Physical Progress(Phase 1) District Wise

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 59 OHT
  • 2 CWR
  • 446.76 D.System
  • 499 Comissioning
  • 15 Electricity
  • 23608 FHTC
  • 1183 HGJ
  • 2260 HGJ CERT
  • 6167 HOV
  • Scheme Wise Category A
  • 726 No. of Schemes
  • 1205 No. of Villages
  • Scheme Wise Category B
  • 3378 No. of Schemes
  • 6190 No. of Villages
  • Scheme Wise Category C
  • 1504 No. of Schemes
  • 2368 No. of Villages
  • Scheme Wise Total
  • 5608 Total No. of Schemes
  • 9763 Total No. of Villages
  • Village Wise Category A
  • 1080 No. of Villages
  • Village Wise Category B
  • 5597 No. of Villages
  • Village Wise Category C
  • 3023 No. of Villages
  • Village Wise Total
  • 9700 Total No. of Villages
  • 4606 Agreement Done Scheme
  • 8254 Agreement Done Village
Total 6559 47 49 39 36 36 3136 3099 0 0 9707 9364 96%
+0
5641
86 98.99 61 165 / 15 100.00 62 358 / 16
+0
550 / 550
213 / 83 1697
+0
1684
838 6 1 8 31
  +0
1558 | 1638
1546 3 / 0 1309 / 104 1136 -- -- -- 43 44 149 459 38 43 141 422 -- 7521 336 1697 545 304 848 247 135 3 + 35 + 2 + 34 + 9 = 83 3 + 82 + 2 + 78 + 9 = 174 1661 1559 306110 2142770 9183300 276323 90.27% 1827518 8422174 455
+0
412
+0
453
446 58095.78
+0.00
57649.02
6559 1689231 5375
+ 10
4298
1665627 0 0 98.60
+0
900 / 885
+0
6028 / 4847
1624724.00
+0.00 / +0.00
1313309.03
80.83% 4 6 7 12727 9425 3302 993 99 894
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
328
96 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 5 60 Verified Verified 5 60 Verification Remarks Minutes of Meeting 437 0 116 0 4 112 37 0 0 + 15 + 0 + 2 + 0 = 17 0 + 15 + 0 + 3 + 0 = 18 124 119 40946 286622 1228380 31759 77.56% 228373 776272 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 336
+ 5
263
127865 0 0 99.98
+0
41 / 41
+0
342 / 335
156314.00
+0.00 / +0.00
132067.98
84.49% 955 742 213 62 0 62
  • 24 FHTC
  • 6 HGJ
  • 79 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54657 FHTC Given
  • 99 FHTC(%)
  • 68 Balance FHTC
  • 89 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 32 No. of Schemes
  • 53 No. of Villages
  • Scheme Wise Category B
  • 18 No. of Schemes
  • 43 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 43 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 51 Total No. of Schemes
  • 97 Total No. of Villages
  • 93 Total No. of OHT
  • 51 Schemes Sent to O&M
  • 93 No. of OHT in O&M Schemes
  • 28153 Water Demand(M3)
  • 28089.79 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 578 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 11 68 Verification Remarks Minutes of Meeting 227 30 80 0 0 80 23 8 0 + 2 + 0 + 0 + 0 = 2 0 + 2 + 0 + 0 + 0 = 2 67 60 27904 195328 837120 25352 90.85% 162570 784633 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
81825.54
87.77% 1542 1348 194 36 1 35
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 202 0 0 1271 1254 99%
+0
528
97.06 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 17 130 2 2 16 130 -- 664 30 196 0 4 192 60 8 0 + 17 + 0 + 2 + 0 = 19 0 + 17 + 0 + 3 + 0 = 20 191 179 68850 481950 2065500 57111 82.95% 390943 1560905 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 538
+ 5
464
210131 0 0 99.99
+0
75 / 75
+0
544 / 537
249536.00
+0.00 / +0.00
213893.52
85.72% 0 0 0 2497 2090 407 98 1 97
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 72 58 81%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 1 1 1 0
  +0
25 | 25
25 3 / 0 4 / 0 3 Integrated Off Verified Verified 0 9 Verified Verified 0 9 Verification Remarks Minutes of Meeting 176 0 28 6 12 10 7 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 14 2459 17213 73770 0 0% 13932 44918 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 57
30332.00
+0.00 / +0.00
20318.72
66.99% 119 97 22 20 2 18
  • 3 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 70 OHT Required
  • 70 OHT Completed
  • Scheme Wise Category A
  • 42 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 30 No. of Villages
  • Village Wise Category C
  • 8 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 46 Total No. of Schemes
  • 97 Total No. of Villages
  • 74 Total No. of OHT
  • 42 Schemes Sent to O&M
  • 70 No. of OHT in O&M Schemes
  • 13076 Water Demand(M3)
  • 2898.23 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 51 50 98%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 10 Verified Verified 3 10 Verification Remarks Minutes of Meeting 156 0 17 0 1 16 14 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 13 3884 27188 116520 1475 37.98% 16982 103127 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
57
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20347.62
95.26% 102 85 17 10 0 10
  • 8 D.System
  • 2 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 287 236 82%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 4
  +0
87 | 87
79 0 / 0 29 / 0 4 Integrated Off Not Verified Not Verified 5 0 Not Verified Not Verified 5 0 Verification Remarks Minutes of Meeting 576 0 91 7 84 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 85 85 0 0 0 0 0% 0 86852 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 4
68
86114 0 0 99.95
+0
21 / 21
+0
233 / 157
95975.00
+0.00 / +0.00
65930.69
68.70% 420 274 146 57 1 56
  • 4 OHT
  • 205 D.System
  • 51 COV
  • 43 FHTC
  • 2 HGJ
  • 218 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 30-Sep-2025 OHT
  • 30-Jun-2024 CWR
  • 31-Aug-2025 D.System
  • 31-Jul-2025 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 338 286 85% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 4
  +0
104 | 104
96 0 / 0 51 / 0 15 -- -- -- 1 1 10 10 1 1 8 10 -- 732 0 108 7 85 16 14 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 98 98 3884 27188 116520 1475 37.98% 16982 189979 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 4
125
98039 0 0 100
+0
28 / 28
+0
292 / 216
117334.00
+0.00
86278.31
74% 522 359 163 67 1 66
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 408 343 84%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 1 1 1 4
  +0
129 | 129
121 3 / 0 55 / 0 18 -- -- -- 2 2 10 19 2 2 8 19 -- 908 0 136 13 97 26 21 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 114 112 6343 44401 190290 1475 23.25% 30914 234897 37
+0
37
+0
37
37 4510.90
+0.00
4254.41
414 117652 412
+ 4
169
117609 0 0 99.96
+0
41 / 41
+0
357 / 273
147666.00
+0.00 / +0.00
106597.03
72.19% 0 0 0 641 456 185 87 3 84
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Verified Verified 0 7 Verified Verified 0 7 Verification Remarks Minutes of Meeting 68 0 130 121 1 8 6 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 81 81 1458 10206 43740 859 58.92% 3999 20084 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25098.31
92.61% Yes 650 454 196 60 7 53
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 138 Villages
  • 77668 Households
  • 0 Last Week FHTC Given
  • 77649 FHTC Given
  • 99 FHTC(%)
  • 19 Balance FHTC
  • 135 HGJ
  • 126 HGJ Certified
  • 91.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 55 Handed Over Initiated/Approved On Portal
  • 60.14 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 20857.45 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 133 129 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Verified Verified 4 3 Verified Verified 4 3 Verification Remarks Minutes of Meeting 273 0 46 14 25 7 7 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 73 71 2181 15267 65430 1062 48.69% 8627 118153 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 47135 133
+ 0
128
47135 0 0 100.00
+0
10 / 10
+0
131 / 130
39878.00
+0.00 / +0.00
35649.70
89.40% 643 438 205 35 1 34
  • 1 HGJ
  • 6 HGJ CERT
  • 130 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 326 2 2 2 2 2 326 320 0 0 859 857 100%
+0
320
98.16 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 4 10 2 2 4 10 -- 341 0 176 135 26 15 13 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 154 152 3639 25473 109170 1921 52.79% 12626 138237 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
326 106810 326
+ 0
319
106810 0 0 100
+0
83 / 83
+0
324 / 323
66979.00
+0.00 / +0.00
60748.01
90.70% 0 1 0 1293 892 401 95 8 87
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 01-Sep-2024 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
190 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 133 130 0 0 0 0 0% 0 0 5
+0
5
+0
5
4 2511.00
+0.00
2507.00
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 126
+0
505 / 188
52161.00
+0.00 / +0.00
46913.50
89.94% 532 293 239 64 1 63
  • 30 OHT
  • 4 D.System
  • 10 COV
  • 3 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 53 HGJ Certified
  • 86.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 50 OHT Required
  • 50 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 148 122 82%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
14 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 22 22 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.30
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 7
20745.00
+0.00 / +0.00
4683.15
22.57% 70 32 38 13 0 13
  • 4 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 142 121 85%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
11 0 0 0 1
  +0
9 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 22 22 0 0 0 0 0% 0 0 6
+0
6
+0
6
5 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 5
13157.00
+0.00 / +0.00
2905.62
22.08% 43 17 26 19 0 19
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
297 0 0 5 26
  +0
216 | 270
204 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 177 174 0 0 0 0 0% 0 0 18
+0
18
+0
18
16 3431.00
+0.00
3425.55
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 141
+0
645 / 200
86063.00
+0.00
54502.27
63% 645 342 303 96 1 95
GVPR


8135513 Sala GOV 197 17-Jul-2025 0 0 0 0 0 0 0 0 496 490 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 4 10 Verified Verified 4 10 Verification Remarks Minutes of Meeting 342 0 56 19 37 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 63 60 0 0 0 0 0% 11988 137978 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 176
+ 0
122
43076 0 0 99.95
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
38461.26
76.01% 197 104 93 40 0 40
  • 22 FHTC
  • 21 HGJ
  • 75 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 2 3 0 0 0 0 0 0 0 1709 1595 93%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
353 0 0 5 26
  +0
272 | 326
260 0 / 0 169 / 0 24 -- -- -- 1 1 4 10 1 1 4 10 -- 342 0 357 320 37 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 239 233 0 0 0 0 0% 11988 137978 29
+0
29
+0
29
27 5146.00
+0.00
5140.55
857 184499 392
+ 0
216
180645 0 0 97.91
+0
156 / 153
+0
842 / 397
136662.00
+0.00 / +0.00
92963.53
68.02% 0 0 0 832 440 392 134 1 133
5 Jhansi BGCCPL-Ramky (JV)


8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 32 32 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
782.23
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 10
+0
68 / 39
29676.00
+0.00 / +0.00
17935.36
60.44% 141 50 91 16 0 16
  • 4 D.System
  • 25 COV
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 125 Villages
  • 49735 Households
  • 0 Last Week FHTC Given
  • 48218 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 106 HGJ
  • 96 HGJ Certified
  • 76.80 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.40 Handed Over %
  • 15 OHT Required
  • 15 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 38 No. of Villages
  • Village Wise Category B
  • 64 No. of Villages
  • Village Wise Category C
  • 21 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 4246.64 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
27
25 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
14 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 33 33 0 0 0 0 0% 0 0 11
+0
11
+0
11
11 868.26
+0.00
863.85
106 27423 28
+ 0
1
27176 0 0 99.10
+0
12 / 12
+0
56 / 19
29490.00
+0.00 / +0.00
15529.98
52.66% 87 50 37 21 2 19
  • 4 D.System
  • 50 COV
  • 247 FHTC
  • 78 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 192 163 85%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Not Integrated Off Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 54 0 13 13 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 51 51 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
894.94
87 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
82 / 55
29730.00
+0.00 / +0.00
19944.33
67.08% 206 82 124 26 1 25
  • 5 D.System
  • 5 COV
  • 70 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 531 454 85% 67 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
39 0 / 0 12 / 0 23 -- -- -- -- 54 0 40 40 0 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 116 116 0 0 0 0 0% 0 0 28
+0
28
+0
28
28 2554.76
+0.00
2541.02
286 87119 128
+ 0
10
86638 0 0 99
+0
31 / 31
+0
206 / 113
88896.00
+0.00
53409.67
60% 434 182 252 63 3 60
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 71 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 9 8 Verification Remarks Minutes of Meeting 101 33 14 0 0 14 2 2 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 25 22 8491 59437 254730 9661 113.78% 59835 297952 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27190.73
96.49% Yes 251 213 38 18 16 2
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 64 98%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 42 37 5 0 0 5 1 1 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 4 4 1930 13510 57900 2039 105.65% 14543 79669 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6337.08
84.30% Yes 97 93 4 4 4 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 74 99%
+0
36
97 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 55 47 7 0 0 7 0 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 12 3419 23933 102570 5129 150.01% 28619 148025 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11389.03
90.08% Yes 106 86 20 6 5 1
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 18 16 7 0 0 7 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 3346 23422 100380 4421 132.13% 20495 115574 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
9463.11
85.74% Yes 49 48 1 8 8 0
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 64 52 14 0 0 14 1 4 1 + 0 + 0 + 0 + 1 = 2 1 + 0 + 0 + 0 + 1 = 2 15 13 8009 56063 240270 10867 135.68% 65005 330990 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26006.12
92.90% Yes 201 175 26 12 11 1
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 425 99% 160 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 179 152 33 0 0 33 2 12 1 + 0 + 1 + 0 + 1 = 3 1 + 0 + 1 + 0 + 1 = 3 32 30 16704 116928 501120 22456 134.43% 128662 674258 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
53195.34
90% 453 402 51 30 28 2
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 18 0 6 0 0 6 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 4025 28175 120750 4815 119.63% 29413 148306 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8034.62
82.80% Yes 142 140 2 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 56 56 0 0 257 257 100%
+0
56
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Off Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 150 121 9 0 2 7 6 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 3533 24731 105990 0 0% 13176 108648 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15726 56
+ 0
56
15726 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
11976.40
81.78% Yes 148 145 3 6 6 0
  • 1 HGJ
  • 1 HGJ CERT
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 611 7 7 7 7 7 325 320 0 0 1577 1497 95%
+0
383
62.68 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
101 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 32 62 -- 502 306 102 40 2 60 10 16 1 + 0 + 1 + 3 + 1 = 6 1 + 0 + 1 + 5 + 1 = 8 177 170 32754 229278 982620 36931 112.75% 231086 1229164 67
+0
53
+0
67
67 5890.10
+0.00
5876.00
611 201383 452
+ 0
322
200893 0 0 99.76
+0
117 / 117
+0
530 / 434
200615.00
+0.00 / +0.00
153806.76
76.67% 0 0 3 1428 1082 346 122 57 65
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 110 95%
+0
59
98 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 138 0 15 0 0 15 11 4 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 26 21 5836 40852 175080 4431 75.93% 25337 168798 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 58
23368.00
+0.00 / +0.00
21529.95
92.13% 109 52 57 16 0 16
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 0 0 0 0 0 0 0 55 52 95%
+0
55
95 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 4 Verified Verified 2 2 Verification Remarks Minutes of Meeting 93 0 11 0 0 11 0 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 9 2917 20419 87510 5305 181.86% 28439 107245 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 48
15059.00
+0.00 / +0.00
12657.68
84.05% 67 50 17 10 0 10
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 59 95%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 48 0 4 0 0 4 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 1696 11872 50880 2906 171.34% 20544 86690 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5103.02
85.38% 36 23 13 2 0 2
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 36 95%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 923 6461 27690 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 14
5996.00
+0.00 / +0.00
4307.07
71.83% 51 41 10 5 0 5
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 110 96%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 5 12 Verified Verified 5 10 Verification Remarks Minutes of Meeting 107 0 13 0 0 13 3 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 8 4106 28742 123180 4724 115.05% 23375 111365 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 46
17608.00
+0.00 / +0.00
17282.02
98.15% Yes 84 70 14 13 1 12
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 163 95%
+0
60
98 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 4 9 Not Verified Verified 4 5 Verification Remarks Minutes of Meeting 132 0 17 0 0 17 3 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 29 20 6661 46627 199830 11140 167.24% 59138 191809 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
20239.18
82.28% 214 153 61 18 0 18
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
Agency Total 251 6 5 5 5 193 192 0 0 557 530 95% 245 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 16 35 3 4 16 27 -- 518 0 66 0 0 66 17 31 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 89 67 22139 154973 664170 28506 128.76% 156833 665907 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 37
+0
251 / 233
92606.00
+0.00
81118.92
88% 561 389 172 64 1 63
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 0 0 0 0 0 0 0 18 16 89%
+0
15
94 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 0 0 Not Verified Verified 0 0 Verification Remarks Minutes of Meeting 79 0 6 0 4 2 1 1 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 6 4 426 2982 12780 406 95.31% 1962 10843 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
16 / 14
4615.00
+0.00 / +0.00
3439.95
74.54% 41 19 22 3 0 3
  • 1 HGJ
  • 1 HGJ CERT
  • 16 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 5 0 4 0 0 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1117 7819 33510 1181 105.73% 9021 42146 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3505.52
75.98% Yes 21 19 2 3 0 3
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 0 0 0 0 0 0 0 0 54 46 85%
+0
4
17 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 44 0 8 0 0 8 5 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 8 2551 17857 76530 1861 72.95% 11533 44739 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
0
8735 0 0 100.00
+0
5 / 5
+0
22 / 20
8794.00
+0.00 / +0.00
7180.87
81.66% 44 16 28 6 0 6
  • 1 COV
  • 23 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 30 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 2 8 Verified Verified 2 5 Verification Remarks Minutes of Meeting 30 0 8 0 0 8 2 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 8 1989 13923 59670 2461 123.73% 13762 67824 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
7608.96
86.11% Yes 24 11 13 9 2 7
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 0 0 0 0 0 0 0 58 52 90%
+0
31
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 23 0 12 0 0 12 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 17 14 3126 21882 93780 3039 97.22% 23347 30737 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 31
9528.00
+0.00 / +0.00
8655.22
90.84% 130 89 41 10 0 10
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 16 0 4 0 0 4 0 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 1875 13125 56250 2575 137.33% 16073 84388 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4285.91
71.35% 43 27 16 2 0 2
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 3 3 3 64 62 0 0 215 201 93% 99 500.00 3 / 0 500.00 2 / 0
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 7 24 5 5 7 21 -- 118 0 36 0 0 36 7 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 44 38 10658 74606 319740 11117 104.31% 73736 269834 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
95
35931 0 0 100
+0
21 / 21
+0
118 / 115
37779.00
+0.00
31236.48
83% 262 162 100 30 2 28
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 108 99%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 6 Verified Verified 3 5 Verification Remarks Minutes of Meeting 66 0 7 0 0 7 1 1 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 20 18 4365 30555 130950 3714 85.09% 25498 106909 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 35
14171.00
+0.00 / +0.00
11945.21
84.29% 149 97 52 13 0 13
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 52 0 0 115 114 99%
+0
53
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 4 7 Not Verified Verified 4 5 Verification Remarks Minutes of Meeting 66 0 10 0 2 8 0 0 0 + 0 + 1 + 2 + 1 = 4 0 + 0 + 1 + 12 + 1 = 14 27 22 3554 24878 106620 3712 104.45% 26370 116046 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 37
13299.00
+0.00 / +0.00
10816.41
81.33% 197 135 62 16 0 16
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 97 99%
+0
44
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 6 14 Verified Verified 6 11 Verification Remarks Minutes of Meeting 24 0 15 0 0 15 7 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 14 4790 33530 143700 4064 84.84% 31745 155377 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 36
16681.00
+0.00 / +0.00
14549.20
87.22% 117 89 28 13 1 12
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 142 0 0 322 319 99% 144 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 13 27 2 3 13 21 -- 156 0 32 0 2 30 8 1 0 + 0 + 1 + 5 + 1 = 7 0 + 0 + 1 + 23 + 1 = 25 63 54 12709 88963 381270 11490 90.41% 83613 378332 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 108
44151.00
+0.00
37310.82
85% 463 321 142 42 1 41
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 6 Verification Remarks Minutes of Meeting 55 0 8 0 0 8 2 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 8 1277 8939 38310 1324 103.68% 8707 26223 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3073.85
76.16% Yes 32 20 12 4 0 4
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 15 15 14 12 12 422 415 0 0 1143 1097 96%
+0
522
94.91 100.00 16 19 / 1 100.00 16 32 / 2
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 38 94 11 14 38 94 -- 926 0 148 0 6 142 35 40 0 + 0 + 1 + 5 + 4 = 10 0 + 0 + 1 + 23 + 4 = 28 209 170 47216 330512 1416480 52841 111.91% 324852 1351137 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
511
156973 0 0 100
+0
86 / 86
+0
549 / 489
183187.00
+0.00 / +0.00
156180.02
85.26% 0 2 0 1355 908 447 141 4 137
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
98 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 60 0 18 0 0 18 0 5 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 11 9 6444 45108 193320 9070 140.75% 47362 243578 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
61 / 60
27118.00
+0.00 / +0.00
25169.58
92.82% Yes Yes Yes 230 209 21 11 0 11
  • 1 HGJ
  • 1 HGJ CERT
  • 61 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 73 Villages
  • 26427 Households
  • 0 Last Week FHTC Given
  • 26427 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 86.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 67.12 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 46 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 8548 Water Demand(M3)
  • 6631.88 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
96 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 4 21 Verified Verified 4 20 Verification Remarks Minutes of Meeting 139 0 32 0 0 32 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 16 5652 39564 169560 7025 124.29% 45115 189489 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
78 / 74
23602.00
+0.00 / +0.00
22306.07
94.51% Yes Yes Yes 178 117 61 22 0 22
  • 1 D.System
  • 3 HGJ
  • 3 HGJ CERT
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 7 29 Verified Verified 3 21 Verification Remarks Minutes of Meeting 343 0 40 0 0 40 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 29 6961 48727 208830 7619 109.45% 53011 196107 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 77
26009.00
+0.00 / +0.00
24826.82
95.45% 153 108 45 20 1 19
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 11 50 2 2 7 41 -- 482 0 72 0 0 72 1 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 55 45 12613 88291 378390 14644 116.10% 98126 385596 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
155 / 151
49611.00
+0.00
47132.89
95% 331 225 106 42 1 41
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 0 0 0 0 0 0 0 158 157 99%
+0
35
92 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 103 0 13 0 3 10 5 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 12 2715 19005 81450 1512 55.69% 8091 8091 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 11976 36
+ 0
35
11800 0 0 98.53
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13344.22
84.53% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 2 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 300 293 98%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 265 0 29 0 6 23 6 4 2 + 0 + 0 + 3 + 0 = 5 2 + 0 + 0 + 3 + 0 = 5 38 35 7528 52696 225840 4526 60.12% 34168 142642 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
81
30104 0 0 100.00
+0
9 / 9
+0
95 / 85
33301.00
+0.00 / +0.00
24906.45
74.79% Yes 400 252 148 4 0 4
  • 1 D.System
  • 14 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 344 5 5 4 3 3 212 211 0 0 1125 1115 99%
+0
337
97.97 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 17 78 5 5 13 78 -- 910 0 132 0 9 123 12 14 2 + 0 + 0 + 4 + 0 = 6 2 + 0 + 0 + 4 + 0 = 6 116 101 29301 205107 879030 29752 101.54% 187747 779907 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
344 112223 343
+ 0
327
112047 0 0 99.84
+0
59 / 59
+0
349 / 332
125817.00
+0.00 / +0.00
110553.14
87.87% 2 2 4 961 686 275 57 1 56
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Not Verified Verified 0 2 Not Verified Verified 0 2 Verification Remarks Minutes of Meeting 103 0 12 0 2 10 8 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 20 20 6540 45780 196200 3621 55.37% 17282 116403 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
24195.69
89.94% 150 113 37 0 0 0
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 75 OHT Required
  • 72 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 51 No. of Schemes
  • 100 No. of Villages
  • Scheme Wise Category C
  • 20 No. of Schemes
  • 31 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 53 No. of OHT in O&M Schemes
  • 11094 Water Demand(M3)
  • 5670.00 Water Supply (M3)
  • 52 Agreement Done Scheme
  • 102 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 3 7 Not Verified Verified 3 7 Verification Remarks Minutes of Meeting 156 0 15 0 1 14 2 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 6 4452 31164 133560 6336 142.32% 40355 176785 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 155 144 11 0 0 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 153 0 12 0 0 12 9 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 12 9559 66913 286770 5814 60.82% 23628 151319 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 145 130 15 6 0 6
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 0 Verified Verified 6 0 Verification Remarks Minutes of Meeting 199 0 25 0 5 20 12 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 11172 78204 335160 4777 42.76% 45630 227066 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
203
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
39537.71
97.33% Yes 263 254 9 0 0 0
  • 2 FHTC
  • 3 HGJ
  • 12 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 9 7 2 3 9 7 -- 508 0 52 0 6 46 23 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 26 24 25183 176281 755490 16927 67.22% 109613 555170 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
430
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
76653.60
94% 563 528 35 6 0 6
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 25 Verified Verified 9 25 Verification Remarks Minutes of Meeting 38 0 30 0 0 30 1 1 0 + 12 + 0 + 0 + 1 = 13 0 + 35 + 0 + 0 + 1 = 36 26 23 11587 81109 347610 11243 97.03% 79352 335382 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29161.44
88.83% Yes Yes 180 128 52 0 0 0
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 255 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 6 13 Verified Verified 6 12 Verification Remarks Minutes of Meeting 47 0 25 0 0 25 2 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 31 31 11812 82684 354360 12380 104.81% 81342 340646 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
255 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
255 / 255
33415.00
+0.00 / +0.00
29965.10
89.68% Yes Yes 268 217 51 0 0 0
  • 1 HGJ
  • 4 HGJ CERT
  • 190 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 414 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 38 2 2 15 37 -- 85 0 55 0 0 55 3 2 0 + 12 + 0 + 0 + 1 = 13 0 + 35 + 0 + 0 + 1 = 36 57 54 23399 163793 701970 23623 100.96% 160694 676028 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
414 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
414 / 414
66243.00
+0.00
59126.54
89% 448 345 103 0 0 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 297 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 7 Verified Verified 1 7 Verification Remarks Minutes of Meeting 290 0 102 1 3 98 32 10 0 + 1 + 0 + 1 + 0 = 2 0 + 1 + 0 + 1 + 0 = 2 75 74 24942 174594 748260 18114 72.62% 134913 596362 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
5783.01
88.12% 839 680 159 20 0 20
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 65 0 5 0 5 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 9 0 0 0 0 0% 0 0 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 61
+ 1
59
9111 0 0 98.18
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5588.21
86.00% 45 27 18 1 0 1
  • 2 COV
  • 169 FHTC
  • 2 HGJ
  • 4 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 211 0 48 0 11 37 12 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 75 70 13364 93548 400920 15369 115.00% 111910 498177 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12143.57
93.53% 428 250 178 17 0 17
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1590 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 6 7 25 54 5 7 25 54 -- 1262 0 274 1 27 246 78 37 0 + 13 + 0 + 1 + 1 = 15 0 + 36 + 0 + 1 + 1 = 38 262 251 93429 654003 2802870 77655 83.12% 534412 2442140 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1599
+ 1
1568
310272 0 0 99.75
+0
200 / 200
+0
1603 / 1569
200307.00
+0.00 / +0.00
183490.62
91.60% 2 0 0 2473 1943 530 44 0 44
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
26 | 27
25 0 / 0 30 / 0 22 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 384 0 27 3 11 13 12 0 0 + 5 + 0 + 6 + 0 = 11 0 + 29 + 0 + 15 + 0 = 44 48 46 10407 72849 312210 1063 10.21% 2824 13246 16
+0
16
+0
16
14 3904.00
+0.00
3893.00
179 66179 149
+ 0
69
63547 0 0 96.02
+0
14 / 14
+0
145 / 81
74794.00
+0.00 / +0.00
56485.42
75.52% 257 170 87 39 0 39
  • 11 D.System
  • 26 COV
  • 2632 FHTC
  • 30 HGJ
  • 110 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17524 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 41 No. of Villages
  • Village Wise Category C
  • 41 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 0 Schemes Sent to O&M
  • 0 No. of OHT in O&M Schemes
  • 0 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 12 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14554.39
61.24% 31 19 12 13 0 13
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 18 10 8 0 0 0
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 221 0 15 0 0 15 0 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 10 6425 44975 192750 9679 150.65% 58075 238230 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
23
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12038.37
90.90% 78 50 28 7 0 7
  • 6 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 11 11 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
6990.66
58.89% 8 5 3 1 0 1
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 1 1 0 0 -- 221 0 43 28 0 15 0 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 26 25 6425 44975 192750 9679 150.65% 58075 238230 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
23
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
42741.57
70% 135 84 51 21 0 21
NCC Ltd.


8338933 Patwadh GOV 658 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
46 0 / 0 47 / 0 0 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 352 0 55 0 52 3 1 0 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 62 59 1400 9800 42000 985 70.36% 7775 21282 15
+0
15
+0
15
12 3885.16
+0.00
3468.02
658 103482 203
+ 0
22
97770 0 0 94.48
+0
16 / 6
+0
374 / 45
99181.00
+0.00 / +0.00
69197.25
69.77% 431 356 75 112 23 89
  • 417 D.System
  • 287 COV
  • 10 Electricity
  • 5712 FHTC
  • 455 HGJ
  • 636 HGJ CERT
  • 654 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Oct-2025
Comissioning
30/10/2025
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Oct-2025 D.System
  • 30-Oct-2025 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 209 0 12 0 11 1 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 2 150 1050 4500 8 5.33% 3943 68516 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10327.61
86.50% Yes 25 14 11 1 0 1
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 103 0 8 0 5 3 2 1 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 5 5 886 6202 26580 553 62.42% 1867 12948 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 21 14 7 5 1 4
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Verified Verified 1 0 Verified Verified 1 0 Verification Remarks Minutes of Meeting 112 0 9 0 4 5 0 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 16 2738 19166 82140 4064 148.43% 19106 90950 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 76
12858.00
+0.00 / +0.00
11273.82
87.68% 73 50 23 13 1 12
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 206 0 0 0 0 0 0 0 0 33 33 100%
+0
180
87 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
2 0 0 1 1
  +0
7 | 7
7 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 146 0 9 2 7 0 0 0 0 + 0 + 0 + 5 + 3 = 8 0 + 0 + 0 + 15 + 3 = 18 29 28 0 0 0 0 0% 5835 97186 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
206 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
197 / 168
23145.00
+0.00 / +0.00
18389.59
79.45% 250 201 49 22 0 22
  • 2 OHT
  • 2 D.System
  • 9 COV
  • 105 FHTC
  • 23 HGJ
  • 73 HGJ CERT
  • 150 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 44 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
95 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 139 0 10 0 6 4 2 1 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 9 9 2570 17990 77100 2285 88.91% 3526 5451 6
+0
6
+0
6
6 918.46
+0.00
918.46
44 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 42
18231.00
+0.00 / +0.00
15740.88
86.34% 52 37 15 5 0 5
  • 8 FHTC
  • 1 HGJ CERT
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
95.84
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 0
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 3 2 1 0 0 0
  • 1 OHT
  • 6 D.System
  • 3 COV
  • 2 Electricity
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 380 4 0 0 0 0 0 0 0 169 168 99% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
2 0 0 2 1
  +0
36 | 36
34 0 / 0 1 / 0 30 -- -- -- 2 2 1 2 2 2 1 2 -- 500 0 39 5 22 12 4 5 0 + 0 + 0 + 7 + 3 = 10 0 + 0 + 0 + 19 + 3 = 22 60 59 6194 43358 185820 6902 111.43% 30334 206535 20
+0
20
+0
20
20 4824.34
+0.00
4812.95
380 58561 353
+ 0
277
57781 0 0 99
+0
25 / 23
+0
366 / 323
66677.00
+0.00
56324.55
84% 399 304 95 45 2 43
Total Sonbhadra 1305 5 6 2 2 2 41 41 0 0 546 541 99%
+0
1214
93.03 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
5 5 0 2 1
  +0
159 | 160
143 0 / 0 108 / 0 72 -- -- -- 3 3 1 2 3 3 1 2 -- 1666 0 176 36 96 44 18 18 0 + 5 + 0 + 17 + 3 = 25 0 + 29 + 0 + 40 + 3 = 72 199 191 24578 172046 737340 18637 75.83% 102950 547809 77
+0
75
+0
75
70 15534.95
+0.00
15081.61
1305 288480 764
+ 0
402
270247 0 0 93.68
+0
83 / 71
+0
930 / 493
313955.00
+0.00 / +0.00
235076.40
74.88% 0 1 0 1247 928 319 215 24 191
Project Completion Plan