 1 + 0 + 0 + 0 = 2 1 + 1 + 0 + 0 + 0 = 2 0 0 0 0 0% 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
6990.66
58.89% 6 5 1 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 101 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
23 0 / 0 30 / 0 20 -- -- -- 0 0 0 0 -- 255 0 43 29 0 14 7 6 1 + 3 + 0 + 0 + 2 = 6 1 + 3 + 0 + 0 + 2 = 6 8553 59871 256590 3587 41.94% 11069 11069 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 52728 50
+ 0
23
42974 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
42741.57
70% 101 84 17 25 25 0
NCC Ltd.


8338933 Patwadh GOV 660 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
1 0 0 1 0
  +0
54 | 54
45 0 / 0 47 / 0 0 Integrated Not Verified Not Verified Verification Remarks Minutes of Meeting 47 0 55 54 1 0 0 0 0 + 2 + 0 + 6 + 0 = 8 0 + 2 + 0 + 9 + 0 = 11 0 0 0 0 0% 0 0 15
+0
15
+0
15
12 3885.16
+0.00
3440.85
660 103838 187
+ 0
15
93990 0 102 90.52
+0
16 / 5
+0
204 / 45
99181.00
+0.00 / +0.00
69197.25
69.77% 252 243 9 106 106 0
  • 1 OHT
  • 444 D.System
  • 457 COV
  • 11 Electricity
  • 9848 FHTC
  • 473 HGJ
  • 645 HGJ CERT
  • 656 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 30/08/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Jul-2025
Comissioning
30/08/2025
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 30-Aug-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Jul-2025 D.System
  • 30-Aug-2025 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified Verification Remarks Minutes of Meeting 219 0 12 0 12 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 1401 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10327.61
86.50% Yes 20 12 8 6 6 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 0 2 Verification Remarks Minutes of Meeting 98 0 8 0 5 3 2 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 886 6202 26580 588 66.37% 1627 10185 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 16 14 2 6 6 0
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 0 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Not Verified Verified 0 0 Verification Remarks Minutes of Meeting 107 0 9 0 4 5 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2690 18830 80700 834 31.00% 12454 74710 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 13080 80
+ 0
69
13066 0 0 99.89
+0
5 / 5
+0
80 / 76
12858.00
+0.00 / +0.00
11273.82
87.68% 58 52 6 11 11 0
  • 2 D.System
  • 14 FHTC
  • 11 HGJ CERT
  • 70 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 206 0 0 0 0 0 0 0 0 33 33 100%
+0
199
97 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
2 0 0 1 1
  +0
7 | 7
7 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 86 0 9 2 0 7 3 4 0 + 1 + 0 + 5 + 0 = 6 0 + 1 + 0 + 15 + 0 = 16 5597 39179 167910 5451 97.39% 38083 142528 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
206 21651 203
+ 0
144
21546 0 0 99.52
+0
6 / 6
+0
197 / 168
23145.00
+0.00 / +0.00
18389.59
79.45% 208 195 13 32 32 0
  • 2 OHT
  • 2 D.System
  • 9 COV
  • 105 FHTC
  • 3 HGJ
  • 62 HGJ CERT
  • 150 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 44 20-Jun-2024 0 0 0 0 0 0 0 0 51 51 100%
+0
42
95 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 10 0 10 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 0 0 0 0 0% 0 0 6
+0
6
+0
6
6 918.46
+0.00
918.46
44 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 42
18231.00
+0.00 / +0.00
15740.88
86.34% 41 37 4 11 11 0
  • 8 FHTC
  • 1 HGJ CERT
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
95.84
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 0
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 3 2 1 2 2 0
  • 1 OHT
  • 6 D.System
  • 3 COV
  • 2 Electricity
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 380 2 0 0 0 0 0 0 0 169 168 99% 361 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
2 0 0 2 1
  +0
36 | 36
34 0 / 0 1 / 0 30 -- -- -- 1 2 0 2 -- 291 0 39 5 19 15 9 5 0 + 1 + 0 + 7 + 0 = 8 0 + 1 + 0 + 19 + 0 = 20 9173 64211 275190 6873 74.93% 52164 227423 20
+0
20
+0
20
20 4824.34
+0.00
4812.95
380 60844 374
+ 0
289
60064 0 0 99
+0
25 / 23
+0
366 / 323
66677.00
+0.00
56324.55
84% 326 300 26 62 62 0
Total Sonbhadra 1334 5 4 2 2 2 41 41 0 0 546 541 99%
+0
1239
92.88 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
6 5 0 4 2
  +0
156 | 157
138 0 / 0 108 / 0 72 -- -- -- 1 2 0 2 -- 1165 0 176 93 49 34 20 11 1 + 8 + 0 + 19 + 2 = 30 1 + 21 + 0 + 43 + 2 = 67 21370 149590 641100 0 0% 53605 230265 77
+0
75
+0
75
70 15534.95
+0.00
15054.44
1334 292634 770
+ 0
402
265685 0 0 90.79
+0
83 / 70
+0
760 / 473
313955.00
+0.00 / +0.00
235076.40
74.88% 0 1 0 879 778 101 242 242 0
Project Completion Plan