Physical Progress(Phase 1) District Wise

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Water supply Issues OHT 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Water supply Issues Village
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 61 OHT
  • 2 CWR
  • 457.49 D.System
  • 557 Comissioning
  • 17 Electricity
  • 23751 FHTC
  • 1186 HGJ
  • 2299 HGJ CERT
  • 6168 HOV
  • Scheme Wise Category A
  • 720 No. of Schemes
  • 1197 No. of Villages
  • Scheme Wise Category B
  • 3378 No. of Schemes
  • 6188 No. of Villages
  • Scheme Wise Category C
  • 1540 No. of Schemes
  • 2449 No. of Villages
  • Scheme Wise Total
  • 5638 Total No. of Schemes
  • 9834 Total No. of Villages
  • Village Wise Category A
  • 1082 No. of Villages
  • Village Wise Category B
  • 5600 No. of Villages
  • Village Wise Category C
  • 3089 No. of Villages
  • Village Wise Total
  • 9771 Total No. of Villages
  • 4622 Agreement Done Scheme
  • 8301 Agreement Done Village
Total 6560 45 49 39 36 36 3137 3090 0 0 9283 8968 97%
+0
5640
86 98.99 61 165 / 15 100.00 62 358 / 16
+0
550 / 550
213 / 83 1697
+0
1784
839 6 1 8 133
  +0
1557 | 1636
1534 3 / 0 1309 / 104 1136 -- -- -- 41 41 139 431 37 39 130 409 -- 7051 664 1697 544 282 871 265 140 6 + 46 + 16 + 35 + 18 = 121 6 + 132 + 19 + 82 + 21 = 260 320195 2241365 9605850 288933 90.24% 1938947 7877956 455
+0
412
+0
453
445 58095.78
+0.00
57638.29
6560 1690431 5373
+ 13
4260
1666684 0 0 98.60
+0
900 / 883
+0
5969 / 4835
1624724.00
+0.00 / +0.00
1313309.03
80.83% 3 6 7 11352 8124 3228 538 68 470
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
327
96 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Verified Verified 5 56 Verified Verified 5 56 Verification Remarks Minutes of Meeting 380 189 116 0 7 109 19 0 2 + 18 + 0 + 1 + 0 = 21 2 + 21 + 0 + 1 + 0 = 24 38990 272930 1169700 33990 87.18% 241403 834800 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 336
+ 8
240
127865 0 0 99.98
+0
41 / 41
+0
342 / 335
156314.00
+0.00 / +0.00
132067.98
84.49% 867 608 259 60 0 60
  • 24 FHTC
  • 6 HGJ
  • 102 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54657 FHTC Given
  • 99 FHTC(%)
  • 68 Balance FHTC
  • 89 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 32 No. of Schemes
  • 53 No. of Villages
  • Scheme Wise Category B
  • 18 No. of Schemes
  • 43 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 43 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 51 Total No. of Schemes
  • 97 Total No. of Villages
  • 93 Total No. of OHT
  • 51 Schemes Sent to O&M
  • 93 No. of OHT in O&M Schemes
  • 28153 Water Demand(M3)
  • 28089.79 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 578 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Off Verified Verified 12 70 Verified Verified 12 70 Verification Remarks Minutes of Meeting 191 162 80 0 1 79 12 11 0 + 2 + 0 + 1 + 0 = 3 0 + 2 + 0 + 1 + 0 = 3 27684 193788 830520 26148 94.45% 189393 768998 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
81825.54
87.77% 1397 1127 270 32 0 32
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 202 0 0 1271 1254 99%
+0
527
96.88 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 17 126 2 2 17 126 -- 571 351 196 0 8 188 31 11 2 + 20 + 0 + 2 + 0 = 24 2 + 23 + 0 + 2 + 0 = 27 66674 466718 2000220 60138 90.20% 430796 1603798 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 538
+ 8
441
210131 0 0 99.99
+0
75 / 75
+0
544 / 537
249536.00
+0.00 / +0.00
213893.52
85.72% 0 0 0 2264 1735 529 92 0 92
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 72 58 81%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 1 1 1 0
  +0
25 | 25
24 3 / 0 4 / 0 3 Integrated Verified Verified 0 9 Verified Verified 0 9 Verification Remarks Minutes of Meeting 164 0 28 7 9 12 3 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2440 17080 73200 3388 138.85% 14426 83137 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 57
30332.00
+0.00 / +0.00
20318.72
66.99% 106 81 25 14 1 13
  • 3 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 70 OHT Required
  • 70 OHT Completed
  • Scheme Wise Category A
  • 42 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 65 No. of Villages
  • Village Wise Category B
  • 32 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 46 Total No. of Schemes
  • 97 Total No. of Villages
  • 74 Total No. of OHT
  • 42 Schemes Sent to O&M
  • 70 No. of OHT in O&M Schemes
  • 13076 Water Demand(M3)
  • 15352.02 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 51 50 98%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 10 Verified Verified 3 10 Verification Remarks Minutes of Meeting 201 0 17 0 6 11 9 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2471 17297 74130 356 14.41% 11093 57208 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
54
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20347.62
95.26% 98 69 29 7 0 7
  • 8 D.System
  • 5 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 287 236 82%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 4
  +0
87 | 87
69 0 / 0 29 / 0 4 Integrated Off Not Verified Not Verified 5 0 Not Verified Not Verified 5 0 Verification Remarks Minutes of Meeting 360 0 91 7 70 14 14 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 4773 33411 143190 525 11.00% 525 525 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 1
63
86114 0 0 99.95
+0
21 / 21
+0
233 / 152
95975.00
+0.00 / +0.00
65930.69
68.70% 397 274 123 38 1 37
  • 4 OHT
  • 205 D.System
  • 51 COV
  • 43 FHTC
  • 2 HGJ
  • 223 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 30-Sep-2025 OHT
  • 30-Jun-2024 CWR
  • 31-Aug-2025 D.System
  • 31-Jul-2025 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 338 286 85% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 4
  +0
104 | 104
86 0 / 0 51 / 0 15 -- -- -- 1 1 10 10 1 1 8 10 -- 561 0 108 7 76 25 23 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 7244 50708 217320 881 12.16% 11618 57733 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 1
117
98039 0 0 100
+0
28 / 28
+0
292 / 211
117334.00
+0.00
86278.31
74% 495 343 152 45 1 44
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 408 343 84%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 1 1 1 4
  +0
129 | 129
110 3 / 0 55 / 0 18 -- -- -- 2 2 10 19 2 2 8 19 -- 725 0 136 14 85 37 26 1 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 9685 67795 290550 4269 44.08% 26044 140870 37
+0
37
+0
37
37 4510.90
+0.00
4254.41
414 117652 412
+ 1
161
117609 0 0 99.96
+0
41 / 41
+0
357 / 268
147666.00
+0.00 / +0.00
106597.03
72.19% 0 0 0 601 424 177 59 2 57
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 7 Verified Verified 0 7 Verification Remarks Minutes of Meeting 105 0 130 120 6 4 3 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 852 5964 25560 558 65.49% 4367 25011 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25098.31
92.61% Yes 568 411 157 34 5 29
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 137 Villages
  • 76468 Households
  • 0 Last Week FHTC Given
  • 76449 FHTC Given
  • 99 FHTC(%)
  • 19 Balance FHTC
  • 134 HGJ
  • 126 HGJ Certified
  • 91.97 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 55 Handed Over Initiated/Approved On Portal
  • 60.58 Handed Over %
  • 39 OHT Required
  • 39 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 21003.53 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 134 129 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 4 3 Verified Verified 4 3 Verification Remarks Minutes of Meeting 194 0 46 0 30 16 7 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4214 29498 126420 2709 64.29% 13948 35869 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 48335 134
+ 0
127
48335 0 0 100.00
+0
10 / 10
+0
131 / 130
39878.00
+0.00 / +0.00
35649.70
89.40% 570 385 185 26 1 25
  • 7 HGJ CERT
  • 130 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 327 2 2 2 2 2 327 320 0 0 859 857 100%
+0
320
97.86 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 4 10 2 2 4 10 -- 299 0 176 120 36 20 10 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5066 35462 151980 3267 64.49% 18315 60880 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
327 108010 327
+ 0
318
108010 0 0 100
+0
83 / 83
+0
324 / 323
66979.00
+0.00 / +0.00
60748.01
90.70% 0 1 0 1138 783 355 60 6 54
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
190 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 5
+0
5
+0
5
4 2511.00
+0.00
2506.60
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 126
+0
505 / 188
52161.00
+0.00 / +0.00
46913.50
89.94% 473 293 180 33 1 32
  • 30 OHT
  • 4 D.System
  • 10 COV
  • 3 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 53 HGJ Certified
  • 86.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 34 OHT Required
  • 34 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 148 122 82%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
14 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.30
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
78 / 7
20745.00
+0.00 / +0.00
4683.15
22.57% 62 32 30 7 0 7
  • 5 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 142 121 85%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
11 0 0 0 1
  +0
9 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 6
+0
6
+0
6
5 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 5
13157.00
+0.00 / +0.00
2905.62
22.08% 26 17 9 3 0 3
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2025
Comissioning
0
  • 30-Sep-2025 Intake
  • 30-Sep-2025 WTP
  • 30-Sep-2025 T/W
  • 30-Sep-2025 OHT
  • 30-Sep-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
297 0 0 5 26
  +0
216 | 270
204 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 18
+0
18
+0
18
16 3431.00
+0.00
3425.15
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 141
+0
644 / 200
86063.00
+0.00
54502.27
63% 561 342 219 43 1 42
GVPR


8135513 Sala GOV 197 0 0 0 0 0 0 0 0 496 490 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Verified Verified 4 1 Verified Verified 3 1 Verification Remarks Minutes of Meeting 217 0 56 29 0 27 5 21 0 + 0 + 0 + 1 + 5 = 6 0 + 0 + 0 + 1 + 5 = 6 8159 57113 244770 12746 156.22% 88437 296913 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 176
+ 0
122
43076 0 0 99.95
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
38461.26
76.01% 166 97 69 22 0 22
  • 22 FHTC
  • 21 HGJ
  • 75 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 0 3 0 0 0 0 0 0 0 1709 1595 93%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
353 0 0 5 26
  +0
272 | 326
260 0 / 0 169 / 0 24 -- -- -- 1 1 4 1 1 1 3 1 -- 217 0 357 330 0 27 5 21 0 + 0 + 0 + 1 + 5 = 6 0 + 0 + 0 + 1 + 5 = 6 8159 57113 244770 12746 156.22% 88437 296913 29
+0
29
+0
29
27 5146.00
+0.00
5140.15
857 184499 392
+ 0
216
180645 0 0 97.91
+0
156 / 153
+0
841 / 397
136662.00
+0.00 / +0.00
92963.53
68.02% 0 0 0 717 433 284 65 1 64
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 192 163 85%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Not Integrated Off Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 54 0 13 13 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
894.94
87 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
82 / 55
29730.00
+0.00 / +0.00
19944.33
67.08% 175 82 93 26 1 25
  • 5 D.System
  • 5 COV
  • 70 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 125 Villages
  • 49735 Households
  • 0 Last Week FHTC Given
  • 48218 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 106 HGJ
  • 96 HGJ Certified
  • 76.80 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.40 Handed Over %
  • 15 OHT Required
  • 13 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 38 No. of Villages
  • Village Wise Category B
  • 64 No. of Villages
  • Village Wise Category C
  • 21 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 14971.71 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
782.23
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 10
+0
68 / 39
29676.00
+0.00 / +0.00
17935.36
60.44% 133 50 83 16 0 16
  • 4 D.System
  • 25 COV
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
27
25 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
13 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 11
+0
11
+0
11
10 868.26
+0.00
863.85
106 27423 27
+ 0
1
27171 0 0 99.08
+0
12 / 12
+0
56 / 19
29490.00
+0.00 / +0.00
15529.98
52.66% 85 50 35 20 2 18
  • 4 D.System
  • 50 COV
  • 252 FHTC
  • 79 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 531 454 85% 67 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
38 0 / 0 12 / 0 23 -- -- -- -- 54 0 40 40 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 28
+0
28
+0
28
27 2554.76
+0.00
2541.02
286 87119 127
+ 0
10
86633 0 0 99
+0
31 / 31
+0
206 / 113
88896.00
+0.00
53409.67
60% 393 182 211 62 3 59
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 71 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 9 8 Verification Remarks Minutes of Meeting 124 65 14 0 0 14 0 3 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 8491 59437 254730 10111 119.08% 66743 340567 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27190.73
96.49% Yes 223 185 38 18 16 2
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 64 98%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 46 30 5 0 0 5 0 3 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 1930 13510 57900 2835 146.89% 16908 60124 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6337.08
84.30% Yes 89 75 14 4 4 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 74 99%
+0
36
97 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 50 32 7 0 0 7 1 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3419 23933 102570 4607 134.75% 25289 121363 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11389.03
90.08% Yes 100 72 28 6 5 1
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 26 17 7 0 0 7 1 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3346 23422 100380 3899 116.53% 23959 95713 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
9463.11
85.74% Yes 49 45 4 8 8 0
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 99 69 14 0 2 12 0 3 1 + 2 + 0 + 0 + 1 = 4 1 + 2 + 0 + 0 + 1 = 4 7169 50183 215070 11899 165.98% 68760 308961 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26006.12
92.90% Yes 185 156 29 12 11 1
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 425 99% 160 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 221 148 33 0 2 31 2 13 1 + 2 + 1 + 0 + 1 = 5 1 + 2 + 1 + 0 + 1 = 5 15864 111048 475920 23240 146.50% 134916 586161 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
53195.34
90% 423 348 75 30 28 2
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 23 0 6 0 0 6 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4025 28175 120750 4645 115.40% 34953 152210 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8034.62
82.80% Yes 121 118 3 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 56 56 0 0 257 257 100%
+0
56
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+100
109
0 0 0 0 100
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Off Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 123 100 9 0 0 9 4 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4211 29477 126330 9 0.21% 29187 137584 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15726 56
+ 0
56
15726 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
11976.40
81.78% Yes 138 127 11 6 5 1
  • 1 HGJ
  • 1 HGJ CERT
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 611 7 7 7 7 7 325 320 0 0 1577 1497 95%
+0
383
62.68 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
202
0 0 0 0 100
  +0
102 | 102
100 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 32 62 -- 545 313 102 40 2 60 6 17 1 + 2 + 1 + 1 + 1 = 6 1 + 2 + 1 + 3 + 1 = 8 32592 228144 977760 38005 116.61% 265798 1216522 67
+0
53
+0
67
66 5890.10
+0.00
5876.00
611 201383 451
+ 0
322
200888 0 0 99.75
+0
117 / 117
+0
530 / 434
200615.00
+0.00 / +0.00
153806.76
76.67% 0 0 3 1298 960 338 121 56 65
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 59 59 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Off Verified Verified 5 12 Verified Verified 5 9 Verification Remarks Minutes of Meeting 132 0 13 0 0 13 7 0 0 + 0 + 2 + 0 + 0 = 2 0 + 0 + 3 + 0 + 0 = 3 4106 28742 123180 3684 89.72% 26269 109569 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 49
17608.00
+0.00 / +0.00
17282.02
98.15% Yes 76 62 14 6 0 6
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 13 OHT Required
  • 11 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 8442.56 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 89 88 99%
+0
60
98 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 4 8 Not Verified Verified 4 5 Verification Remarks Minutes of Meeting 110 0 17 0 1 16 7 4 0 + 0 + 5 + 0 + 0 = 5 0 + 0 + 5 + 0 + 0 = 5 6570 45990 197100 8374 127.46% 39376 147867 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 57
24598.00
+0.00 / +0.00
20239.18
82.28% 188 134 54 5 0 5
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 45 44 98%
+0
59
98 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 115 0 15 0 1 14 11 0 0 + 0 + 2 + 0 + 1 = 3 0 + 0 + 2 + 0 + 1 = 3 5296 37072 158880 2735 51.64% 20087 107526 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 51
23368.00
+0.00 / +0.00
21529.95
92.13% 96 49 47 11 0 11
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 0 0 0 0 0 0 0 30 28 93%
+0
55
95 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 4 Verified Verified 2 2 Verification Remarks Minutes of Meeting 91 0 11 0 0 11 5 2 0 + 0 + 3 + 0 + 0 = 3 0 + 0 + 4 + 0 + 0 = 4 2917 20419 87510 2449 83.96% 19858 82316 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 5
+0
58 / 57
15059.00
+0.00 / +0.00
12657.68
84.05% 62 46 16 7 0 7
  • 1 Electricity
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 10 9 90%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 60 0 4 0 0 4 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1696 11872 50880 2492 146.93% 18552 76249 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5103.02
85.38% 32 22 10 1 0 1
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 12 12 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 923 6461 27690 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 14
5996.00
+0.00 / +0.00
4307.07
71.83% 47 37 10 3 0 3
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 5 5 5 193 192 0 0 245 240 98% 245 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 16 31 3 4 16 23 -- 508 0 66 0 2 64 35 7 0 + 0 + 12 + 0 + 1 = 13 0 + 0 + 14 + 0 + 1 = 15 21508 150556 645240 19734 91.75% 124142 523527 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 36
+0
251 / 235
92606.00
+0.00
81118.92
88% 501 350 151 33 0 33
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 0 0 0 0 0 0 0 18 18 100%
+0
15
94 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 63 0 6 0 2 4 2 2 0 + 0 + 0 + 0 + 3 = 3 0 + 0 + 0 + 0 + 4 = 4 1009 7063 30270 734 72.75% 2312 4973 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
16 / 12
4615.00
+0.00 / +0.00
3439.95
74.54% 37 19 18 0 0 0
  • 1 HGJ
  • 1 HGJ CERT
  • 16 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 4 0 4 0 1 3 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1048 7336 31440 633 60.40% 8099 35537 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3505.52
75.98% Yes 21 19 2 2 0 2
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 0 0 0 0 0 0 0 0 37 27 73%
+0
4
17 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 63 0 8 0 6 2 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1068 7476 32040 494 46.25% 6130 21837 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
0
8735 0 0 100.00
+0
5 / 4
+0
22 / 18
8794.00
+0.00 / +0.00
7180.87
81.66% 34 16 18 2 0 2
  • 1 COV
  • 1 Electricity
  • 23 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 30 0 0 23 23 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 49 0 8 0 3 5 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1332 9324 39960 1632 122.52% 16852 69265 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
7608.96
86.11% Yes 20 11 9 6 1 5
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 0 0 0 0 0 0 0 37 36 97%
+0
31
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 29 0 12 0 0 12 5 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3126 21882 93780 2171 69.45% 21497 94228 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
31 / 31
9528.00
+0.00 / +0.00
8655.22
90.84% 122 89 33 4 0 4
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 45 45 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 1 4 Verified Verified 1 4 Verification Remarks Minutes of Meeting 22 0 4 0 0 4 0 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1875 13125 56250 2923 155.89% 19312 82054 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4285.91
71.35% 40 25 15 1 0 1
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 3 3 3 64 62 0 0 157 146 93% 99 500.00 3 / 0 500.00 2 / 0
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 4 6 24 4 4 6 24 -- 167 0 36 0 10 26 7 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8449 59143 253470 7853 92.95% 71890 302921 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
95
35931 0 0 100
+0
21 / 20
+0
117 / 113
37779.00
+0.00
31236.48
83% 237 160 77 15 1 14
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 44 0 0 93 93 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 6 Verified Not Verified 3 6 Verification Remarks Minutes of Meeting 83 0 7 0 1 6 0 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 3394 23758 101820 3434 101.18% 19535 64733 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 34
14171.00
+0.00 / +0.00
11945.21
84.29% 128 97 31 3 0 3
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 52 0 0 93 92 99%
+0
53
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 4 7 Verified Verified 4 5 Verification Remarks Minutes of Meeting 45 0 10 0 2 8 0 0 0 + 0 + 1 + 2 + 1 = 4 0 + 0 + 1 + 12 + 1 = 14 3554 24878 106620 3539 99.58% 26892 121331 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 40
13299.00
+0.00 / +0.00
10816.41
81.33% 180 135 45 10 0 10
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 37 0 0 90 89 99%
+0
44
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 6 14 Verified Verified 6 13 Verification Remarks Minutes of Meeting 61 0 15 0 0 15 5 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4600 32200 138000 5025 109.24% 30783 134727 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
14549.20
87.22% 103 79 24 10 1 9
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 133 0 0 276 274 99% 144 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 13 27 3 2 13 24 -- 189 0 32 0 3 29 5 3 0 + 0 + 1 + 5 + 1 = 7 0 + 0 + 1 + 23 + 1 = 25 11548 80836 346440 11998 103.90% 77210 320791 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 118
44151.00
+0.00
37310.82
85% 411 311 100 23 1 22
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 26 26 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 36 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1277 8939 38310 1326 103.84% 7960 32982 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3073.85
76.16% Yes 30 20 10 3 0 3
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 15 15 14 12 12 422 406 0 0 719 701 97%
+0
522
94.91 100.00 16 19 / 1 100.00 16 32 / 2
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 14 37 90 12 12 37 90 -- 963 0 148 0 17 131 49 20 0 + 0 + 13 + 5 + 5 = 23 0 + 0 + 15 + 23 + 6 = 44 43797 306579 1313910 41644 95.08% 283515 1185195 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
511
156973 0 0 100
+0
86 / 84
+0
548 / 497
183187.00
+0.00 / +0.00
156180.02
85.26% 0 2 0 1212 857 355 72 2 70
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
98 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 129 0 18 0 1 17 8 5 0 + 2 + 1 + 1 + 0 = 4 0 + 2 + 1 + 2 + 0 = 5 6060 42420 181800 8512 140.46% 46273 207639 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
61 / 61
27118.00
+0.00 / +0.00
25169.58
92.82% Yes Yes Yes 207 177 30 6 0 6
  • 1 HGJ
  • 1 HGJ CERT
  • 61 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 73 Villages
  • 26427 Households
  • 0 Last Week FHTC Given
  • 26360 FHTC Given
  • 99 FHTC(%)
  • 67 Balance FHTC
  • 69 HGJ
  • 63 HGJ Certified
  • 86.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 67.12 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 46 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 8548 Water Demand(M3)
  • 6723.13 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
96 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 4 21 Verified Verified 4 20 Verification Remarks Minutes of Meeting 136 0 32 0 0 32 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6637 46459 199110 7406 111.59% 46741 181404 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
78 / 78
23602.00
+0.00 / +0.00
22306.07
94.51% Yes Yes 152 79 73 11 0 11
  • 1 D.System
  • 3 HGJ
  • 3 HGJ CERT
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 5 27 Verified Verified 1 24 Verification Remarks Minutes of Meeting 379 0 40 0 5 35 17 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5814 40698 174420 3459 59.49% 37845 158682 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 77
26009.00
+0.00 / +0.00
24826.82
95.45% 139 83 56 14 1 13
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 9 48 2 2 5 44 -- 515 0 72 0 5 67 17 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12451 87157 373530 10865 87.26% 84586 340086 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
155 / 155
49611.00
+0.00
47132.89
95% 291 162 129 25 1 24
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 0 0 0 0 0 0 0 158 157 99%
+0
35
92 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 109 0 13 0 4 9 6 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2729 19103 81870 749 27.45% 5377 40194 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 11976 36
+ 0
35
11800 0 0 98.53
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13344.22
84.53% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 2 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 300 293 98%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 196 0 29 0 3 26 14 9 3 + 0 + 0 + 3 + 0 = 6 3 + 0 + 0 + 3 + 0 = 6 8509 59563 255270 8685 102.07% 49412 195044 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
81
30104 0 0 100.00
+0
9 / 9
+0
95 / 85
33301.00
+0.00 / +0.00
24906.45
74.79% Yes 358 111 247 2 0 2
  • 1 D.System
  • 14 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 344 5 5 4 3 3 212 211 0 0 1125 1115 99%
+0
337
97.97 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 15 76 5 5 11 76 -- 949 0 132 0 13 119 45 25 3 + 2 + 1 + 4 + 0 = 10 3 + 2 + 1 + 5 + 0 = 11 29749 208243 892470 28811 96.85% 185648 782963 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
344 112223 343
+ 0
327
112047 0 0 99.84
+0
59 / 59
+0
349 / 337
125817.00
+0.00 / +0.00
110553.14
87.87% 1 2 4 856 450 406 33 1 32
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Not Verified Verified 0 2 Not Verified Verified 0 2 Verification Remarks Minutes of Meeting 86 0 12 0 2 10 7 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6540 45780 196200 3779 57.78% 22553 100455 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
24195.69
89.94% 145 100 45 0 0 0
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 51 No. of Schemes
  • 100 No. of Villages
  • Scheme Wise Category C
  • 20 No. of Schemes
  • 31 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 2 Schemes Sent to O&M
  • 2 No. of OHT in O&M Schemes
  • 286 Water Demand(M3)
  • 5748.00 Water Supply (M3)
  • 52 Agreement Done Scheme
  • 102 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 3 0 Verified Verified 3 0 Verification Remarks Minutes of Meeting 125 0 15 0 0 15 2 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4720 33040 141600 6076 128.73% 36255 135156 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 141 128 13 0 0 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 169 0 12 0 0 12 6 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9559 66913 286770 8516 89.09% 16172 108014 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 126 107 19 0 0 0
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 186 0 25 0 0 25 15 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14505 101535 435150 7756 53.47% 53178 193317 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
203
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
39537.71
97.33% Yes 239 208 31 0 0 0
  • 2 FHTC
  • 3 HGJ
  • 12 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 3 0 3 3 3 0 -- 480 0 52 0 0 52 23 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 28784 201488 863520 22348 77.64% 105605 436487 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
430
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
76653.60
94% 506 443 63 0 0 0
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 25 Verified Verified 9 25 Verification Remarks Minutes of Meeting 18 0 30 0 0 30 0 0 0 + 8 + 0 + 0 + 1 = 9 0 + 29 + 0 + 0 + 1 = 30 11587 81109 347610 10858 93.71% 77698 336016 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29161.44
88.83% Yes Yes 165 111 54 0 0 0
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 255 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 11 Verified Verified 6 10 Verification Remarks Minutes of Meeting 22 0 25 0 0 25 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11812 82684 354360 11396 96.48% 77943 361229 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
255 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
255 / 255
33415.00
+0.00 / +0.00
29965.10
89.68% Yes Yes 264 199 65 0 0 0
  • 1 HGJ
  • 4 HGJ CERT
  • 190 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 414 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 36 2 2 15 35 -- 40 0 55 0 0 55 0 0 0 + 8 + 0 + 0 + 1 = 9 0 + 29 + 0 + 0 + 1 = 30 23399 163793 701970 22254 95.11% 155641 697245 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
414 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
414 / 414
66243.00
+0.00
59126.54
89% 429 310 119 0 0 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 297 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Not Verified 1 7 Not Verified Not Verified 0 7 Verification Remarks Minutes of Meeting 276 0 102 2 7 93 27 12 0 + 2 + 0 + 3 + 0 = 5 0 + 2 + 0 + 5 + 0 = 7 23863 167041 715890 21848 91.56% 141241 501633 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
5783.01
88.12% 792 565 227 19 0 19
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 63 0 5 0 5 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 61
+ 0
58
9111 0 0 98.18
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5588.21
86.00% 37 21 16 0 0 0
  • 2 COV
  • 169 FHTC
  • 2 HGJ
  • 5 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 221 0 48 0 10 38 13 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13163 92141 394890 14721 111.84% 107696 497127 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12143.57
93.53% 405 250 155 17 0 17
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1590 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 6 6 19 45 5 6 18 45 -- 1166 0 274 2 24 248 70 35 0 + 10 + 0 + 3 + 1 = 14 0 + 31 + 0 + 5 + 1 = 37 95750 670250 2872500 84950 88.72% 532736 2232947 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1599
+ 0
1567
310272 0 0 99.75
+0
200 / 200
+0
1603 / 1569
200307.00
+0.00 / +0.00
183490.62
91.60% 2 0 0 2314 1689 625 36 0 36
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 1
  +0
26 | 26
25 0 / 0 30 / 0 22 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 377 0 27 4 10 13 12 0 0 + 9 + 0 + 6 + 0 = 15 0 + 71 + 0 + 15 + 0 = 86 12082 84574 362460 255 2.11% 2413 8301 16
+0
16
+0
16
14 3904.00
+0.00
3893.00
179 66179 147
+ 1
65
63409 0 0 95.81
+0
14 / 14
+0
145 / 61
74794.00
+0.00 / +0.00
56485.42
75.52% 197 151 46 0 0 0
  • 1 OHT
  • 11 D.System
  • 26 COV
  • 2770 FHTC
  • 32 HGJ
  • 114 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
3 Nos New OHTs work as per Revised DPR.
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 31-Jan-2025 OHT
  • 30-May-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17524 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 1 OHT Required
  • 1 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 41 No. of Villages
  • Village Wise Category C
  • 41 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 0 Schemes Sent to O&M
  • 0 No. of OHT in O&M Schemes
  • 0 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 215 0 15 0 0 15 7 3 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 2 = 2 10056 70392 301680 7343 73.02% 43872 104616 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
23
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12038.37
90.90% 63 46 17 0 0 0
  • 6 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14554.39
61.24% 19 19 0 0 0 0
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 16 10 6 0 0 0
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 11 11 0 0 0 0 0 + 1 + 0 + 0 + 0 = 1 0 + 1 + 0 + 0 + 0 = 1 0 0 0 0 0% 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
6990.66
58.89% 6 5 1 0 0 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 0 0 0 0 0 0 0 0 -- 215 0 43 28 0 15 7 3 0 + 1 + 0 + 0 + 1 = 2 0 + 1 + 0 + 0 + 2 = 3 10056 70392 301680 7343 73.02% 43872 104616 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
23
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
42741.57
70% 104 80 24 0 0 0
NCC Ltd.


8338933 Patwadh GOV 658 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
1 0 0 0 1
  +0
54 | 54
46 0 / 0 47 / 0 0 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 359 0 55 1 52 2 0 1 0 + 0 + 0 + 6 + 0 = 6 0 + 0 + 0 + 9 + 0 = 9 148 1036 4440 269 181.76% 1370 6723 15
+0
15
+0
15
12 3885.16
+0.00
3457.69
658 103482 203
+ 3
21
97770 0 0 94.48
+0
16 / 6
+0
317 / 45
99181.00
+0.00 / +0.00
69197.25
69.77% 283 259 24 0 0 0
  • 1 OHT
  • 427 D.System
  • 344 COV
  • 10 Electricity
  • 5712 FHTC
  • 455 HGJ
  • 637 HGJ CERT
  • 654 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Sep-2025
Comissioning
30/09/2025
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Sep-2025 D.System
  • 30-Sep-2025 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 229 0 12 0 12 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 23110 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10327.61
86.50% Yes 21 14 7 0 0 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 81 0 8 0 6 2 2 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 792 5544 23760 4 0.51% 2879 20097 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 16 14 2 0 0 0
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Not Verified Verified 0 0 Not Verified Verified 0 0 Verification Remarks Minutes of Meeting 100 0 9 0 4 5 2 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2690 18830 80700 1903 70.74% 20121 90603 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 76
12858.00
+0.00 / +0.00
11273.82
87.68% 59 50 9 0 0 0
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 206 0 0 0 0 0 0 0 0 33 33 100%
+0
180
87 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
2 0 0 1 1
  +0
7 | 7
7 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 97 0 9 2 3 4 0 3 0 + 2 + 1 + 5 + 4 = 12 0 + 2 + 2 + 15 + 5 = 24 2954 20678 88620 5330 180.43% 34776 102191 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
206 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
197 / 168
23145.00
+0.00 / +0.00
18389.59
79.45% 226 187 39 0 0 0
  • 2 OHT
  • 2 D.System
  • 9 COV
  • 105 FHTC
  • 23 HGJ
  • 73 HGJ CERT
  • 150 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 44 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
95 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 158 0 10 0 10 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 0 0 0 0 0% 2226 2226 6
+0
6
+0
6
6 918.46
+0.00
918.46
44 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 42
18231.00
+0.00 / +0.00
15740.88
86.34% 43 37 6 0 0 0
  • 8 FHTC
  • 1 HGJ CERT
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
95.84
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 0
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 3 2 1 0 0 0
  • 1 OHT
  • 6 D.System
  • 3 COV
  • 2 Electricity
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 380 4 0 0 0 0 0 0 0 169 168 99% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
2 0 0 2 1
  +0
36 | 36
34 0 / 0 1 / 0 30 -- -- -- 1 2 0 2 1 2 0 2 -- 436 0 39 5 23 11 4 4 0 + 2 + 1 + 7 + 4 = 14 0 + 2 + 2 + 19 + 5 = 28 6436 45052 193080 7237 112.45% 60002 215117 20
+0
20
+0
20
20 4824.34
+0.00
4812.95
380 58561 353
+ 0
277
57781 0 0 99
+0
25 / 23
+0
366 / 323
66677.00
+0.00
56324.55
84% 347 290 57 0 0 0
Total Sonbhadra 1305 5 6 2 2 2 41 41 0 0 546 541 99%
+0
1214
93.03 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
6 5 0 2 3
  +0
158 | 158
143 0 / 0 108 / 0 72 -- -- -- 1 2 0 2 1 2 0 2 -- 1616 0 176 38 97 41 23 8 0 + 12 + 1 + 19 + 5 = 37 0 + 74 + 2 + 43 + 7 = 126 28723 201061 861690 15103 52.58% 107658 357868 77
+0
75
+0
75
70 15534.95
+0.00
15071.28
1305 288480 762
+ 4
397
270109 0 0 93.63
+0
83 / 71
+0
873 / 473
313955.00
+0.00 / +0.00
235076.40
74.88% 0 1 0 952 793 159 0 0 0
Project Completion Plan

Minutes of Meeting Date -