1
Kanpur Dehat
GVPR
20065049
ASAI
3
7
3311
2023
2038
2053
18-Jan-2024
03-Dec-2023
17-Apr-2024
18-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
2
Shahjahanpur
NCC Ltd.
20015926
Bajpur Kumarikha
1
1
1820
2022
2037
2052
31-Dec-2024
29-Jul-2024
28-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
3
Kanpur Dehat
GVPR
20065061
Balai Bujurg
1
2
2361
2023
2038
2053
18-Jan-2024
31-Dec-2023
09-Apr-2024
10-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and Some road restoration and Leakage found Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
4
Shahjahanpur
NCC Ltd.
20019664
Bareng
1
1
2330
2022
2037
2052
20-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of BARENG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bareng scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
5
Ambedkar Nagar
Vindhya-GAJA (JV)
20062640
DEVRIYA PANDIT Water supply scheme
4
8
4280
2023
2038
2053
19-Jan-2024
15-Dec-2024
17-May-2025
18-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
6
Moradabad
LC INFRA
20015915
Fatehpur Salawatnagar village water supply scheme
1
1
2440
2022
2037
2052
09-Feb-2023
05-Aug-2024
04-Nov-2024
05-Nov-2024
Approved
Ok
Pending
View
7
Kanpur Dehat
GVPR
20065111
Gaijumau
1
6
2957
2023
2038
2053
18-Jan-2024
16-Nov-2023
31-Mar-2024
01-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
8
Etawah
Indian Hume Pipe
20026316
Ikaghara PWS
1
3
1900
2022
2037
2052
22-Sep-2023
26-Feb-2024
07-Jul-2024
08-Apr-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
9
Moradabad
LC INFRA
20013910
Khadana village water supply scheme
1
2
6880
2022
2037
2052
02-Nov-2023
05-Aug-2024
03-Nov-2024
04-Nov-2024
Approved
Ok
Pending
View
10
Moradabad
LC INFRA
20015141
Khawajpur Dhantla village water supply scheme
1
2
3642
2022
2037
2052
31-Dec-2024
24-Oct-2024
06-Jan-2025
07-Jan-2025
Approved
Ok
Pending
View
11
Shahjahanpur
NCC Ltd.
20014702
Majhila
1
1
4190
2022
2037
2052
31-Dec-2024
20-Dec-2023
20-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Majhila scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Majhila scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
12
Etawah
Indian Hume Pipe
20026098
Muraitha PWS
1
3
2200
2022
2037
2052
22-Sep-2023
25-Oct-2023
20-May-2023
21-May-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
13
Etawah
Indian Hume Pipe
20026330
Nagaria Bujurg PWS
1
2
1740
2022
2037
2052
22-Sep-2023
15-Dec-2023
16-Apr-2024
17-Apr-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
14
Kanpur Dehat
GVPR
20053409
Nonari Bujurg
1
2
3842
2023
2038
2053
18-Nov-2023
24-Nov-2023
08-Apr-2024
09-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
15
Kanpur Dehat
GVPR
20053335
Paharipur
1
6
3833
2023
2038
2053
18-Nov-2023
16-Oct-2023
29-Feb-2024
01-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
16
Moradabad
LC INFRA
20011095
Rustampur Khas Village water supply scheme
1
3
4550
2022
2037
2052
08-Feb-2024
27-Mar-2024
25-Jun-2024
26-Jun-2024
Approved
Ok
Pending
View
17
Kanpur Dehat
GVPR
20025294
Sunasi
1
8
4981
2023
2038
2053
06-Sep-2023
02-Nov-2023
17-Mar-2024
18-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
18
Ambedkar Nagar
Vindhya-GAJA (JV)
20019804
Aama & Kardaspur
2
6
2230
2023
2038
2053
03-Aug-2023
20-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
19
Ambedkar Nagar
Vindhya-GAJA (JV)
20062455
AAMI WSS
2
3
2630
2023
2038
2053
17-Jan-2024
15-Jun-2025
12-Oct-2025
13-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
20
Sultanpur
UNIVERSAL MEP
20066908
AARDIH & BAHALOLPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
4
11
4450
2023
2038
2053
12-Jan-2024
12-Jan-2024
26-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
21
Meerut
Power Mech Projects Ltd
20016936
AASSAA
1
1
3815
2021
2037
2052
31-Dec-2024
05-Feb-2023
25-Jun-2023
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
22
Bijnor
LC INFRA
20087642
Abdullapur Dahana water supply scheme
1
1
2850
2022
2037
2052
13-Mar-2023
15-Dec-2024
15-Dec-2024
16-Dec-2024
Approved
Every thing completed.
Approved
all document complete
View
23
Bijnor
LC INFRA
20011835
Abdulpur Munna Water Supply Scheme
1
1
2647
2022
2037
2052
09-Feb-2022
08-Aug-2024
08-Aug-2024
09-Aug-2024
Approved
Every thing completed.
Approved
all document complete
View
24
Farrukhabad
Vindhya-GAJA (JV)
20092689
ACHARIYA BAKARPUR MVS
3
5
2236
2023
2038
2053
31-Mar-2025
08-Oct-2024
01-Feb-2025
02-Feb-2025
Approved
OK
Approved
ok
View
25
Ambedkar Nagar
Vindhya-GAJA (JV)
20019914
Adhanpur
1
10
5390
2023
2038
2053
03-Aug-2023
20-Dec-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
26
Kanpur Dehat
Indian Hume Pipe
20070121
afasariya
1
2
4255
2022
2037
2052
04-Mar-2023
31-Dec-2024
23-Jun-2023
24-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
27
Ghaziabad
LC INFRA
20100525
AFJALNAGAR SITI VILLAGE WATER SUPPLY SCHEME
1
1
348
2022
2037
2052
25-May-2023
30-Sep-0202
01-Jan-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
28
Meerut
Power Mech Projects Ltd
20011230
AFZALPUR PAWATI
1
1
3482
2022
2037
2052
31-Dec-2024
07-May-2024
27-Sep-2024
14-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
29
Ayodhya
UNIVERSAL MEP
20098445
Agethua Gram Panchayat Water Supply Scheme
1
4
1460
2023
2038
2053
21-Jun-2024
12-Jun-2024
12-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
30
Auraiya
Indian Hume Pipe
20014495
AGHARA PWS
2
6
3900
2022
2037
2052
08-May-2023
19-Dec-2022
25-Mar-2023
26-Mar-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
31
Kannauj
GVPR
20100926
AGOUS GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
7
7444
2023
2038
2053
14-Nov-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
32
Fatehpur
Power Mech Projects Ltd
20097449
AHINDA
1
2
1950
2023
2038
2053
18-Mar-2025
30-Jun-2025
07-Dec-2024
08-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(08.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
33
Meerut
Power Mech Projects Ltd
20076648
AHMADPUR URF DANDOOPUR
1
1
2334
2023
2038
2053
31-Dec-2024
13-Sep-2024
03-Feb-2025
04-Feb-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
34
Meerut
Power Mech Projects Ltd
20010897
AHMADPURI URF AMANPURI
1
1
2364
2022
2037
2052
31-Dec-2024
11-Feb-2023
30-Jun-2023
31-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
35
Farrukhabad
Vindhya-GAJA (JV)
20091795
AHMILAPUR MVS
3
3
2767
2023
2038
2053
31-Mar-2025
01-Nov-2024
01-Nov-2024
12-May-2025
Approved
Ok..
Approved
OK
View
36
Ayodhya
UNIVERSAL MEP
20029752
AIHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
9
7150
2023
2038
2053
12-Oct-2023
18-Feb-2024
18-Feb-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
37
Rampur
SPML Infra
8362298
AIMI W/S SCHEME
1
1
3160
2022
2037
2052
27-Mar-2023
23-Aug-2023
25-Nov-2023
26-Nov-2023
Approved
Approved
Pending
View
38
Ambedkar Nagar
Vindhya-GAJA (JV)
20026068
AINWA WATER SUPPLY SCHEME
1
3
3600
2023
2038
2053
28-Sep-2023
28-Sep-2024
18-Feb-2025
19-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
39
Kannauj
GVPR
20077070
AIRHO GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3409
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
40
Ayodhya
UNIVERSAL MEP
20058888
AITHER & KHAIRI WSS
4
9
3050
2023
2038
2053
19-Mar-2024
10-Jun-2024
10-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
41
Ambedkar Nagar
Vindhya-GAJA (JV)
20019676
Ajanpara
1
12
5550
2023
2038
2053
03-Aug-2023
20-Jun-2025
09-Oct-2025
10-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
42
Bijnor
LC INFRA
20011272
Ajdev
1
1
1525
2022
2037
2052
10-Feb-2024
20-Dec-2024
18-Jun-2024
19-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
43
Fatehpur
Power Mech Projects Ltd
20097720
AJDUPUR
3
4
2190
2023
2038
2058
15-May-2023
14-May-2024
13-Oct-2024
13-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October(13.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
44
Auraiya
GVPR
20039031
Ajnapur pws
3
2
3391
2023
2038
2053
19-Nov-2022
18-Nov-2023
22-Dec-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
45
Hardoi
NCC Ltd.
8362203
AKABARPUR PASNAMAU
1
3
2662
2022
2037
2052
05-Mar-2023
20-Apr-2023
19-Jul-2023
24-Dec-2024
Approved
ok
Approved
OK
View
46
Kanpur Dehat
Indian Hume Pipe
20012613
Akana
1
5
3580
2022
2037
2052
15-Sep-2021
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
47
Shravasti
Larsen & Toubro Ltd
20015328
AKARA PWS
1
2
1849
2022
2037
2052
30-Sep-2023
30-Jun-2023
30-Sep-2023
01-Oct-2023
Approved
ok
Pending
View
48
Bijnor
Vindhya-GAJA (JV)
20100227
AKBARPUR DEVDAS WALA WSS
2
2
1911
2023
2038
2053
06-Jul-2023
02-Jan-2025
02-Jul-2025
03-Jul-2025
Approved
Every thing complete.
Approved
Complete
View
49
Meerut
Power Mech Projects Ltd
20020275
AKBARPUR GARHI
1
1
3531
2022
2037
2052
04-Feb-2024
23-Oct-2024
24-Jul-2024
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
50
Meerut
Power Mech Projects Ltd
20025394
Akbarpur sadat
1
1
5052
2022
2037
2052
31-Dec-2024
25-Jan-2023
13-Jun-2023
10-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
51
Bijnor
LC INFRA
20026241
Akbarpurasha Village Water Supply
1
1
4533
2022
2037
2052
18-Aug-2022
11-Jun-2024
11-Jun-2024
12-Jun-2024
Approved
Approve
Approved
Everything Complete.
View
52
Siddharth Nagar
Megha
20075261
AKDEGWA BHAVPUR GP WSS
3
11
3131
2022
2037
2052
12-Dec-2025
09-May-2025
09-May-2025
09-Dec-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
53
Ayodhya
UNIVERSAL MEP
20030018
AKHTIYAR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
4370
2023
2038
2053
12-Oct-2023
03-Sep-2024
03-Sep-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
54
Meerut
Power Mech Projects Ltd
20074084
AKHTYARPUR
1
1
1989
2022
2037
2052
31-Dec-2024
05-May-2024
21-Sep-2024
01-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
55
Ambedkar Nagar
Vindhya-GAJA (JV)
20026106
AKTHARA NARAYANPUR WATER SUPPLY SCHEME
3
3
2630
2023
2038
2053
28-Sep-2023
28-Sep-2024
08-Feb-2025
09-Feb-2025
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
56
Ayodhya
VSA
20061731
AKVARA WSS
1
4
2450
2023
2038
2053
21-Feb-2024
30-Mar-2025
02-Aug-2025
14-Aug-2025
Approved
FOUND OK
Pending
View
57
Sultanpur
UNIVERSAL MEP
20071527
ALAHADADPUR&LAKHANPUR GROUP OF PANCHAYAT WATER SUPPLY SCHEME
2
5
4730
2023
2038
2053
22-Mar-2024
22-Mar-2024
02-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
58
Meerut
Power Mech Projects Ltd
20031779
ALAMGIRPUR FARIDPUR & RAJPUR MOMIN
2
2
2398
2023
2038
2053
31-Dec-2024
22-Mar-2024
08-Aug-2024
02-Mar-2025
Approved
Recommended for Further Approval
Approved
approved
View
59
Meerut
Power Mech Projects Ltd
8362074
ALAMPUR BUZURG
1
1
2274
2022
2037
2052
07-Mar-2023
10-Dec-2022
28-Apr-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
60
Mainpuri
NCC Ltd.
8361881
ALAMPUR DEHAT VILLAGE WATER SUPPLY SCHEME
1
2
5662
2022
2037
2052
17-Apr-2023
15-Apr-2023
15-Jul-2023
22-Nov-2024
Approved
Recommended for approval.
Approved
ok
View
61
Kanpur Dehat
GVPR
20077590
ALAMPUR KHERA
2
6
2403
2023
2038
2053
17-Feb-2024
22-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
62
Hardoi
NCC Ltd.
20011375
ALAPUR
1
1
1390
2022
2037
2052
26-Jul-2023
17-Jan-2023
16-Apr-2023
24-Dec-2024
Approved
ok
Approved
OK
View
63
Kanpur Dehat
Indian Hume Pipe
20012654
Alapur
1
2
2820
2022
2037
2052
12-Oct-2022
20-Dec-2022
31-Mar-2023
01-Apr-2023
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
64
Gautam Buddha Nagar
LC INFRA
20013513
ALAUDDINNPUR URF DUDHERA VILLAGE WATER SUPPLY SCHEME
1
1
1832
2022
2037
2052
07-Feb-2024
01-Nov-2024
01-Aug-2024
01-Nov-2024
Approved
Project certificate is verified
Pending
View
65
Ambedkar Nagar
Vindhya-GAJA (JV)
20026069
ALAWALPUR WATER SUPPLY SCHEME
1
6
2340
2023
2038
2053
28-Sep-2023
30-Jun-2024
30-Sep-2023
01-Oct-2024
Approved
Checked and found OK
Approved
Scheme completed
View
66
Bijnor
LC INFRA
20068069
ALEALIPUR WATER SUPPLY SCHEME
3
3
2180
2022
2037
2052
23-Jan-2023
16-May-2025
16-May-2025
17-May-2025
Approved
Every thing complete.
Approved
Every thing is Completed.
View
67
Kannauj
GVPR
20050191
ALHANAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2688
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
68
Bijnor
LC INFRA
20011662
Alipur Damodar Village Water Supply Scheme
2
2
2454
2022
2037
2052
10-Feb-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
69
Muzaffarnagar
JMC - Lakshmi (JV)
20091823
Alipur Kalan
1
1
4113
2022
2037
2052
17-Aug-2023
02-Feb-2024
02-May-2024
03-May-2024
Approved
OK
Pending
View
70
Meerut
Power Mech Projects Ltd
20058121
ALIPUR MORNA & GAJROLA
2
2
4940
2023
2038
2053
31-Dec-2024
16-Aug-2024
05-Jan-2025
06-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
71
Auraiya
GVPR
20064155
Alipur PWS
2
5
4040
2023
2038
2053
06-Jan-2022
05-Dec-2024
04-Dec-2024
06-Dec-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
72
Kanpur Dehat
GVPR
20065029
ALIPUR RAMHAR
2
3
2980
2023
2038
2053
18-Jan-2024
20-Nov-2023
25-Feb-2024
26-Feb-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending ( Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
73
Kanpur Dehat
GVPR
20069947
Aliyapur
1
1
1840
2023
2038
2053
17-Feb-2024
20-Nov-2023
25-Feb-2024
26-Feb-2024
Approved
Forward for necessary action
Approved
All work of scheme found satisfactory
View
74
Bijnor
LC INFRA
20016956
ALLEHYARPUR WATER SUPPLY SCHEME
4
4
6300
2022
2037
2052
10-Feb-2024
12-Sep-2024
12-Mar-2025
13-Mar-2025
Approved
Every thing complete.
Approved
All document complete
View
75
Gautam Buddha Nagar
LC INFRA
20017811
ALLI AHAMADPUR URF GRAHI
1
1
1298
2022
2037
2052
07-Feb-2024
10-Jul-2025
10-Apr-2025
10-Jul-2025
Approved
Project certificate is verified
Pending
View
76
Fatehpur
Power Mech Projects Ltd
20095164
ALLIPUR
1
3
4630
2023
2038
2053
14-May-2024
30-Jun-2024
12-Jan-2024
12-Feb-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024).
Approved
Verified
View
77
Mau
GA INFRA-VPL
20102138
Allipur Water Supply Scheme
1
1
810
2023
2038
2053
20-Oct-2024
20-Oct-2024
20-Jan-2025
20-Jan-2025
Approved
Approved..
Approved
Approved
View
78
Kannauj
GVPR
20100937
ALMAPUR GAHLAUT GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1090
2023
2038
2053
14-Nov-2024
07-Apr-2024
10-Jul-2024
11-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
79
Bijnor
Vindhya-GAJA (JV)
20102309
AMANATPUR WSS
1
1
1831
2023
2038
2053
06-Jul-2023
09-Jul-2024
09-Jan-2025
10-Jan-2025
Approved
Every thing complete.
Approved
everything complete
View
80
Meerut
Power Mech Projects Ltd
20098079
AMANULLAPUR
1
1
2415
2023
2038
2053
31-Dec-2024
05-Sep-2024
24-Jan-2025
25-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
81
Gautam Buddha Nagar
LC INFRA
20017813
AMANULLAPUR URF MAHARA
1
1
4770
2022
2037
2052
20-Mar-2023
30-Apr-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
82
Mau
LC INFRA
20080869
AMARHAT VILLAGE WATER SUPPLY SCHEME
1
4
2069
2022
2037
2052
12-Aug-2024
10-Mar-2024
14-Jun-2024
18-Dec-2024
Approved
All Documents verified & Checked
Approved
Approve for O&M
View
83
Meerut
Power Mech Projects Ltd
20011307
AMARPUR MAZRA KHANDAWLI
1
1
2760
2022
2037
2052
31-Dec-2024
28-Feb-2024
20-Mar-2023
10-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
84
Meerut
Power Mech Projects Ltd
20082551
AMARSINGHPUR DAYALPUR
2
2
4920
2023
2038
2053
31-Dec-2024
05-Jun-2024
23-Oct-2024
24-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
85
Sultanpur
UNIVERSAL MEP
20064942
AMATHA GRAM PANCHAYAT WATER SUPPLY
2
5
3450
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
86
Ambedkar Nagar
Vindhya-GAJA (JV)
20026029
AMAULI MOHIDDINPUR WATER SUPPLY SCHEME
2
7
4910
2023
2038
2053
28-Sep-2024
12-Jun-2025
12-Jun-2025
13-Jun-2025
Approved
Scheme completed and ready for O&M
Approved
CHECKED AND FOUND OK
View
87
Kanpur Dehat
GVPR
20025235
AMAULI THAKURAN
2
4
3807
2023
2038
2053
26-Sep-2023
20-Nov-2023
05-Apr-2024
06-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
88
Fatehpur
Power Mech Projects Ltd
20097763
AMBI, HARI RAMPUR KAITHOLA
4
5
3840
2023
2038
2053
14-May-2024
30-Jun-2025
29-Apr-2025
30-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
89
Hardoi
NCC Ltd.
20012430
Amethiya Msinha
2
5
2680
2022
2037
2052
26-Jul-2023
28-Jun-2023
27-Sep-2023
25-Dec-2024
Approved
ok
Approved
OK
View
90
Meerut
Power Mech Projects Ltd
20020200
AMHERA ADIPUR
1
1
6489
2022
2037
2052
31-Dec-2024
15-Sep-2024
01-Feb-2025
20-Jun-2025
Approved
Recommended for further Approvals.
Approved
approved
View
91
Hardoi
NCC Ltd.
20012379
AMIRATA BADARAIYA
5
9
4420
2022
2037
2052
14-Jun-2023
17-Jan-2023
16-Apr-2023
24-Dec-2024
Approved
ok
Approved
OK
View
92
Banda
NCC Ltd.
8134904
Amlikaur GOV and Tubewell Scheme 28 Nos.
202
202
959697
2023
2038
2053
08-Nov-2022
28-Feb-2025
28-Feb-2025
03-Mar-2025
Approved
Checked & OK
Approved
as per TPI recommendation forwarded
View
93
Ayodhya
UNIVERSAL MEP
20030445
AMRAIGAON GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
6230
2023
2038
2053
12-Oct-2023
31-Jul-2024
31-Jul-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
94
Meerut
Power Mech Projects Ltd
20020202
AMROLI URF BARAGOAN
1
1
4936
2023
2038
2053
31-Dec-2024
09-Dec-2023
26-Apr-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
95
Fatehpur
Power Mech Projects Ltd
20097498
AND MAW
1
1
1640
2023
2038
2053
20-Sep-2024
16-Feb-2025
15-Feb-2025
16-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (14.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
96
Meerut
Power Mech Projects Ltd
20031774
ANDAWALI & BEHTA
2
2
2256
2022
2037
2052
31-Dec-2024
16-Mar-2024
02-Aug-2024
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
97
Fatehpur
Power Mech Projects Ltd
20106718
ANDMAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1750
2023
2033
2053
25-Sep-2024
30-Jun-2025
26-Jan-2025
27-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
98
Bijnor
LC INFRA
20038186
Anesnangli Gram Panchayat Water Supply
1
1
2371
2022
2037
2052
14-Nov-2022
30-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
Every thing complete.
Approved
Every thing is Completed.
View
99
Kanpur Dehat
Indian Hume Pipe
20012981
Angadpur
2
3
2640
2022
2037
2052
05-Feb-2022
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
100
Amethi
Vindhya-GAJA (JV)
20085692
ANI BAIJAL WATER SUPPLY SCHEME
1
5
3687
2023
2038
2053
29-Apr-2024
14-Aug-2024
15-Nov-2024
16-Feb-2025
Approved
Hardcopy submiited and all documents found okay..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
101
Auraiya
GVPR
20065266
Aniso PWS
3
5
2861
2023
2038
2053
12-Jan-2024
10-Jun-2024
09-Jun-2024
11-Jun-2024
Approved
Forwarded for further action.
Pending
View
102
Shahjahanpur
NCC Ltd.
8361712
ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2420
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Anwas Dugaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Anwas Digaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
103
Ambedkar Nagar
Vindhya-GAJA (JV)
20026109
AREEFPUR SARI WATER SUPPLY SCHEME
2
2
3150
2023
2038
2053
28-Sep-2023
14-Nov-2024
05-Dec-2024
06-Dec-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
104
Amethi
Vindhya-GAJA (JV)
20085680
ARGWAN & SAKRAWA WATER SUPPLY SCHEME
4
8
4459
2023
2038
2053
28-Apr-2024
20-Jun-2024
20-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
105
Kanpur Dehat
Indian Hume Pipe
20012955
Arhariyamau
2
2
2580
2022
2037
2052
05-Feb-2022
31-Dec-2023
31-Mar-2023
01-Apr-2023
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
106
Kannauj
GVPR
20066523
ARIFPUR & SARAI BHAMAL GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
3135
2023
2038
2053
16-Aug-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
107
Mau
LC INFRA
8359725
ARIYASO VILLAGE RURAL WATER SUPPLY SCHEME
2
3
2301
2022
2037
2052
26-Aug-2023
10-Dec-2024
09-Dec-2024
10-Dec-2024
Approved
Approved
Approved
Approved.
View
108
Sultanpur
UNIVERSAL MEP
20092610
ARWAL& CHAK SHIVPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
5010
2023
2038
2053
12-Jan-2024
31-Dec-2024
01-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
109
Etawah
Indian Hume Pipe
20024498
ASADPUR PWS
2
2
2900
2022
2037
2052
22-Sep-2023
19-Dec-2024
16-May-2024
17-May-2024
Approved
Forwarded to you for further action.
Approved
All work of scheme found satisfactory.
View
110
Kannauj
GVPR
20100936
ASAFPUR PATTI GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
753
2023
2038
2053
14-Nov-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
111
Kannauj
GVPR
20067304
ASALTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME
1
12
6548
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
112
Meerut
Power Mech Projects Ltd
20058475
ASFABAD & SHAMASPUR
2
2
4439
2023
2038
2053
31-Dec-2024
06-Sep-2024
24-Oct-2025
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
113
Hardoi
NCC Ltd.
20012353
Asgarpur
2
4
2240
2022
2037
2052
26-Jul-2023
13-Dec-2023
14-Mar-2024
07-Dec-2024
Approved
ok
Approved
OK
View
114
Ambedkar Nagar
Vindhya-GAJA (JV)
20033756
ASHARFABAD WATER SUPPLY SCHEME
2
7
4220
2023
2038
2053
21-Oct-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Checked and found OK
Approved
Scheme completed
View
115
Raebareli
NCC Ltd.
20064085
Ashrafabad WATER SUPPLY SCHEME
2
4
1410
2022
2037
2052
16-Sep-2024
21-Jul-2024
23-Jun-2024
21-Nov-2024
Approved
Ok
Approved
Ok
View
116
Bijnor
Vindhya-GAJA (JV)
20089146
Aslatpur Water Supply Scheme
3
3
4074
2023
2038
2053
06-Jul-2023
20-Oct-2024
20-Apr-2025
21-Apr-2025
Approved
Every thing complete.
Pending
View
117
Amethi
Vindhya-GAJA (JV)
20066626
ASNI1 WATER SUPPLY SCHEME
1
3
2728
2023
2038
2053
06-Jan-2024
19-Jun-2024
19-Sep-2024
20-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
118
Sultanpur
UNIVERSAL MEP
20066080
ASRAFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
3040
2023
2038
2053
12-Jan-2024
12-Jan-2024
04-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
119
Ambedkar Nagar
Vindhya-GAJA (JV)
20041463
ASTABAD WSS
3
5
3890
2023
2038
2053
23-Nov-2023
23-Dec-2024
23-Dec-2024
24-Dec-2024
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
120
Shahjahanpur
NCC Ltd.
20015760
Astoli
1
3
3390
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
121
Sultanpur
UNIVERSAL MEP
20066093
ATAR SUMA KALAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
2725
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
122
Meerut
Power Mech Projects Ltd
20076613
ATAULA
1
1
2550
2023
2038
2053
31-Dec-2024
10-Oct-2024
26-Feb-2025
27-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
123
Meerut
Power Mech Projects Ltd
8362367
ATERNA
1
1
3375
2022
2037
2052
31-Dec-2024
15-Mar-2023
01-Aug-2023
01-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
124
Bijnor
Vindhya-GAJA (JV)
20021919
Athai Jamruddin Gram Panchayat Water Supply
1
1
3159
2022
2037
2052
06-Jul-2023
11-May-2025
11-Nov-2025
12-Nov-2025
Approved
Every thing complete.
Approved
All document complete
View
125
Kanpur Dehat
GVPR
20053176
ATIYA RAIPUR
1
2
2875
2023
2038
2053
18-Nov-2023
26-Dec-2023
10-May-2024
11-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
126
Hardoi
NCC Ltd.
20000036
ATWA ASIGAON 0111
1
6
5460
2022
2037
2052
29-Apr-2023
02-Oct-2023
01-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
127
Kanpur Dehat
Indian Hume Pipe
8362825
AUNDERI
1
1
3260
2022
2037
2052
15-Sep-2021
31-Dec-2024
30-Sep-2023
01-Oct-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
128
Kanpur Dehat
GVPR
20053080
AURANGABAD DALCHAND
1
6
3055
2023
2038
2053
18-Nov-2023
15-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for Further action
Approved
All work of scheme found satisfactory
View
129
Ghaziabad
LC INFRA
20017652
Aurangabad dateri PWS scheme
1
1
3251
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
130
Kanpur Dehat
GVPR
20077371
AURANGABAD HEERAMANSHA ANANATPUR DHAUKAL
2
4
3381
2023
2038
2053
17-Feb-2024
28-Jan-2024
01-May-2024
02-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
131
Gautam Buddha Nagar
LC INFRA
20035303
AURANGABAD URF HUMYAUNPUR WATER SUPPLY SCHEME
1
1
790
2022
2037
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
132
Bijnor
LC INFRA
20051583
AURANGJEBPUR MAHMUD
3
3
6318
2022
2037
2052
18-Jan-2025
18-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
Every thing completed.
Approved
Everything Completed
View
133
Auraiya
GVPR
20040135
Avavar
4
3
4933
2023
2038
2053
11-Dec-2023
25-Mar-2024
06-Aug-2023
11-Jan-2024
Approved
Forwarded for further action.
Pending
View
134
Bijnor
LC INFRA
20016840
AZAMABAD & NAIBPUR SADAT WATER SUPPLY SCHEME
2
2
1988
2022
2037
2052
02-Nov-2021
16-Dec-2024
16-Dec-2024
17-Dec-2024
Approved
Every thing complete.
Approved
Everything Completed.
View
135
Meerut
Power Mech Projects Ltd
20066830
AZAMPUR
1
1
2033
2023
2038
2053
31-Dec-2024
02-Jun-2024
19-Oct-2024
20-Oct-2024
Approved
Recommended for further Approvals.....................................
Approved
Approved
View
136
Shahjahanpur
NCC Ltd.
20016550
babauri
2
2
2810
2022
2037
2052
31-Dec-2024
24-Dec-2023
24-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Babauri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Pending
View
137
Sultanpur
UNIVERSAL MEP
20064718
BABHANGOAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2740
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
138
Ayodhya
UNIVERSAL MEP
20030285
BABHANIYAVAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2130
2023
2038
2053
12-Oct-2023
16-Feb-2024
16-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
139
Auraiya
GVPR
20091181
Babina sukhchainpur PWS
2
2
1704
2023
2038
2053
06-Jan-2022
06-Jul-2024
06-Jun-2024
07-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
140
Amethi
Vindhya-GAJA (JV)
20066413
babu pur Sharia water supply Scheme
1
5
3301
2023
2038
2053
06-Jan-2024
12-Nov-2024
12-Feb-2025
13-May-2025
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
141
Kanpur Dehat
GVPR
20065041
BACHEET BHARTHU
1
1
2633
2023
2038
2053
18-Jan-2024
27-Jul-2023
12-Dec-2023
13-Dec-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
142
Jhansi
NCC Ltd.
8009988
Bacholi Bauzurg GOV
37
7596
80591
2023
2038
2053
30-Jun-2022
30-Aug-2023
20-Jan-2025
21-Jan-2025
Approved
checked
Approved
checked
View
143
Amethi
Vindhya-GAJA (JV)
20065721
BADAGAON WATER SUPPLY SCHEME
1
5
4132
2023
2038
2053
09-Jan-2023
04-Jun-2024
04-Sep-2024
05-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
144
Amethi
Vindhya-GAJA (JV)
20066484
BADALGARH & BAKHTWARNAGAR WATER SUPPLY SCHEME
1
8
3510
2023
2038
2053
06-Jan-2024
14-May-2024
13-Sep-2024
14-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
145
Siddharth Nagar
Megha
20021817
BADEHAR GRANT
1
2
2227
2022
2037
2052
31-Dec-2025
02-Apr-2025
15-Jan-2025
12-Apr-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
146
Sultanpur
UNIVERSAL MEP
20066301
BADHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
2436
2023
2038
2053
12-Jan-2024
12-Jan-2024
28-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
147
Muzaffarnagar
JMC - Lakshmi (JV)
20039473
Badhiwala
1
1
2529
2022
2037
2052
23-May-2024
02-Feb-2024
02-May-2024
03-May-2024
Approved
OK
Pending
View
148
Auraiya
GVPR
20025452
BADIN PWS
3
8
5430
2023
2038
2053
01-Jun-2024
29-Nov-2023
12-Oct-2023
30-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
149
Etawah
Indian Hume Pipe
20024485
Badri Pooth PWS
2
4
3330
2022
2037
2052
22-Sep-2023
15-Mar-2024
21-Jun-2024
22-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
150
Auraiya
GVPR
20065263
Badshahpur chhonk PWS
2
6
2640
2023
2038
2053
01-Jun-2022
24-Aug-2024
07-Jul-2024
25-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
151
Auraiya
GVPR
20088695
Badua Maharaj pur bhadursingh, Phaphund dehat PWS
1
3
3254
2023
2033
2053
06-Jan-2022
26-Jan-2025
25-Jan-2025
27-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
152
Meerut
Power Mech Projects Ltd
20066756
BAFAR
1
1
2881
2023
2038
2053
31-Dec-2024
20-Jul-2024
06-Dec-2024
07-Dec-2024
Approved
Recommended for further Approvals
Approved
approved
View
153
Auraiya
Indian Hume Pipe
8361962
BAGHAIPUR
1
4
2965
2022
2037
2052
15-Sep-2022
01-Nov-2023
14-Feb-2024
15-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
154
Bijnor
LC INFRA
20017058
Bahadarpur Sharfuddin Husain Water Supply
1
1
3393
2022
2037
2052
02-Nov-2023
12-Sep-2024
12-Mar-2025
13-Mar-2025
Approved
Every thing complete
Approved
Every thing complete
View
155
Hardoi
NCC Ltd.
20012558
Bahadurpur
2
3
1690
2022
2037
2052
26-Jul-2023
13-Oct-2023
12-Jan-2024
24-Dec-2024
Approved
ok
Approved
OK
View
156
Meerut
Power Mech Projects Ltd
8362075
BAHADURPUR
1
1
3080
2022
2037
2052
31-Dec-2024
30-Jan-2023
18-Jun-2023
19-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
157
Kanpur Dehat
GVPR
20053135
Bahadurpur
1
7
2679
2023
2038
2053
18-Nov-2023
15-Jan-2024
30-May-2024
31-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
158
Meerut
Power Mech Projects Ltd
20098085
BAHADURPUR
1
1
3229
2023
2038
2053
11-Jun-2025
15-Jun-2024
01-Nov-2024
02-Nov-2024
Approved
Recommended for further Approvals.
Pending
View
159
Auraiya
GVPR
20025226
Bahadurpur Inguthiya
1
3
3024
2023
2038
2053
06-Jan-2022
08-Sep-2023
13-May-2023
28-Jun-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
160
Kannauj
GVPR
20077131
BAHADURPUR MAJHGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4590
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
161
Fatehpur
Power Mech Projects Ltd
20043841
Baharoli
1
2
3610
2023
2038
2053
28-Nov-2023
12-Mar-2025
05-Aug-2025
06-Aug-2025
Approved
Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers.
Pending
View
162
Auraiya
GVPR
20025453
BAHDHMAU
1
1
3047
2023
2038
2053
06-Jan-2022
31-Dec-2024
24-Nov-2023
10-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
163
Kannauj
GVPR
20090084
BAHERA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
1514
2023
2038
2053
08-Sep-2024
16-Jan-2025
17-Apr-2025
18-Apr-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
164
Kannauj
GVPR
20077121
BAHISHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4309
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
165
Ambedkar Nagar
Vindhya-GAJA (JV)
20026118
BAHLOLPUR WATER SUPPLY SCHEME
2
4
2790
2023
2038
2053
29-Sep-2022
28-Sep-2023
23-Mar-2025
24-Mar-2025
Approved
checked and verified
Approved
Scheme completed
View
166
Meerut
Power Mech Projects Ltd
20020833
BAHRALA & IKLAUTA
2
2
3080
2022
2037
2052
04-Feb-2024
24-Dec-2023
12-May-2024
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
167
Sultanpur
UNIVERSAL MEP
20066059
BAHU RAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
12
4300
2023
2038
2053
12-Jan-2024
12-Jan-2024
06-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
168
Ayodhya
UNIVERSAL MEP
20059079
BAIDRAPUR WSS
3
9
3110
2023
2038
2053
19-Mar-2024
23-Aug-2024
23-Aug-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
169
Balrampur
Larsen & Toubro Ltd
8361251
Baijpur
2
3
2802
2022
2037
2052
29-Jun-2023
30-May-2024
30-Aug-2024
30-Aug-2024
Approved
OK
Pending
Reject due to incomplete data
View
170
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20009905
BAIJUPUR
1
8
2080
2022
2037
2052
11-Apr-2023
08-Apr-2025
08-Apr-2025
02-Jul-2025
Approved
SCHEME COMPLETED
Approved
BAIJPUR SCHEME COMPLETED
View
171
Farrukhabad
Vindhya-GAJA (JV)
20092448
BAIRAMPUR MVS
2
2
1755
2023
2038
2053
31-Mar-2025
20-Apr-2024
01-Aug-2024
12-May-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
172
Kanpur Dehat
Indian Hume Pipe
20034277
BAIRI DARIYON
1
4
3170
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Mar-2023
01-Apr-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
173
Kanpur Dehat
GVPR
20025219
Bairisal
1
3
4740
2023
2038
2053
26-Sep-2023
10-Nov-2023
17-Feb-2024
18-Feb-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M . Ref. SWSM/BLG/TPI/KD/NS/2025-26/6653 DT.18.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's
Approved
All work of scheme found satisfactory
View
174
Kannauj
GVPR
20050531
BAISABARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2725
2023
2038
2053
15-Jun-2024
28-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
175
Amethi
Gayatri Projects LTD
20072844
BAISARA WATER SUPPLY SCHEME
2
13
2938
2022
2037
2052
13-Mar-2025
07-Sep-2024
05-Dec-2024
10-Mar-2025
Approved
Hardcopy submiited and all documents found okay..
Pending
View
176
Meerut
Power Mech Projects Ltd
20023019
BAJAUT PWS
1
1
2395
2022
2037
2052
31-Dec-2024
25-May-2024
13-Oct-2024
14-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
177
Farrukhabad
Vindhya-GAJA (JV)
20093035
BAJHERA MALIK PATTI SVS
1
2
1390
2023
2038
2053
30-May-2025
31-Mar-2025
31-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
178
Bijnor
LC INFRA
8361058
BAJIDPUR VILLAGE WATER SCHEME
1
2
1981
2022
2037
2052
29-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
All document complete
View
179
Azamgarh
LC INFRA
20101554
Bakashpur Rural Water Supply Scheme
2
4
3959
2023
2038
2053
10-Aug-2023
11-Jan-2024
11-Apr-2024
12-Apr-2024
Approved
Ok
Approved
OK
View
180
Auraiya
Indian Hume Pipe
20014587
BAKHARIYA PWS
1
2
1840
2022
2037
2052
08-May-2023
10-Jan-2023
09-Oct-2024
10-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
181
Ambedkar Nagar
Vindhya-GAJA (JV)
20075144
BALA PAIKAULI WSS
1
9
3520
2023
2038
2053
08-Mar-2024
20-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
182
Sultanpur
UNIVERSAL MEP
20064752
BALAPASHCHIM GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
4660
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
183
Gautam Buddha Nagar
LC INFRA
8389568
BALLABH NAGAR URF KARROL BANGAR GRAM PANCHAYAT WATER SUPPLY
1
1
2023
2022
2037
2052
07-Feb-2024
10-Nov-2024
10-Sep-2024
10-Nov-2024
Approved
Project certificate is verified
Pending
View
184
Bijnor
LC INFRA
20095825
BAMNOLI VILLAGE WSS
2
2
3531
2022
2037
2052
13-Apr-2023
20-Feb-2025
20-Feb-2025
21-Feb-2025
Approved
Every thing complete.
Approved
All document complete
View
185
Shahjahanpur
NCC Ltd.
20016412
BAMRAULI
1
2
1640
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
186
Kanpur Dehat
GVPR
20077609
banaralipur & swarooppur
2
2
4551
2023
2038
2053
17-Feb-2024
25-Feb-2024
25-May-2024
26-May-2024
Approved
Forward for Necessary action
Approved
All work of scheme found satisfactory
View
187
Ghaziabad
LC INFRA
20094886
BANDIPUR VILLAGE WATER SUPPLY SCHEME
1
1
2058
2022
2037
2052
01-Oct-2024
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
188
Amethi
Vindhya-GAJA (JV)
20098342
BANDOIYA Water Supply Scheme
1
2
1498
2023
2038
2053
04-Jul-2024
26-Jun-2024
26-Sep-2024
27-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
189
Ayodhya
UNIVERSAL MEP
20058408
Bangaona And Firozpur pawaran WSS
2
2
4390
2023
2038
2053
22-Jan-2024
09-May-2024
09-May-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
190
Amethi
Gayatri Projects LTD
20085728
BANHAPUR WATER SUPPLY SCHEME
2
4
2431
2023
2038
2052
22-Sep-2024
07-Jun-2024
10-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
191
Bahraich
PNC-SPML-JV
20017926
BANIA HARI CHITTAURA PWS
1
6
3610
2022
2037
2052
31-Dec-2025
16-Oct-2025
16-Oct-2025
17-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0064 kindly complete it.
Approved
Scheme Completed
View
192
Kanpur Dehat
GVPR
20077456
BANIPARA DAGRAHA
2
4
3696
2023
2038
2053
17-Feb-2024
22-Dec-2023
06-May-2024
07-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
193
Mau
LC INFRA
8375486
BANIYAPAR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
2
4
2500
2022
2037
2052
02-May-2023
06-Jul-2023
07-Jun-2024
26-Nov-2024
Approved
All Documents verified & Checked
Approved
Approved
View
194
Siddharth Nagar
JAKSON - VISHVARAJ (JV)
20097023
BANKATA SECOND GP WSS
1
2
1850
2023
2038
2053
04-Oct-2024
25-Mar-2025
25-Mar-2025
09-Sep-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
195
Ayodhya
UNIVERSAL MEP
20030438
BANMAU & MIRMAU GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
5710
2023
2038
2053
12-Oct-2023
15-Mar-2024
15-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
196
Kannauj
GVPR
20067615
BANPUR RUDAULI NARAYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2278
2023
2038
2053
16-Aug-2024
14-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
197
Sultanpur
UNIVERSAL MEP
20066527
BANSI & UTARDAHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
4900
2023
2038
2053
12-Jan-2024
12-Jan-2024
21-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
198
Lakhimpur Kheri
NCC Ltd.
8360567
Banstali
1
6
2211
2022
2037
2052
09-Apr-2023
04-Feb-2023
20-May-2023
20-Nov-2024
Approved
Approved as per check list
Approved
Found Ok
View
199
Hardoi
NCC Ltd.
20008678
Banta Kamalpur
1
1
2160
2022
2037
2052
05-Mar-2023
01-Dec-2022
01-Mar-2023
25-Dec-2024
Approved
ok
Approved
OK
View
200
Meerut
Power Mech Projects Ltd
20092218
BAPARSA
1
1
3105
2022
2037
2052
31-Dec-2024
14-Aug-2024
02-Jan-2025
03-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
201
Meerut
Power Mech Projects Ltd
20067091
BAPARSI
1
1
4118
2022
2037
2052
31-Dec-2024
01-Aug-2024
20-Dec-2024
21-Dec-2024
Approved
Recommended for further Approvals.......................
Approved
APPROVED
View
202
Kanpur Dehat
GVPR
20077333
Baragaon & khalakpur
3
6
4328
2023
2038
2053
17-Feb-2024
14-Nov-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
203
Kanpur Dehat
GVPR
20065069
BARAGAON BHIKKI
2
4
3204
2023
2038
2053
18-Jan-2024
12-Oct-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
204
Fatehpur
Power Mech Projects Ltd
20095835
BARAHATA
1
2
2210
2023
2038
2053
15-May-2023
30-Jun-2025
12-Dec-2024
13-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (12.12.2024)
Approved
Verified
View
205
Ayodhya
UNIVERSAL MEP
20059048
BARAI KALA & SIWAR WSS
2
5
4690
2023
2038
2053
19-Mar-2024
14-Jan-2025
14-Jan-2025
01-Feb-2025
Approved
FOUND OK
Pending
View
206
Fatehpur
Power Mech Projects Ltd
20097775
BARAICHA
2
2
2360
2023
2038
2058
14-Aug-2023
30-Jun-2025
04-Dec-2024
05-Dec-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
207
Fatehpur
Power Mech Projects Ltd
20102049
BARAICHI
1
1
1950
2023
2038
2053
20-Sep-2024
19-Mar-2025
18-Mar-2025
19-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (19.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
208
Kannauj
GVPR
20036218
BARAMAU BANGER PEYJAL YOJNA
1
5
3422
2023
2038
2053
13-May-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
209
Bijnor
LC INFRA
8388820
BARAMJITPUR CHANDA GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
2478
2022
2037
2052
29-Sep-2021
10-Jun-2024
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
every thing completed
View
210
Fatehpur
Power Mech Projects Ltd
20097451
BARANPUR
1
1
2360
2023
2038
2053
20-Sep-2024
19-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (17.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
211
Kanpur Dehat
GVPR
20095626
Barar
2
2
1730
2023
2038
2053
30-Nov-2023
02-Jan-2024
03-Apr-2024
04-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
212
Fatehpur
Power Mech Projects Ltd
20097777
BARAR,GAZIPUR
3
17
4970
2023
2038
2053
14-May-2024
30-Jun-2025
12-Sep-2024
12-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (10.09.2024)
Approved
Verified
View
213
Auraiya
GVPR
20099164
Barau PWS
1
2
1448
2023
2038
2053
21-Jun-2024
06-Apr-2024
19-Feb-2024
07-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
214
Kannauj
GVPR
20098265
BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3935
2023
2038
2053
14-Nov-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
215
Ayodhya
UNIVERSAL MEP
20031481
BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2950
2023
2038
2053
12-Oct-2023
26-Oct-2023
26-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
216
Ayodhya
UNIVERSAL MEP
20030453
BARELA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3550
2023
2038
2053
12-Oct-2023
08-Mar-2024
08-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
217
Kannauj
GVPR
20099739
BARGAWA GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
5
3861
2023
2038
2053
08-Sep-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
218
Kanpur Dehat
VSA
20094193
Bargawan
1
1
1691
2023
2038
2023
30-Apr-2023
31-Dec-2023
07-May-2024
08-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
219
Meerut
Power Mech Projects Ltd
8362768
BARHANPUR
1
1
2192
2022
2037
2052
31-Dec-2024
27-Feb-2024
20-Mar-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
220
Moradabad
LC INFRA
20012105
Barhpura Mazra Mahespur Khem
1
1
2730
2022
2037
2052
10-Aug-2023
15-Oct-2024
13-Jan-2024
14-Jan-2024
Approved
Ok
Pending
View
221
Hardoi
NCC Ltd.
20011901
BARI
5
5
2780
2022
2037
2052
14-Jun-2023
25-Dec-2022
01-Apr-2023
30-Nov-2024
Approved
ok
Approved
OK
View
222
Kannauj
GVPR
20050543
BARIA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2434
2023
2038
2053
15-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
223
Shahjahanpur
NCC Ltd.
20013439
Barilalpur water supply scheme
3
4
2970
2022
2037
2052
30-Sep-2023
31-Dec-2024
26-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
224
Auraiya
GVPR
20089651
Barkasi PWS
1
1
2526
2023
2038
2053
06-Jan-2022
05-Mar-2024
26-Nov-2023
11-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
225
Bijnor
Vindhya-GAJA (JV)
20053412
Barkatpur Water supply scheme
1
1
3903
2023
2038
2053
06-Jul-2023
02-Apr-2024
05-Oct-2024
06-Oct-2024
Approved
Every thing complete.
Approved
Everything Complete
View
226
Moradabad
LC INFRA
20011100
Barkhera Basantpur Urf Dayanat village water supply scheme
1
1
4911
2022
2037
2052
09-Feb-2024
01-Aug-2024
31-Oct-2024
01-Nov-2024
Approved
Ok
Pending
View
227
Bijnor
LC INFRA
20019385
Barkhrabad Urf Khatai Water Supply
1
1
2059
2022
2037
2052
09-Feb-2024
06-Apr-2024
14-Oct-2024
15-Oct-2024
Approved
Every thing completed.
Approved
complete
View
228
Fatehpur
Power Mech Projects Ltd
20097505
BAROUN
1
1
2860
2023
2038
2053
25-Sep-0024
30-Jun-0025
23-Feb-2024
24-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January (23.01.2024)
Approved
Verified
View
229
Kanpur Dehat
GVPR
20025211
BARRA THARRA
2
4
3941
2023
2038
2053
26-Sep-2023
01-Nov-2023
17-Mar-2024
18-Mar-2024
Approved
Forward for necessary action pls.
Approved
All work of scheme found satisfactory
View
230
Ambedkar Nagar
Vindhya-GAJA (JV)
20019746
Barsari
1
12
4640
2023
2038
2053
03-Aug-2023
25-Feb-2025
31-Oct-2025
01-Nov-2025
Approved
checked and found ok
Approved
Scheme Completed
View
231
Ayodhya
UNIVERSAL MEP
20031498
BARTARA & MOHAMMADPUR DAUDPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
6
4000
2023
2038
2053
12-Oct-2023
19-Oct-2023
19-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
232
Kannauj
GVPR
20067597
BARUASABAL PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
5427
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
233
Jhansi
Unipro
8135681
Barwar GOV
58
37
88387
2023
2038
2053
04-Nov-2022
31-Jul-2024
29-Dec-2024
30-Dec-2024
Approved
checked
Approved
checked
View
234
Ambedkar Nagar
Vindhya-GAJA (JV)
20041590
BASAHIYA
3
16
3780
2023
2038
2053
23-Nov-2023
24-Dec-2024
28-Mar-2025
29-Mar-2025
Approved
Checked and found ok
Approved
CHECKED AND FOUND OK
View
235
Amethi
Vindhya-GAJA (JV)
20085694
BASAIKPUR WATER SUPPLY SCHEME
1
6
2135
2023
2038
2053
29-Apr-2024
05-Nov-2024
05-Feb-2025
06-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
236
Bijnor
LC INFRA
8361017
BASANTPUR VILLAGE WATER SCHEME
1
1
4356
2022
2037
2052
30-Sep-2023
27-Feb-2024
26-Aug-2024
27-Aug-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
237
Ambedkar Nagar
Vindhya-GAJA (JV)
20026076
BASANTPUR WATER SUPPLY SCHEME
1
12
4950
2023
2038
2053
28-Sep-2023
01-Jul-2025
19-Oct-2025
20-Oct-2025
Approved
checked and found ok
Approved
Scheme Completed
View
238
Ambedkar Nagar
Vindhya-GAJA (JV)
20035108
BASIA WSS
2
6
3680
2023
2038
2053
21-Nov-2023
14-Aug-2024
02-Dec-2024
03-Dec-2024
Approved
checked and found ok
Approved
SCHEME COMPLETED
View
239
Hardoi
NCC Ltd.
20011927
BASIT NAGAR
2
5
5530
2022
2037
2052
14-Jun-2023
13-May-2023
12-Aug-2023
25-Dec-2024
Approved
ok
Approved
OK
View
240
Ambedkar Nagar
Vindhya-GAJA (JV)
20081358
BASOHARI WSS
3
7
2824
2023
2038
2053
09-Mar-2024
19-Nov-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
241
Meerut
Power Mech Projects Ltd
20010927
BASTORA NORANG
2
2
3022
2022
2037
2052
31-Dec-2024
25-Sep-2024
14-Feb-2025
15-Feb-2025
Approved
Recommended for further Approvals.
Pending
View
242
Meerut
Power Mech Projects Ltd
20074091
BATJEORA
1
1
2743
2022
2037
2052
31-Dec-2024
05-Jun-2024
22-Oct-2024
23-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
243
Shahjahanpur
NCC Ltd.
20084141
BAURI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5910
2022
2037
2052
31-Aug-2024
31-Dec-2024
30-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bauri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bauri scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
244
Hardoi
NCC Ltd.
8360559
BAUSRA
1
3
2790
2022
2037
2052
05-Mar-2023
29-Jun-2023
28-Sep-2023
25-Dec-2024
Approved
ok
Approved
OK
View
245
Kannauj
GVPR
20036243
BAUTHAM GRAMIN PEYJAL YOJNA
1
5
3988
2023
2038
2053
13-May-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
246
Etawah
Indian Hume Pipe
20015033
Beedhupura
4
6
2350
2022
2037
2052
08-May-2023
11-Aug-2023
31-Mar-2024
01-Apr-2024
Approved
All work has been completed as per approved departmental design and drawing. No any leakage or pressure drop found during the final inspection. Water supply is continue from last 1 year.
Approved
All work of scheme found satisfactory
View
247
Farrukhabad
Vindhya-GAJA (JV)
20074527
BEEGHAMAU MVS
3
5
4265
2023
2038
2053
30-May-2025
25-May-2024
25-May-2024
26-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
248
Farrukhabad
Vindhya-GAJA (JV)
20092383
BEG & HUSAINPUR BANGER MVS
5
5
3446
2023
2038
2053
31-Mar-2025
08-Oct-2024
01-Feb-2025
02-Feb-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
249
Bijnor
LC INFRA
8360405
BEGAMPUR SHADI GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
5526
2022
2037
2052
29-Sep-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
All document checked.
View
250
Kannauj
GVPR
20067688
BEHARAPUR GAISAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
3024
2023
2038
2053
16-Aug-2024
09-Jun-2024
10-Jun-2024
11-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
251
Meerut
Power Mech Projects Ltd
20037256
BEHJADKA
2
2
4172
2022
2037
2052
31-Dec-2024
20-Sep-2024
04-Feb-2025
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
252
Kannauj
GVPR
20077084
BEHTA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2912
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
253
Amethi
Vindhya-GAJA (JV)
20085686
BEHTA MURTAJAPUR WATER SUPPLY SCHEME
3
5
2777
2023
2038
2053
29-Apr-2024
25-May-2024
26-Sep-2024
05-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
254
Auraiya
GVPR
20093723
Belpur bela PWS
2
1
1853
2023
2038
2053
06-Jan-2022
10-Aug-2024
09-Aug-2024
10-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
255
Bijnor
LC INFRA
20026238
Berkhera-Niyamtabad_Rananangla Village Water Supply
3
3
1838
2022
2037
2052
09-Feb-2022
05-Jun-2024
05-Jun-2024
06-Jun-2024
Approved
Every thing completed
Approved
EVERY THING COMPLETED
View
256
Ayodhya
UNIVERSAL MEP
20058331
Betauli WSS
2
2
2240
2023
2038
2053
12-Oct-2023
20-Jun-2024
20-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
257
Ambedkar Nagar
Vindhya-GAJA (JV)
20098231
BHABHAURA Water Supply Scheme
4
10
4390
2023
2038
2053
09-Mar-2023
21-Apr-2024
15-May-2025
16-May-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
258
Sultanpur
UNIVERSAL MEP
20066964
BHADA & PAKARI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
4
12
8820
2023
2038
2053
12-Jan-2024
31-Dec-2024
01-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
259
Moradabad
LC INFRA
20011205
Bhadarpur Rajpoot Water Supply Scheme
1
1
3841
2022
2037
2052
29-Sep-2023
10-Dec-2023
20-Mar-2024
21-Mar-2024
Approved
Ok
Pending
View
260
Fatehpur
Power Mech Projects Ltd
20097721
BHADAUHA ,CHANDPUR
1
3
4010
2023
2033
2053
14-May-2024
30-Jun-2025
04-Dec-2024
05-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
261
Ghaziabad
LC INFRA
8389818
BHADAULA VILLAGE WATER SUPPLY SCHEME
1
1
2193
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
262
Ghaziabad
LC INFRA
20024681
BHADAULI PWS SCHEME
1
1
2522
2022
2037
2052
27-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
263
Meerut
Power Mech Projects Ltd
20020211
BHADAURA
1
1
3723
2022
2037
2052
31-Dec-2024
10-Jul-2024
26-Nov-2024
28-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
264
Auraiya
GVPR
20099294
Bhadaura PWS
2
5
300
2023
2038
2053
01-Jun-2022
19-Jun-2025
18-Mar-2025
18-Jun-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
265
Auraiya
Indian Hume Pipe
20014518
bhadaurpur sahar pws
2
4
2200
2022
2037
2052
08-May-2023
21-Aug-2023
04-Feb-2024
05-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
266
Kanpur Dehat
GVPR
20025218
BHADHAWAL
2
1
3159
2023
2038
2053
26-Sep-2023
21-Nov-2023
19-Mar-2024
20-Mar-2024
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
267
Kannauj
GVPR
20067605
BHADOUSI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3145
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
268
Auraiya
GVPR
20065627
Bhadsiya & bamrauliya
1
6
3254
2023
2038
2053
06-Jan-2022
12-Sep-2024
11-Sep-2024
13-Sep-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
269
Ambedkar Nagar
Vindhya-GAJA (JV)
20047607
BHADYA Water Supply Scheme
5
5
3220
2023
2038
2053
25-Nov-2023
31-Dec-2024
16-May-2025
17-May-2025
Approved
Checked and Found Ok
Approved
Scheme completed
View
270
Ambedkar Nagar
Vindhya-GAJA (JV)
20047223
BHAGAUTI PUR Water Supply Scheme
2
10
3306
2023
2038
2053
23-Nov-2023
09-Jan-2025
09-Jan-2025
10-Jan-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
271
Auraiya
Indian Hume Pipe
8361896
BHAGAUTIPUR
1
1
1960
2022
2037
2052
08-May-2023
25-Apr-2023
29-Sep-2023
30-Sep-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
272
Meerut
Power Mech Projects Ltd
20067135
BHAGWANPUR
1
1
2736
2023
2038
2053
31-Dec-2024
03-Jun-2024
23-Oct-2024
24-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
273
Kannauj
GVPR
20050192
BHAGWANTPUR & PRANPUR PULYRA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
4643
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
274
Moradabad
LC INFRA
20011094
bhaipur village water supply scheme
1
1
8474
2022
2037
2052
08-Feb-2023
22-Jul-2024
21-Oct-2024
22-Oct-2024
Approved
Ok
Pending
View
275
Kanpur Dehat
Indian Hume Pipe
20048682
Bhairon Shahjahanpur
3
3
3030
2022
2037
2052
24-Nov-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for necessary action pls.
Approved
All work of scheme found satisfactory
View
276
Ayodhya
UNIVERSAL MEP
20030057
BHAISAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
10
5470
2023
2038
2053
12-Oct-2023
25-Nov-2024
25-Nov-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
277
Kanpur Dehat
Indian Hume Pipe
20034282
BHAISAYNA
1
6
5000
2022
2037
2052
23-Nov-2023
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
278
Meerut
Power Mech Projects Ltd
20011233
BHALSONA
1
1
2714
2022
2037
2052
31-Dec-2024
12-Dec-2022
02-May-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
279
Moradabad
LC INFRA
20012103
Bhanpur Gajraula
1
2
2490
2022
2037
2052
09-Feb-2024
28-Sep-2024
27-Dec-2024
28-Dec-2024
Approved
Ok
Pending
View
280
Kannauj
GVPR
20036145
BHANWAR GARH GRAMIN PEYJAL YOJNA
2
4
2657
2023
2038
2053
13-May-2024
21-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
281
Kanpur Dehat
GVPR
20053362
Bhanwarpur
1
3
2963
2023
2038
2053
18-Nov-2023
30-Nov-2023
27-Mar-2024
28-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
282
Etawah
Indian Hume Pipe
20026313
Bharaipur PWS
1
4
2715
2022
2037
2052
22-Sep-2023
20-Feb-2024
21-May-2024
22-May-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
283
Kanpur Dehat
GVPR
20065072
BHARAMAU
3
6
2699
2023
2038
2053
18-Jan-2024
01-Jan-2024
10-Apr-2024
11-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
284
Kanpur Dehat
Indian Hume Pipe
20034285
BHARATPUR PIYASI
1
6
2990
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
285
Bijnor
LC INFRA
20019390
Bhareka Water Supply
3
3
2481
2022
2037
2052
10-Feb-2024
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
All Documents checked and verified
View
286
Shahjahanpur
NCC Ltd.
8362049
BHARTAPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2269
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
287
Siddharth Nagar
Megha
20023350
BHASAULA GP WSS
2
1
1415
2022
2037
2052
12-Mar-2025
08-Oct-2025
08-Oct-2025
08-Dec-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
288
Ambedkar Nagar
Vindhya-GAJA (JV)
20019933
Bhasra
1
2
2490
2023
2038
2053
03-Aug-2023
25-Sep-2024
27-Dec-2024
28-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
289
Amethi
Vindhya-GAJA (JV)
20085677
BHATGAWAN WATER SUPPLY SCHEME
2
9
5311
2023
2038
2053
29-Apr-2024
17-Dec-2024
17-Mar-2025
18-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
290
Sultanpur
UNIVERSAL MEP
20091256
BHATI & SANICHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
5880
2023
2038
2053
22-Mar-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
291
Mau
LC INFRA
20045020
BHATIKALA WATER SUPPLY SCHEME
2
12
2889
2022
2037
2052
14-Mar-2023
14-Jan-2025
14-Jan-2025
15-Jan-2025
Approved
Approved.
Approved
Approved.
View
292
Shahjahanpur
NCC Ltd.
8388655
BHATIURA
3
3
2830
2022
2037
2052
30-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
293
Bijnor
LC INFRA
20076096
BHATPURA WATER SUPPLY SCHEME
2
2
2340
2022
2037
2052
03-Feb-2023
30-Oct-2024
31-Jan-2025
01-Apr-2024
Approved
Every thing complete.
Approved
Complete document
View
294
Sultanpur
UNIVERSAL MEP
20066542
BHATTHI JARAULI & PAIGAPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
5430
2023
2038
2053
12-Jan-2024
31-Dec-2024
16-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
295
Kanpur Dehat
GVPR
20053104
Bhaura
1
2
3000
2023
2038
2053
18-Nov-2023
04-Nov-2023
19-Mar-2024
20-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
296
Kannauj
GVPR
20036642
BHAURAJPUR & JAGDISHPUR GRAMIN PEYJAL YOJNA
3
10
5101
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
297
Amethi
Gayatri Projects LTD
20100938
BHAVALPUR & AMBARPUR WATER SUPPLY SCHEME
3
16
4698
2022
2037
2053
25-Jun-2025
02-Sep-2024
05-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
298
Sultanpur
UNIVERSAL MEP
20066798
BHAVANIGARH & HASAI MUKUNDPUR GRAM PANCHYAT WATER SUPPLY SCHEME
2
12
2965
2023
2038
2053
12-Jan-2024
14-Jan-2024
21-Nov-2024
01-Dec-2024
Approved
All uploaded documents checked and found as per requirements. This is sending for further process.
Approved
All uploaded documents have been checked and verified as per requirements
View
299
Shahjahanpur
NCC Ltd.
20084093
BHAWALKHERA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
31-Dec-2024
20-Aug-2024
19-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
300
Sultanpur
UNIVERSAL MEP
20066947
BHEEKHARPUR & ETWA MALNA GRAM PANCHAYAT WATER SUPPLY SCHEME
4
12
2990
2023
2038
2053
12-Jan-2024
31-Dec-2024
04-Jul-2024
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
301
Moradabad
LC INFRA
20062181
Bhikanpur Baga Village Water Supply Scheme
1
1
4620
2022
2037
2052
06-Jan-2024
03-May-2024
02-Aug-2024
03-Aug-2024
Approved
Ok
Pending
View
302
Kannauj
GVPR
20067319
BHIKHAMPUR SANI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
2452
2023
2038
2053
16-Aug-2024
30-Apr-2024
03-Aug-2024
04-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
303
Kanpur Dehat
GVPR
20099403
Bhikhdev
1
4
3973
2023
2038
2053
15-Apr-2024
25-Nov-2023
09-Apr-2024
10-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
304
Ambedkar Nagar
Vindhya-GAJA (JV)
20019774
Bhikhpur Khurd
3
13
6270
2023
2038
2053
03-Aug-2023
14-Aug-2024
02-Dec-2024
03-Dec-2024
Approved
checked and verified and found OK
Approved
Scheme completed
View
305
Muzaffarnagar
JMC - Lakshmi (JV)
20070200
BHIKKI
1
1
2904
2022
2037
2052
07-Aug-2024
08-Apr-2025
08-Jul-2025
09-Jul-2025
Approved
APPROVED
Pending
View
306
Ambedkar Nagar
Vindhya-GAJA (JV)
20026063
BHISVA CHITAUNA SUPPLY SCHEME
3
7
6340
2023
2038
2053
28-Sep-2023
25-Jun-2025
12-Oct-2025
13-Oct-2025
Approved
checked and found ok
Approved
Scheme Completed
View
307
Moradabad
LC INFRA
20013578
Bhit Khera village water supply scheme
1
2
6700
2022
2037
2052
20-Sep-2023
03-Aug-2024
02-Nov-2024
03-Nov-2024
Approved
Ok
Pending
View
308
Ayodhya
UNIVERSAL MEP
20058531
Bhitaura WSS
1
2
2520
2023
2038
2053
12-Oct-2023
20-May-2024
20-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
309
Hardoi
NCC Ltd.
20000031
BHITI NEWADA
1
3
2040
2022
2037
2052
29-Apr-2023
25-Mar-2023
24-Jun-2023
24-Dec-2024
Approved
ok
Approved
OK
View
310
Ambedkar Nagar
Vindhya-GAJA (JV)
20075106
BHIURA WSS
1
5
2200
2023
2038
2053
08-Mar-2024
04-Aug-2025
24-Nov-2025
25-Nov-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
311
Kannauj
GVPR
20050528
BHOJPUR NIGOH GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2219
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
312
Bareilly
NCC Ltd.
20015418
BHOJPUR water supply scheme
1
1
2130
2022
2037
2052
20-Jul-2023
08-Apr-2024
08-Jul-2023
25-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhojpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
313
Meerut
Power Mech Projects Ltd
20010918
BHOLA
1
1
6162
2022
2037
2052
31-Dec-2024
18-Jun-2024
05-Nov-2024
06-Nov-2024
Approved
Recommended for further Approval
Approved
Approved
View
314
Auraiya
GVPR
20084715
Bhontapur & kunwardeopur & dhanaupur PWS
4
8
3965
2023
2038
2053
06-Jan-2022
31-Dec-2024
13-May-2024
15-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
315
Auraiya
GVPR
20099283
Bhorajpur pws
1
1
488
2023
2038
2053
06-Jan-2022
29-Sep-2024
28-Sep-2024
30-Sep-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
316
Hardoi
NCC Ltd.
20011908
BHORAPUR
4
5
2450
2022
2037
2052
14-Jun-2023
20-May-2023
24-Aug-2023
13-Dec-2024
Approved
ok
Approved
OK
View
317
Ambedkar Nagar
Vindhya-GAJA (JV)
20026078
BHUJAGI WATER SUPPLY SCHEME
1
5
4290
2023
2038
2053
28-Sep-2023
25-Jul-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
318
Mau
GA INFRA-VPL
20101186
BHULAIDEEH GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
1680
2023
2038
2053
18-Oct-2024
18-Oct-2024
19-Jan-2025
20-Jan-2025
Approved
Approved.
Approved
Approved
View
319
Farrukhabad
Vindhya-GAJA (JV)
20092455
BHULANPUR CHIRPURA MVS
2
5
1996
2023
2038
2053
31-Mar-2025
26-Dec-2024
09-Apr-2025
10-Apr-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
320
Sambhal
SPML Infra
20070418
Bhura Begampur W/S Scheme
1
1
1630
2022
2037
2052
03-Aug-2024
14-Jun-2024
14-Sep-2024
15-Sep-2024
Approved
Trial Run Successfully Completed on 14-12-24
Approved
Approved
View
321
Kanpur Dehat
Indian Hume Pipe
20096865
Bibapur
2
3
1845
2022
2037
2052
04-Mar-2023
31-Dec-2024
05-Dec-2023
06-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
322
Sultanpur
UNIVERSAL MEP
20077646
BIBIGANJ & KHAICHILAKALA GRAM PANCHAYAT WATER SUPPLY SCHEME
4
8
5560
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
323
Auraiya
GVPR
20084716
Bibipur PWS
4
4
3159
2023
2038
2053
31-Dec-2024
25-Jan-2024
24-Jan-2024
25-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
324
Farrukhabad
GVPR
20018313
BIBIPUR W/S Scheme
1
2
1805
2022
2037
2052
08-Mar-2023
27-Jun-2024
27-Jun-2024
28-Jul-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
325
Azamgarh
LC INFRA
20101579
BIBIPUR WATER SUPPLY SCHEME
3
7
2946
2023
2038
2053
10-Aug-2023
05-Jan-2024
09-Apr-2024
10-Apr-2024
Approved
OK
Approved
OK
View
326
Muzaffarnagar
JMC - Lakshmi (JV)
20018283
BIBIPUR WSS
1
1
1920
2022
2037
2052
15-Aug-2023
03-May-2025
05-Sep-2025
06-Sep-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
327
Ayodhya
UNIVERSAL MEP
20031490
BIHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4020
2023
2038
2053
12-Oct-2023
30-Nov-2023
30-Nov-2023
01-Feb-2025
Approved
FOUND OK
Pending
View
328
Shahjahanpur
NCC Ltd.
20018011
Biharipur
2
2
1908
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
329
Auraiya
GVPR
20091073
Bijhalpur PWS
1
2
1775
2023
2038
2053
01-Jun-2022
29-May-2024
25-May-2024
30-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
330
Moradabad
LC INFRA
8359732
BIJNA VILLAGE WATER SUPPLY SCHEME
1
1
10280
2022
2037
2052
26-Aug-2023
05-Aug-2024
04-Nov-2024
05-Nov-2024
Approved
Ok
Pending
View
331
Meerut
Power Mech Projects Ltd
8362351
BIJOLI
1
1
6873
2022
2037
2052
31-Dec-2024
16-Sep-2024
02-Feb-2025
03-Feb-2025
Approved
Recommended for further Approvals.
Approved
APPROVED
View
332
Amethi
Vindhya-GAJA (JV)
20070881
BIKHANPUR WATER SUPPLY SCHEME
1
6
2031
2023
2038
2053
23-Mar-2024
19-Jun-2024
19-Sep-2024
20-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
333
Kannauj
GVPR
20067388
BILANDPUR & GADIA BALIDATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2293
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
334
Shahjahanpur
NCC Ltd.
20014800
Bilhari
1
1
2273
2022
2037
2052
31-Dec-2024
31-Jul-2023
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bilhari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Pending
View
335
Kanpur Dehat
Indian Hume Pipe
20034287
BILSARAYAN
1
2
2630
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Jan-2024
01-Feb-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
336
Kanpur Dehat
Indian Hume Pipe
20025553
Bilti
1
2
2250
2022
2037
2052
25-Aug-2022
24-Aug-2023
30-Apr-2023
01-May-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
337
Sultanpur
UNIVERSAL MEP
20066283
BINGI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
11
2810
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
338
Kannauj
GVPR
20066409
BINORARAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
9
4615
2023
2038
2053
06-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
339
Shahjahanpur
NCC Ltd.
20015536
Birahampur Jhajharia Banda
1
1
2640
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Birhampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Birahampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
340
Bahraich
PNC-SPML-JV
20099238
BIRAHIMDIHA TEJWAPUR RF PWS
1
8
2370
2022
2037
2052
31-Dec-2025
13-Oct-2025
13-Oct-2025
14-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0144, kindly complete it.
Approved
Scheme Completed
View
341
Muzaffarnagar
Gayatri Projects LTD
20058590
BIRALASI WATER SUPPLY SCHEME
1
2
6793
2022
2037
2052
16-Sep-2022
07-Oct-2024
08-Oct-2024
09-Oct-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
342
Ayodhya
VSA
20096861
BIRAULI & ITUNJA WSS
2
2
3650
2023
2038
2053
22-May-2024
08-Oct-2024
08-Oct-2024
17-Jun-2025
Approved
FOUND OK
Pending
View
343
Bijnor
Vindhya-GAJA (JV)
20100230
BIRDO NANGLI WSS
2
2
2888
2022
2037
2052
06-Jul-2023
04-Mar-2025
04-Sep-2025
05-Sep-2025
Approved
Every thing complete.
Approved
All document complete
View
344
Ayodhya
UNIVERSAL MEP
20030511
BIRHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
2670
2023
2038
2053
12-Oct-2023
01-Dec-2023
01-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
345
Kannauj
GVPR
20067626
BIRPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
3049
2023
2038
2053
16-Aug-2024
03-May-2024
07-Aug-2024
08-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
346
Moradabad
LC INFRA
20064488
Bisahat Jaitpura Village Water Supply Scheme
1
1
6732
2022
2037
2052
08-Feb-2024
03-May-2024
02-Aug-2024
03-Aug-2024
Approved
Ok
Pending
View
347
Kannauj
GVPR
20066532
BISANDHUA & JASPURAPUR SARAIA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
4538
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
348
Azamgarh
LC INFRA
20024753
Bisauli Rural Water Supply Scheme
1
7
3480
2022
2037
2052
10-Aug-2023
17-Jan-2024
17-Apr-2024
18-Apr-2024
Approved
ok
Approved
OK
View
349
Jaunpur
Welspun Kaveri Infraprojects JV
20020086
Bishambhara
2
3
1871
2022
2037
2021
22-May-2022
31-Dec-2024
20-Jun-2025
21-Jun-2025
Approved
Checked and found ok
Approved
ok
View
350
Kanpur Dehat
GVPR
20065092
Bisoha
1
4
3398
2023
2038
2053
18-Jan-2024
08-Aug-2023
12-Nov-2023
13-Nov-2023
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, MDPE Pipe Open & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
351
Ambedkar Nagar
Vindhya-GAJA (JV)
20067161
BISUNPUR BAJDAHA Water Supply Scheme
5
9
4220
2023
2038
2053
21-Feb-2023
21-Feb-2024
28-Apr-2025
29-Apr-2025
Approved
CHECK AND FOUND OK
Approved
Scheme completed
View
352
Azamgarh
LC INFRA
20058024
Bithalpur WATER SUPPLY SCHEME
4
7
3371
2023
2038
2053
09-May-2024
21-Jul-2024
20-Oct-2024
21-Oct-2024
Approved
OK
Approved
OK
View
353
Farrukhabad
Vindhya-GAJA (JV)
20097980
BOHARANPUR TAPPA HAWELI MVS
2
7
3461
2023
2038
2053
30-May-2025
26-May-2024
25-May-2024
26-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
Ok
View
354
Sultanpur
UNIVERSAL MEP
20066826
BRAHIMPUR & SARIYA MAFI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
4153
2023
2038
2053
12-Jan-2024
12-Jan-2024
04-Mar-2025
05-Mar-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
355
Meerut
Power Mech Projects Ltd
20077321
BUBAKPUR
1
1
1629
2022
2037
2052
31-Dec-2024
25-Jun-2024
11-Nov-2024
12-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
356
Bijnor
LC INFRA
8360406
BUDGARI GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
3112
2022
2037
2052
02-Nov-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete
View
357
Ambedkar Nagar
Vindhya-GAJA (JV)
20067349
BUDHANPUR Water Supply Scheme
1
2
2140
2023
2038
2052
08-Mar-2024
12-Jan-2025
12-Jan-2025
13-Jan-2025
Approved
Checked and Verified
Approved
Scheme completed
View
358
Bijnor
LC INFRA
20026176
Budhpur Nainsingh Village Water Supply
3
3
2899
2022
2037
2052
18-Aug-2024
18-Apr-2024
24-Jul-2024
25-Jul-2024
Approved
every thing completed.
Approved
Everything Completed
View
359
Kannauj
GVPR
20098274
BUNDHA NAGARIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
6
2282
2023
2038
2053
14-Nov-2024
02-Aug-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
360
Jhansi
NCC Ltd.
8010048
Burhpura GOV
59
21965
171000
2023
2038
2053
30-Jun-2022
30-Aug-2023
21-Apr-2025
22-Apr-2025
Approved
checked and forwarded
Approved
approved
View
361
Shahjahanpur
NCC Ltd.
20014889
CHAHARPUR Madnapur W/s
2
3
2460
2022
2037
2052
30-Sep-2024
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
362
Ayodhya
VSA
20091374
CHAITAWA WSS
1
9
3350
2023
2038
2053
20-Mar-2024
28-Oct-2024
28-Oct-2024
16-Jan-2025
Approved
FOUND OK
Pending
View
363
Fatehpur
Power Mech Projects Ltd
20097779
CHAK SHAHPIRPUR
2
3
2450
2023
2038
2053
14-May-2024
30-Jun-2025
12-Jul-2024
12-Aug-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024)
Approved
Verified
View
364
Gautam Buddha Nagar
LC INFRA
8389564
Chaksenpur Urf Dhanibas Water Supply Scheme
1
1
2339
2022
2037
2052
20-Mar-2023
30-Apr-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
365
Azamgarh
LC INFRA
20014621
CHANDA BHARI WATER SUPPLY SCHEME
1
7
3697
2022
2037
2052
10-Aug-2023
25-Dec-2023
29-Mar-2024
30-Mar-2024
Approved
OK
Approved
OK
View
366
Amethi
Vindhya-GAJA (JV)
20085683
CHANDAIPUR WATER SUPPLY SCHEME
2
7
2835
2023
2038
2053
29-Apr-2024
18-Jun-2024
18-Sep-2024
19-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
367
Ambedkar Nagar
Vindhya-GAJA (JV)
20060069
CHANDANPARA WSS
1
4
4393
2023
2038
2053
18-Jan-2024
06-Oct-2025
06-Oct-2025
07-Nov-2025
Approved
Scheme completed and ready for O&M
Pending
View
368
Ambedkar Nagar
Vindhya-GAJA (JV)
20019794
Chandapur
1
12
4680
2023
2038
2053
03-Aug-2023
02-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and Verified
Approved
Scheme completed
View
369
Bijnor
LC INFRA
20011741
Chandat TurakVillage Water Supply Scheme
5
5
4464
2021
2037
2052
10-Feb-2024
12-Dec-2024
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
370
Jaunpur
AFCONS
20050630
CHANDAUKI WATER SUPPLY SCHEME
2
9
3250
2023
2038
2053
31-Dec-2024
04-May-2024
10-Mar-2025
11-Mar-2025
Approved
Ok
Approved
approved
View
371
Ayodhya
UNIVERSAL MEP
20058259
Chandaura WSS
2
7
3840
2023
2038
2053
22-Jan-2024
18-May-2024
18-May-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
372
Kannauj
GVPR
20066504
CHANDIAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3965
2023
2038
2053
16-Aug-2024
31-Mar-2024
07-Mar-2024
07-Apr-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
373
Meerut
Power Mech Projects Ltd
20020216
CHANDLAWAR URF MAHALWALA
1
1
4999
2022
2037
2052
31-Dec-2024
20-Jan-2024
07-Jun-2024
03-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
374
Ambedkar Nagar
Vindhya-GAJA (JV)
20056458
CHANDPUR BHATPURA Water Supply Scheme
1
6
2520
2023
2038
2053
27-Dec-2022
26-Dec-2023
25-Mar-2025
26-Mar-2025
Approved
checked and verified
Approved
Scheme completed
View
375
Etawah
Indian Hume Pipe
20026426
Chandpura PWS
2
3
3339
2022
2037
2052
22-Sep-2023
21-Sep-2024
23-Dec-2024
24-Dec-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
376
Ayodhya
UNIVERSAL MEP
20031487
CHANDRAMAU MANGA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3090
2023
2038
2053
12-Oct-2023
05-Oct-2023
05-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
377
Auraiya
GVPR
20084723
Chapauli PWS
1
2
2112
2023
2038
2053
01-Jun-2024
12-Aug-2024
01-Mar-2025
02-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
378
Hardoi
NCC Ltd.
20000040
CHATHIYA DHAFRAPUR
2
4
2030
2022
2037
2052
29-Apr-2023
01-Jun-2023
01-Sep-2023
17-Dec-2024
Approved
ok
Approved
OK
View
379
Bahraich
PNC-SPML-JV
8375767
CHATTARPUR MAHASI PWS
1
5
4422
2022
2037
2052
31-Dec-2025
18-Sep-2025
18-Sep-2025
19-Sep-2025
Approved
Scheme send to O&M, but rectify all issues identify by TPI with in 15 days.
Approved
Scheme completed.
View
380
Ambedkar Nagar
Vindhya-GAJA (JV)
20041701
CHATURI PATTI WSS
2
3
3930
2023
2038
2053
23-Nov-2023
14-Jul-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
381
Ambedkar Nagar
Vindhya-GAJA (JV)
20096180
CHAUDHARYPUR BAURAW Water Supply Scheme
4
7
6610
2023
2038
2053
22-Mar-2024
20-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
382
Farrukhabad
Vindhya-GAJA (JV)
20097825
CHAUKI MOHAMMAD PUR SVS
1
1
2608
2023
2038
2053
30-May-2025
03-Feb-2024
18-May-2024
19-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
383
Bijnor
Vindhya-GAJA (JV)
20067422
Chaukpuri water supply scheme
1
1
2842
2022
2037
2052
06-Jul-2023
28-Nov-2023
04-Jun-2024
05-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
384
Gautam Buddha Nagar
LC INFRA
20094784
CHAUNA VILLAGE WATER SUPPLY SCHEME
1
1
2860
2022
2036
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
385
Siddharth Nagar
JAKSON - VISHVARAJ (JV)
20076416
CHAURASI AND JAGMOHANI GP WSS
3
5
2070
2023
2038
2053
01-Sep-2024
25-Mar-2025
25-Mar-2025
16-Sep-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
386
Bahraich
PNC-SPML-JV
6993692
Chetra SVS solar
1
7
3390
2022
2037
2052
30-Jun-2025
01-May-2024
01-May-2024
02-May-2024
Approved
OK
Approved
Scheme send to O&M, but rectify all issues identify by TPI with in 15 days.
View
387
Meerut
Power Mech Projects Ltd
20012907
CHHATRI
1
1
2046
2022
2037
2052
31-Dec-2024
04-Mar-2024
20-Mar-2024
08-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
388
Gautam Buddha Nagar
LC INFRA
8389553
CHHAYANSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3593
2022
2037
2052
20-Mar-2024
30-Jan-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
389
Shahjahanpur
NCC Ltd.
8362287
CHHIDKURI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
1
6
2790
2022
2037
2052
19-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chhidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
390
Fatehpur
Power Mech Projects Ltd
20100812
Chhitampur
1
3
3190
2023
2038
2053
20-Sep-2024
06-Oct-2024
06-Oct-2024
07-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (7.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
391
Ambedkar Nagar
Vindhya-GAJA (JV)
20083841
CHHITUNI WSS
1
8
2190
2023
2038
2053
26-Dec-2023
20-May-2025
19-May-2025
20-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
392
Shahjahanpur
NCC Ltd.
20015653
chikatiya
2
2
2270
2022
2037
2052
30-Sep-2023
31-Dec-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
393
Auraiya
GVPR
20094349
CHIKTA PWS
1
2
1975
2023
2038
2053
06-Jan-2022
31-Dec-2024
19-Feb-2024
07-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
394
Meerut
Power Mech Projects Ltd
8362365
CHINDAURI TAPPA LAWAR
1
1
4271
2022
2037
2052
31-Dec-2024
16-Sep-2024
02-Feb-2025
03-Feb-2025
Approved
Recommended for further Approvals.
Approved
APPROVED
View
395
Meerut
Power Mech Projects Ltd
20098174
CHINDORI KHAS-CHINDORI PATTI DALU
2
2
5287
2023
2038
2053
31-Dec-2024
26-Nov-2024
27-Aug-2024
28-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
396
Mau
GA INFRA-VPL
20096162
CHISTIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
1147
2023
2038
2053
20-Jan-2025
20-Jan-2025
19-Jan-2025
20-Jan-2025
Approved
APPROVED
Approved
APPROVED
View
397
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20035487
Chormara Kamalpur
6
12
4442
2022
2037
2052
17-Feb-2024
22-Apr-2024
09-Feb-2025
26-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
398
Gautam Buddha Nagar
LC INFRA
8361671
CHUHARPUR BANGAR VILLAGE WATER SUPPLY SCHEME
1
1
3690
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
399
Meerut
Power Mech Projects Ltd
20100948
DABATHUWA GARHI
1
1
1091
2023
2038
2053
31-Dec-2024
14-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
400
Meerut
Power Mech Projects Ltd
20058231
DADRI
1
1
5636
2022
2037
2052
31-Dec-2024
07-Aug-2024
24-Dec-2024
25-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
401
Ayodhya
UNIVERSAL MEP
20058061
DAFIYAPUR WSS
1
2
1700
2023
2038
2053
19-Mar-2024
05-Oct-2024
05-Oct-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
402
Meerut
Power Mech Projects Ltd
20098083
DAHAR
1
1
4648
2023
2038
2053
31-Jan-2025
14-Aug-2024
31-Dec-2024
01-Jan-2025
Approved
Recommended for further Approvals
Approved
Approved
View
403
Hardoi
NCC Ltd.
20012365
DAHEE
1
4
3470
2022
2037
2052
26-Jul-2023
20-Aug-2023
22-Nov-2023
07-Dec-2024
Approved
ok
Approved
OK
View
404
Kanpur Dehat
GVPR
20053196
DAHELI
2
0
2597
2023
2038
2053
18-Nov-2023
10-Dec-2023
20-Mar-2024
21-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
405
Kannauj
GVPR
20036649
DAHLEPUR BANGER & MAHAM BALIPUR GRAMIN PEYJAL YOJNA
2
3
2415
2023
2038
2053
13-May-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forw.arded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
406
Auraiya
GVPR
20099290
Dahnanang PWS
1
3
3105
2023
2038
2053
21-Jun-2024
03-Nov-2024
02-Nov-2024
04-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
407
Etawah
Indian Hume Pipe
20024531
Daipur PWS
1
2
1450
2022
2037
2052
22-Sep-2023
11-Oct-2023
11-Jan-2024
12-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
408
Kanpur Dehat
GVPR
20077276
Dalikpur Maharajpur & Bhitargaon
2
4
2496
2023
2038
2053
17-Feb-2024
13-Nov-2023
28-Mar-2024
29-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
409
Auraiya
GVPR
20099288
Damarpur PWS
1
1
3024
2023
2038
2053
06-Jan-2022
08-Sep-2023
18-Jul-2024
20-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
410
Ambedkar Nagar
Vindhya-GAJA (JV)
20084934
DANDI MAHMOODPUR WSS
3
3
2450
2023
2038
2053
20-Feb-2024
27-Nov-2024
27-Feb-2025
28-Feb-2025
Approved
scheme checked and verified
Approved
DANDI MAHMOODPUR SCHEME COMPLETED
View
411
Rampur
SPML Infra
20072616
DANIYAPUR SHANKARPUR SV W/S SCHEME
1
1
1745
2022
2037
2052
03-Aug-2024
08-May-2024
08-Aug-2024
09-Aug-2024
Approved
All docs found in order
Pending
View
412
Amethi
Gayatri Projects LTD
20072845
Daranagar & Sewara GP water supply scheme
2
7
4800
2022
2037
2052
10-Aug-2024
14-Jun-2024
14-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
413
Bijnor
LC INFRA
20011551
Darbar Water Supply Scheme
1
1
2661
2022
2037
2052
09-Feb-2022
12-Feb-2024
21-Aug-2024
22-Aug-2024
Approved
Every thing completed.
Approved
Everything Completed
View
414
Bijnor
LC INFRA
20013992
DARBARA WATER SUPPLY SCHEME
1
2
2927
2022
2037
2052
10-Feb-2024
27-Feb-2024
26-Aug-2024
27-Aug-2024
Approved
Every thing complete
Approved
All Documents checked and verified.
View
415
Mau
LC INFRA
20064258
Dariyabad Village Water Supply Scheme
1
3
1671
2022
2037
2052
27-Jul-2024
20-Apr-2025
02-Apr-2025
03-Apr-2025
Approved
Approved
Approved
Approved.
View
416
Kanpur Dehat
GVPR
20069899
dashahara sujanpur
1
4
4201
2023
2038
2053
17-Mar-2024
19-Dec-2023
03-May-2024
04-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
417
Auraiya
GVPR
20091074
Daspur PWS
1
2
2530
2023
2038
2053
01-Jun-2022
24-Feb-2024
07-Mar-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
418
Ayodhya
UNIVERSAL MEP
20058382
DASRATH MAU WSS
2
2
2790
2023
2038
2053
21-Jun-2024
01-Jan-2024
22-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
419
Azamgarh
LC INFRA
20101583
DASU PATTI WATER SUPPLY SCHEME
4
7
3274
2023
2038
2053
31-May-2023
14-Oct-2023
31-Jan-2024
01-Feb-2024
Approved
OK
Approved
OK
View
420
Ambedkar Nagar
Vindhya-GAJA (JV)
20019823
Daudpur
1
7
4470
2023
2038
2053
03-Aug-2023
23-Dec-2024
04-Apr-2025
05-Apr-2025
Approved
Checked and found ok
Approved
CHECKED AND FOUND OK
View
421
Kanpur Dehat
Indian Hume Pipe
20016926
Daulatpur
1
1
3140
2022
2037
2052
05-Feb-2022
04-Feb-2023
30-Apr-2023
01-May-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
422
Shahjahanpur
NCC Ltd.
20084102
DAULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2210
2022
2037
2052
31-Dec-2024
29-Aug-2024
28-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
423
Sultanpur
UNIVERSAL MEP
20097011
DAUNO AND JAGDISHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2600
2023
2038
2053
10-May-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
424
Ambedkar Nagar
Vindhya-GAJA (JV)
20068240
DAYAMPUR WSS
2
2
3200
2023
2038
2053
19-Feb-2024
28-Jul-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and found ok
Approved
Scheme completed
View
425
Kannauj
GVPR
20067638
DEBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
1078
2023
2038
2053
16-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
426
Kannauj
GVPR
20077117
DEDAURA KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2278
2023
2038
2053
08-Sep-2024
20-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
427
Bahraich
PNC-SPML-JV
20099558
DEEHA ASHOKA CHITTAURA RF MVS PWS
5
10
8330
2022
2037
2052
30-Jun-2025
25-Feb-2025
14-Nov-2023
25-Feb-2025
Approved
OK !
Approved
SCHEME COMPLETED
View
428
Lakhimpur Kheri
NCC Ltd.
8360568
Demouhra
1
4
3845
2022
2037
2052
09-Apr-2023
20-Jan-2023
19-Apr-2023
19-Nov-2024
Approved
Approved as per check list
Approved
Found ok
View
429
Kanpur Dehat
GVPR
20053230
Devgaon Chakkar Urf Nibhoo
1
2
2527
2023
2038
2053
18-Nov-2023
30-Nov-2023
23-Mar-2024
24-Mar-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
430
Kanpur Dehat
GVPR
20077335
Devipur & Jugrajpur Shiwali
4
4
3963
2023
2038
2053
17-Feb-2024
10-Jan-2024
15-Apr-2024
16-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
431
Ambedkar Nagar
Vindhya-GAJA (JV)
20067263
DEVRIYA BUJURG Water Supply Scheme
2
9
5350
2023
2038
2053
21-Feb-2024
31-Dec-2024
23-Jul-2025
24-Jul-2025
Approved
APPROVED
Approved
Scheme Completed
View
432
Fatehpur
Power Mech Projects Ltd
20097453
DEWARA
1
2
1310
2023
2038
2053
25-Sep-2024
30-Jun-2025
18-Dec-2024
19-Dec-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
433
Mau
LC INFRA
20064262
Dewariya Bujurg village water Supply Scheme
1
8
1433
2022
2037
2052
22-Mar-2025
16-Apr-2025
16-Apr-2025
17-Apr-2025
Approved
All mentioned details found ok.
Approved
Approved
View
434
Sultanpur
UNIVERSAL MEP
20064733
DHAHA FIROJPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2180
2023
2038
2053
12-Jan-2024
12-Jan-2024
16-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
435
Auraiya
GVPR
20040118
Dhakhli pur PWS
1
5
2492
2023
2038
2053
06-Jan-2024
05-Mar-2024
17-Apr-2024
19-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
436
Shahjahanpur
NCC Ltd.
20019672
Dhakia Elaqua Parwaizpur
2
2
2140
2022
2037
2052
31-Dec-2024
12-Apr-2024
12-Jul-2024
16-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhakia Elaqua Parwaizpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
Approved
All information on the portal for the completion certificate of Dhakiya Elaqua Parwaizpurscheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
437
Auraiya
GVPR
20089668
Dhamseni PWS
1
2
1500
2023
2038
2053
06-Jan-2022
26-Jul-2024
25-Jul-2024
27-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
438
Sultanpur
Vindhya-GAJA (JV)
20051916
DHANECH & JAKHANI KALAN WATER SUPPLY SCHEME
6
21
3190
2023
2038
2053
03-Dec-2022
02-Dec-2023
28-Dec-2024
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
439
Meerut
Power Mech Projects Ltd
20078466
DHANPURA
1
1
1654
2023
2038
2053
31-Dec-2024
01-Jun-2024
21-Oct-2024
22-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
440
Shahjahanpur
NCC Ltd.
20014806
DHARAMPUR KANJA
1
2
2150
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dharampur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Dharmpur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
441
Fatehpur
Power Mech Projects Ltd
20097512
DHARAMPUR SATO
1
21
9380
2023
2038
2053
25-Oct-2024
05-Sep-2024
24-Jan-2025
25-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October(25.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
442
Auraiya
Indian Hume Pipe
20014498
DHARKAN PWS
1
3
2200
2022
2037
2052
08-May-2023
25-Jun-2023
14-Oct-2023
15-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
443
Ambedkar Nagar
Vindhya-GAJA (JV)
20035121
DHARMA MUBARAK PATTI WSS
2
7
4750
2023
2038
2053
21-Oct-2023
20-Jun-2025
13-Oct-2025
14-Oct-2025
Approved
Checked and Found ok
Approved
CHECKED AND FOUND OK
View
444
Fatehpur
Power Mech Projects Ltd
20102035
DHARMGADPUR
1
1
1250
2023
2038
2053
20-Sep-2024
04-Sep-2024
04-Sep-2024
05-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (05.06.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
445
Moradabad
LC INFRA
20034964
Dhatura Megha Nagla Mustahkam village water supply scheme
1
1
7385
2022
2037
2052
01-Aug-2023
14-Jul-2025
19-Sep-2025
20-Sep-2025
Approved
Ok
Pending
View
446
Moradabad
NKG-PRIMUS (JV)
20058159
Dheengarpur Village Water Supply Scheme
3
3
7208
2023
2038
2053
31-Dec-2024
10-Jul-2024
10-Jan-2025
11-Jan-2025
Approved
Ok
Pending
View
447
Bijnor
LC INFRA
8360890
DHELA AHIR VILLAGE WATER SCHEME
2
2
4074
2022
2037
2052
29-Sep-2023
08-Dec-2023
06-Jun-2024
07-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
448
Meerut
Power Mech Projects Ltd
20031858
DHINDALA
1
1
2917
2023
2038
2053
31-Dec-2024
12-Mar-2024
29-Jul-2024
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
449
Auraiya
Indian Hume Pipe
20055688
Dhorera PWS
1
2
2150
2022
2037
2052
22-Sep-2023
25-Sep-2024
20-Dec-2025
03-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
450
Sultanpur
UNIVERSAL MEP
20066510
DHUSIYARIYA & RAMPUR MATHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
4210
2023
2038
2053
12-Jan-2024
31-Dec-2025
05-Mar-2025
01-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
451
Hardoi
NCC Ltd.
20012540
DIGHIA
2
7
2290
2022
2037
2052
26-Jul-2023
23-Sep-2023
22-Dec-2023
25-Dec-2024
Approved
ok
Approved
OK
View
452
Moradabad
LC INFRA
20064471
Dilra Raipur Village Water Supply Scheme
1
1
4085
2022
2037
2052
08-Feb-2024
25-Aug-2025
30-Sep-2025
01-Oct-2025
Approved
Ok
Pending
View
453
Ayodhya
UNIVERSAL MEP
20031497
DILWAL GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3550
2023
2038
2053
12-Oct-2023
12-Mar-2024
12-Mar-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
454
Meerut
Power Mech Projects Ltd
20011064
DIMOLI
1
1
2543
2022
2037
2052
31-Dec-2024
05-Mar-2024
16-Jul-2023
29-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
455
Muzaffarnagar
Gayatri Projects LTD
20022067
Dinkarpur
1
1
3691
2022
2037
2053
16-Sep-2022
25-Sep-2023
25-Dec-2023
26-Dec-2023
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
456
Kannauj
GVPR
20077099
DISARAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1718
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
457
Shahjahanpur
NCC Ltd.
20084152
DIURAS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
3000
2022
2037
2052
31-Dec-2024
09-Mar-2023
06-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days
Approved
All information on the portal for the completion certificate of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
458
Auraiya
GVPR
20025455
DIVARI PWS
1
4
3049
2023
2038
2053
01-Jun-2022
09-Feb-2023
24-Jun-2023
09-Mar-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
459
Auraiya
GVPR
20088702
Dobaa Mafi PWS
1
9
6146
2023
2038
2053
01-Jun-2024
13-Apr-2024
25-Feb-2024
13-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
460
Ayodhya
UNIVERSAL MEP
20058272
Dooli Askaran WSS
2
9
3190
2023
2038
2053
22-Jan-2024
15-Jun-2024
15-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
461
Kanpur Dehat
GVPR
20086224
Duda Mahua
1
2
1210
2023
2038
2053
17-Feb-2024
01-Jan-2024
10-Apr-2024
11-Apr-2024
Approved
forward for further action
Approved
All work of scheme found satisfactory
View
462
Shahjahanpur
NCC Ltd.
20077474
DUDHAUNA WSS
1
3
2810
2022
2037
2052
20-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
463
Ambedkar Nagar
Vindhya-GAJA (JV)
20042858
DULHUPUR KALA WSS
1
5
4640
2023
2038
2053
23-Nov-2023
20-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
464
Bijnor
LC INFRA
8388706
DULI CHANDPUR VILLAGE WATER SUPPLY SCHEME
1
1
2810
2022
2037
2052
23-Sep-2021
24-Oct-2024
25-Jan-2025
26-Jan-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
465
Meerut
Power Mech Projects Ltd
20085472
DUNGAR RO
1
1
3100
2022
2037
2052
31-Dec-2024
10-Feb-2024
26-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
466
Kanpur Dehat
GVPR
20077488
DURGA PURWA
2
3
2129
2023
2038
2053
17-Feb-2024
14-Nov-2023
29-Mar-2024
30-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
467
Farrukhabad
Vindhya-GAJA (JV)
20097902
DURGU PUR SVS
1
1
1284
2023
2038
2053
30-May-2025
20-Jan-2024
04-May-2024
05-May-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
Ok
View
468
Meerut
Power Mech Projects Ltd
20098105
DURJANPUR
1
1
943
2022
2037
2052
31-Dec-2024
12-Apr-2024
30-Aug-2024
01-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
469
Ayodhya
UNIVERSAL MEP
20031482
DWARIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2120
2023
2038
2053
12-Oct-2023
12-Dec-2023
12-Dec-2023
15-Nov-2024
Approved
FOUND OK
Pending
View
470
Fatehpur
Power Mech Projects Ltd
20097455
EKDALA
1
1
2572
2023
2038
2058
15-May-2023
30-Jun-2025
18-Dec-2024
19-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
471
Ambedkar Nagar
Vindhya-GAJA (JV)
20058784
EKDALLA, SABUKPUR WSS
2
8
6820
2023
2038
2053
26-Dec-2025
24-Jul-2025
09-Nov-2025
10-Nov-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
472
Auraiya
GVPR
20089638
Ekgara bidhuna PWS
1
8
3718
2023
2038
2053
01-Jun-2024
08-Jul-2024
07-Jul-2024
09-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
473
Sultanpur
UNIVERSAL MEP
20066895
EKLAKHI & SEVKARI GRAM PANCHAYAT WATER SUPPLY SCHEME
5
14
4160
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
474
Shahjahanpur
NCC Ltd.
20015359
ENDEYPUR WSSS
3
3
2790
2022
2037
2052
13-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of ENDEYPUR W/S scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Endeypur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
475
Kanpur Dehat
GVPR
20069958
enjua rampur
1
0
1846
2023
2038
2053
17-Feb-2024
19-Dec-2023
03-May-2024
04-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
476
Shahjahanpur
NCC Ltd.
20015311
ETAURA DADROL w/s
1
2
2140
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
477
Meerut
Power Mech Projects Ltd
20058352
FAIZABAD PACHGAON ,SALEH NAGAR & JOHRA
3
3
3886
2023
2038
2053
31-Dec-2024
12-Aug-2024
29-Dec-2024
31-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
478
Auraiya
Indian Hume Pipe
20033764
Faizullapur PWS
3
3
2200
2022
2037
2052
22-Sep-2023
25-Jul-2023
16-Nov-2023
17-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
479
Meerut
Power Mech Projects Ltd
20013156
FAKARPUR KURI GANGHERI
3
3
4475
2022
2037
2052
31-Dec-2024
20-Dec-2022
10-May-2023
17-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
480
Auraiya
GVPR
20091173
Fareha PWS
1
3
1834
2023
2038
2053
01-Jun-2022
17-Oct-2024
16-Oct-2024
18-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
481
Kannauj
GVPR
20067612
FARIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3728
2023
2038
2053
16-Aug-2024
28-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
482
Bijnor
LC INFRA
20026179
Fatahpur Ahtmali Village Water Supply
5
5
2514
2022
2037
2052
18-Aug-2022
18-Sep-2024
19-Dec-2024
20-Dec-2024
Approved
Every thing complete.
Approved
Every thing is Completed.
View
483
Meerut
Power Mech Projects Ltd
20098984
FATEHPUR WATER SUPPLY SCHEME
1
1
597
2023
2038
2053
31-Dec-2024
06-May-2024
24-Sep-2024
17-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
484
Bijnor
LC INFRA
20011559
Fatehullahpur Dargoo Village Water Supply Scheme
2
2
2231
2022
2037
2052
10-Feb-2024
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Everything Complete.
View
485
Ambedkar Nagar
Vindhya-GAJA (JV)
20026122
FATTEPUR KAKARDILA WATER SUPPLY SCHEME
2
12
3310
2023
2038
2053
28-Sep-2023
12-Oct-2024
11-Jan-2025
12-Jan-2025
Approved
checked and verified
Approved
SCHEME COMPLETED
View
486
Kannauj
GVPR
20067643
FEEROJPUR TERAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2508
2023
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance
View
487
Ayodhya
UNIVERSAL MEP
20030477
FIROZPUR MAKHDOOMI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
17
8360
2023
2038
2053
12-Oct-2023
26-Dec-2023
26-Dec-2023
01-Feb-2025
Approved
FOUND OK
Pending
View
488
Auraiya
GVPR
20039829
Gadanpur &singlamau pws
3
4
3646
2033
2038
2053
06-Jan-2022
05-Jun-2024
04-Jun-2024
05-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
489
Kannauj
GVPR
20098277
GADANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
2568
2023
2038
2053
14-Nov-2024
23-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
490
Ayodhya
VSA
20061550
GADAULI WSS
2
7
3060
2023
2038
2053
20-Feb-2024
05-Jun-2024
05-Jun-2024
15-Dec-2024
Approved
Found OK
Approved
Found Correct
View
491
Ayodhya
UNIVERSAL MEP
20058492
Gaddopur & Jagdeshpur WSS
2
14
4460
2023
2038
2053
22-Jan-2024
05-Dec-2024
05-Dec-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
492
Azamgarh
LC INFRA
20014130
GADHAN KHURD WATER SUPPLY SCHEME
1
5
2962
2022
2037
2052
31-May-2023
15-Jan-2024
17-Apr-2024
18-Apr-2024
Approved
OK
Approved
OK
View
493
Kannauj
GVPR
20036192
GADIA BALIDATPUR GRAMIN PEYJAL YOJNA
3
6
4408
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
494
Farrukhabad
Vindhya-GAJA (JV)
20093053
GADIYA HAIBATPUR SVS
1
4
2604
2023
2038
2053
30-May-2025
07-Feb-2024
22-May-2024
23-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
495
Mau
LC INFRA
20058572
Gagaupur Rural Village Water Supply Scheme
2
6
2701
2022
2037
2052
02-Aug-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
approve
View
496
Kanpur Dehat
Indian Hume Pipe
20034280
GAHLOO
1
3
2210
2022
2037
2052
24-Nov-2022
31-Dec-2024
18-Apr-2024
01-May-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
497
Amethi
Vindhya-GAJA (JV)
20070878
GAIMAU WATER SUPPLY SCHEME
1
6
1965
2023
2038
2053
23-Mar-2024
07-Jun-2024
07-Sep-2024
08-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
498
Farrukhabad
Vindhya-GAJA (JV)
20076678
GAISINGHPUR SVS
1
2
2592
2023
2038
2053
30-May-2025
23-May-2025
23-May-2024
24-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
499
Bijnor
LC INFRA
20018248
Gajipur Water Supply Scheme
2
2
3256
2022
2037
2052
26-Jan-2025
26-Jan-2025
26-Jan-2025
27-Jan-2025
Approved
Every thing completed.
Approved
Everything Complete.
View
500
Bahraich
PNC-SPML-JV
7620547
Gajpatipur Pws
1
22
6290
2022
2037
2052
30-Jun-2025
14-Jun-2025
19-May-2024
15-Jun-2025
Approved
approved
Approved
scheme completed
View
501
Kanpur Dehat
Indian Hume Pipe
20025512
Galuapur
1
1
2390
2022
2037
2052
25-Aug-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
502
Meerut
Power Mech Projects Ltd
20020769
GANESHPUR
2
2
5688
2022
2037
2052
31-Dec-2024
26-May-2024
30-Oct-2024
31-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
503
Ayodhya
UNIVERSAL MEP
20031484
GANESHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4270
2023
2038
2053
12-Oct-2023
31-Jan-2024
31-Jan-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
504
Gorakhpur
NCC Ltd.
8361112
Ganeshpur WATER SUPPLY SCHEME
4
4
2142
2022
2037
2052
11-Feb-2023
10-Oct-2022
06-Oct-2022
06-Jan-2023
Approved
testttt
Approved
Approved
View
505
Farrukhabad
Vindhya-GAJA (JV)
20081341
GANGAICH & NARAINPUR MVS
2
4
3408
2023
2038
2053
31-Mar-2025
18-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
OK
View
506
Ayodhya
VSA
20096900
GANGAPUR MU RAMAIPUR WSS
4
12
1530
2023
2038
2053
20-Mar-2024
28-Nov-2024
28-Nov-2024
06-May-2025
Approved
FOUND OK
Pending
View
507
Amethi
Vindhya-GAJA (JV)
20068067
GANGAULI & GHAGUGHAR WATER SUPPLY SCHEME
1
13
4152
2023
2038
2053
23-Mar-2023
20-Jun-2024
20-Sep-2024
21-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
508
Mau
GA INFRA-VPL
20100987
GANGUWABARI & TIGHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
9
3240
2023
2038
2053
30-May-2025
14-Apr-2025
14-Apr-2025
15-Apr-2025
Approved
Approved
Approved
Approved
View
509
Bijnor
LC INFRA
8388856
GANURA JALALPUR SULTAN GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
3029
2022
2037
2052
29-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
every thing completed
View
510
Amethi
Vindhya-GAJA (JV)
20101973
GARHA MAFI WATER SUPPLY SCHEME
1
6
1883
2023
2038
2053
04-Jul-2024
13-Nov-2024
13-Feb-2025
13-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
511
Kanpur Dehat
GVPR
20086506
garhi mahera
1
4
2453
2023
2038
2053
15-Apr-2024
25-Jan-2024
02-May-2024
03-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
512
Kannauj
GVPR
20036142
GARHIYA PAH GRAMIN PEYJAL YOJNA
2
5
2988
2023
2038
2053
16-May-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
513
Meerut
Power Mech Projects Ltd
20037230
GARINA
1
1
4765
2022
2037
2052
31-Dec-2024
06-Feb-2024
25-Jun-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
514
Shahjahanpur
NCC Ltd.
20014024
Gariya Chhavi W/s
1
8
2797
2022
2037
2052
30-Aug-2023
31-Dec-2024
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
515
Amethi
Vindhya-GAJA (JV)
20068335
GARTHOLIYA & LOHANG PUR WATER SUPPLY SCHEME
2
13
4186
2023
2038
2053
08-Feb-2024
06-Jun-2024
06-Sep-2024
07-Dec-2024
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
516
Ayodhya
VSA
20051266
GAURA & CHAKSENPUR
2
7
3800
2023
2038
2053
23-Nov-2023
31-Mar-2025
28-Mar-2025
05-Apr-2025
Approved
FOUND OK
Pending
View
517
Sultanpur
UNIVERSAL MEP
20066978
GAURA BARAMAU & BHAKHARI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
5847
2023
2038
2053
12-Jan-2024
12-Jan-2024
28-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
518
Fatehpur
Power Mech Projects Ltd
20097810
GAURI , KESHOPUR MALAHIA
6
14
4030
2023
2038
2053
14-May-2024
30-Jun-2025
01-Sep-2025
10-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (11.10.2024).
Approved
Verified
View
519
Fatehpur
Power Mech Projects Ltd
20097459
GEDURI
1
1
1880
2023
2038
2053
20-Sep-2024
02-Oct-2024
02-Oct-2024
03-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (03.07.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
520
Meerut
Power Mech Projects Ltd
20010902
GEJHA
1
1
3540
2022
2019
2052
20-Jul-2024
31-Dec-2024
13-Dec-2024
14-Dec-2024
Approved
Recommended for further Approvals.
Pending
View
521
Kanpur Dehat
Indian Hume Pipe
20025609
Genda Mau
1
2
2350
2022
2037
2052
25-Aug-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
522
Meerut
Power Mech Projects Ltd
20076654
GESUPUR BAPHAWAT
1
1
2363
2023
2038
2053
31-Dec-2024
14-Aug-2024
03-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
523
Meerut
Power Mech Projects Ltd
20083009
GESUPUR SUMARLI
1
1
3037
2022
2037
2052
11-Jun-2025
05-May-2024
20-Sep-2024
11-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
524
Fatehpur
Power Mech Projects Ltd
20100806
GHANGHAOL
1
1
3970
2023
2038
2053
20-Sep-2024
19-Feb-2025
19-Feb-2025
20-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (20.11.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
525
Fatehpur
Power Mech Projects Ltd
20097460
GHARWASIPUR
1
1
1820
2023
2038
2058
14-Aug-2023
30-Jun-2025
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
526
Fatehpur
Power Mech Projects Ltd
20097813
GHURI BUJURG
2
2
1840
2023
2038
2053
23-Jan-2025
22-Sep-2024
07-Feb-2025
08-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (08.11.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
527
Sultanpur
Vindhya-GAJA (JV)
20069780
GHURIPUR WATER SUPPLY SCHEME
2
2
2290
2023
2038
2053
05-Feb-2024
23-Mar-2025
23-Mar-2025
21-Jun-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
528
Kannauj
GVPR
20067381
GIRGHARPUR & SIKANDERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3141
2023
2038
2053
16-Aug-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
529
Sultanpur
UNIVERSAL MEP
20066948
GODVA & RAMNAGAR KOT GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
4090
2023
2038
2053
12-Jan-2024
12-Jan-2024
22-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
530
Kannauj
GVPR
20036497
GOORA & MURAIYA GRAMIN PEYJAL YOJNA
2
5
6441
2023
2038
2053
13-May-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
531
Auraiya
GVPR
20099255
Gopalpur & Ranipur PWS
1
2
3390
2023
2038
2053
01-Jun-2024
30-Apr-2024
29-Apr-2024
01-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
532
Kanpur Dehat
Indian Hume Pipe
20034281
GOPALPUR TALUKA
1
3
2270
2022
2037
2052
23-Nov-2023
31-Dec-2024
28-Feb-2024
01-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
533
Bijnor
LC INFRA
20014035
GOPALPUR WATER SUPPLY SCHEME
1
3
2647
2022
2037
2052
02-Nov-2023
01-Jul-2024
29-Dec-2024
30-Dec-2024
Approved
Every thing complete.
Approved
all document comepete
View
534
Kannauj
GVPR
20043932
GORAKHPUR HARBHANPUR GRAMIN PEYJAL YOJNA
1
7
5504
2023
2038
2053
13-May-2024
28-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
535
Meerut
Power Mech Projects Ltd
20082936
GOTKA DHANAWALI
2
2
4477
2022
2037
2052
31-Dec-2024
31-Oct-2024
01-Aug-2024
01-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
536
Meerut
Power Mech Projects Ltd
20068678
GOVINDPUR & KHARKHARI
2
2
3616
2022
2037
2052
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
537
Meerut
Power Mech Projects Ltd
20011580
GOVINDPUR URF GHASAULI
1
1
4953
2022
2037
2052
31-Dec-2024
04-Feb-2023
23-Jun-2023
15-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
538
Fatehpur
Power Mech Projects Ltd
20095838
GOVINDPUR&GHOSHI
5
5
4200
2023
2038
2053
15-May-2023
30-Jun-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
539
Meerut
Power Mech Projects Ltd
20076748
GOVINDPURI
1
1
2838
2022
2037
2052
31-Dec-2024
30-Jun-2024
16-Nov-2024
17-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
540
Shahjahanpur
NCC Ltd.
20019675
Gowar Sanda
1
2
2780
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All documents uploaded on the portal for the Project completion certificate of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
541
Fatehpur
Power Mech Projects Ltd
20097513
GUDAURA
1
2
3500
2023
2038
2053
18-Mar-2025
30-Jun-2025
26-Jan-2025
27-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
542
Farrukhabad
Vindhya-GAJA (JV)
20076924
GUDERA SVS
1
5
3020
2023
2038
2053
30-May-2025
13-Feb-2024
28-May-2024
29-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
water supply regular in all villages
View
543
Kannauj
GVPR
20067673
GUDHANI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
2500
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
544
Shahjahanpur
NCC Ltd.
20019678
Gulam Khera
1
1
2430
2022
2037
2052
14-Dec-2023
31-Dec-2024
14-Mar-2024
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gulam khera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Gulam Kheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
545
Jhansi
NCC Ltd.
8009992
Gulara GOV
42
10600
63447
2023
2038
2053
30-Jun-2022
30-Aug-2023
19-Nov-2024
20-Nov-2024
Approved
Checked
Approved
checked and approved
View
546
Bahraich
PNC-SPML-JV
20099230
GULHARIYA GAZIPUR KAISARGANJ RF PWS
1
29
7540
2022
2037
2052
31-Dec-2025
05-Nov-2025
05-Nov-2025
06-Nov-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0312, kindly complete it.
Pending
View
547
Auraiya
Indian Hume Pipe
20014861
GURA PWS
2
6
1750
2022
2037
2052
08-May-2023
01-Aug-2023
07-Nov-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
548
Hardoi
NCC Ltd.
20092452
GURAULI
1
2
3300
2022
2037
2052
05-Mar-2023
22-Mar-2023
21-Jun-2023
24-Dec-2024
Approved
ok
Approved
OK
View
549
Shahjahanpur
NCC Ltd.
20018478
Guravava
1
1
2820
2022
2037
2052
20-Jul-2023
31-Dec-2024
27-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of GURGAVA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Gurgawan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
550
Baghpat
LC INFRA
8362576
GWALI KHERA
1
1
2269
2022
2037
2052
31-Dec-2024
06-Nov-2023
06-Nov-2023
07-Nov-2023
Approved
Check and found Satisfactory.
Approved
OK
View
551
Meerut
Power Mech Projects Ltd
8362167
GYANPUR
1
1
3288
2022
2037
2052
17-Jan-2023
31-Dec-2024
05-May-2023
07-Oct-2024
Approved
Recommended for further Approval
Pending
View
552
Kannauj
GVPR
20036274
GYANPUR GRAMIN PEYJAL YOJNA
1
5
2801
2023
2038
2053
13-May-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
553
Hardoi
NCC Ltd.
20012213
Haidarpur
2
3
2510
2022
2037
2052
26-Jul-2023
03-May-2023
04-Aug-2023
13-Dec-2024
Approved
ok
Approved
OK
View
554
Sultanpur
UNIVERSAL MEP
20064688
HAJIPATTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
7170
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
555
Moradabad
LC INFRA
8360500
Hajipur
1
2
3370
2022
2037
2052
19-Sep-2023
21-Dec-2023
21-Mar-2024
22-Mar-2024
Approved
Ok
Pending
View
556
Ambedkar Nagar
Vindhya-GAJA (JV)
20081283
HAJPURA WSS
1
2
2180
2023
2038
2053
15-Mar-2024
22-Dec-2024
23-Mar-2025
24-Mar-2025
Approved
Checked and found OK
Approved
Scheme completed
View
557
Ayodhya
UNIVERSAL MEP
20030159
HALIM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
5140
2023
2038
2053
12-Oct-2023
30-Oct-2023
30-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
558
Etawah
Indian Hume Pipe
20024534
Haluhrjipur
1
3
1900
2022
2037
2052
22-Sep-2023
26-Feb-2024
06-Jun-2024
07-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
559
Kannauj
GVPR
20036200
HAMIRPUR GRAMIN PEYJAL YOJNA
4
5
2965
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
560
Farrukhabad
Vindhya-GAJA (JV)
20076885
HAMIRPUR KHAS SVS
1
4
4364
2023
2038
2053
31-Mar-2025
21-Jan-2024
05-Jun-2024
06-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
water supply i regular in all connected villages
View
561
Auraiya
GVPR
20084713
Hamirpur ruru
3
6
2872
2023
2038
2053
06-Jan-2022
28-Mar-2024
27-Mar-2024
28-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
562
Bijnor
LC INFRA
8359688
HANSU PURA HARKISHANPUR VILLAGE WATER SCHEME
1
1
7489
2022
2037
2052
26-Aug-2023
19-Dec-2023
07-Jun-2024
08-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
563
Bijnor
LC INFRA
20011793
Hara Ahmad Pur Jalal Water Supply Scheme
1
1
1532
2022
2037
2052
10-Feb-2024
12-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
564
Sultanpur
Vindhya-GAJA (JV)
20078808
HARAHA WSS
2
7
1573
2023
2038
2053
25-Mar-2023
23-Mar-2024
30-Jan-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
565
Ambedkar Nagar
Vindhya-GAJA (JV)
20058508
HARAKPUR KAURAHA Water Supply Scheme
3
8
2310
2023
2038
2052
16-Jul-2023
19-May-2025
19-May-2025
20-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
566
Hamirpur
PNC-SPML-JV
8135500
Haraulipur GOV and Tubewell Scheme 125 Nos.
39
51
57818
2023
2038
2053
14-Oct-2022
30-Sep-2024
18-Nov-2024
19-Nov-2024
Approved
Approved ,checklist of doc’c Uploaded at portal
Approved
Approve
View
567
Auraiya
GVPR
20041744
HARBANSHPUR PWS
2
1
2325
2023
2038
2053
01-Jun-2023
06-Dec-2024
30-Apr-2024
16-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
568
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008680
Hardiha
6
9
4430
2022
2037
2052
07-Jan-2022
30-May-2025
27-Jan-2025
28-Jan-2025
Approved
SCHEME COMPLETED
Approved
Scheme completed
View
569
Baghpat
LC INFRA
20014202
Haria Khera W/S SCHEME
1
1
4301
2022
2037
2052
31-Dec-2024
06-Nov-2023
06-Nov-2023
07-Nov-2023
Approved
Found ok
Approved
OK
View
570
Ayodhya
UNIVERSAL MEP
20030707
HARIBANDHAN PUR & ISMAIL NAGAR SINHORA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
5
19
3870
2023
2038
2053
12-Oct-2023
23-Oct-2023
23-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
571
Ayodhya
UNIVERSAL MEP
20030102
HARIHARPUR BALIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3950
2023
2038
2053
12-Oct-2023
05-Oct-2023
05-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
572
Ambedkar Nagar
Vindhya-GAJA (JV)
20019768
Harinathpur
3
6
2480
2023
2038
2053
03-Aug-2023
22-Jun-2023
30-Nov-2024
01-Dec-2024
Approved
Approved by TPI
Approved
Scheme completed
View
573
Sultanpur
UNIVERSAL MEP
20066127
HARKHI DOULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
2330
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
574
Farrukhabad
Vindhya-GAJA (JV)
20081706
HARSINGHPUR GAHILWAR & GALAR PUR MVS
2
2
3209
2023
2038
2053
30-May-2025
10-Feb-2024
25-May-2024
26-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
575
Rampur
SPML Infra
20090708
HARSU NAGLA SV GP W/S Scheme
1
1
1230
2022
2037
2052
29-Sep-2024
19-Jun-2024
19-Sep-2024
20-Sep-2024
Approved
All docs found in order
Pending
View
576
Bijnor
LC INFRA
8361850
HASANPUR BILLOCH VILLAGE WATER SCHEME
1
1
3435
2022
2037
2052
26-Aug-2021
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
Complete Check
View
577
Bijnor
LC INFRA
20017182
HASANPUR PALKI WATER SUPPLY SCHEME
1
1
1159
2022
2037
2052
10-Feb-2022
07-Dec-2023
05-Jun-2024
06-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
578
Meerut
Power Mech Projects Ltd
20016924
HASANPUR QADIM
1
1
5729
2022
2037
2052
31-Dec-2024
15-Dec-2022
06-May-2023
05-Nov-2024
Approved
checked and verified...................................
Approved
approved
View
579
Ambedkar Nagar
Vindhya-GAJA (JV)
20058532
HASANPUR SUNTHAR Water Supply Scheme
1
7
2270
2023
2038
2053
26-Dec-2023
22-Aug-2024
24-Nov-2024
25-Nov-2024
Approved
Scheme completed and ready for O&M
Approved
HASANPUR SUNTHAR SCHEME COMPLETED
View
580
Azamgarh
LC INFRA
20058071
Hasanpur water supply scheme
2
3
3208
2023
2038
2053
09-May-2024
22-Jul-2024
21-Oct-2024
22-Oct-2024
Approved
ok
Approved
OK
View
581
Fatehpur
Power Mech Projects Ltd
20097818
HASIMPUR MADEPUR
2
3
754
2023
2038
2059
25-Sep-2024
30-Jun-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December(24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
582
Ambedkar Nagar
Vindhya-GAJA (JV)
20035268
HATHINARAJ WSS
1
2
6270
2023
2038
2053
22-Oct-2022
21-Oct-2023
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
Scheme completed
View
583
Kanpur Dehat
GVPR
20069940
Hike pur
1
4
1760
2023
2038
2053
17-Feb-2024
30-Dec-2023
03-Apr-2024
04-Apr-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
584
Hardoi
NCC Ltd.
20012221
Hinguapur
1
1
1490
2022
2037
2052
27-Jan-2022
11-Sep-2023
11-Dec-2023
30-Nov-2024
Approved
ok
Approved
OK
View
585
Ghaziabad
LC INFRA
20018966
HIRDAYPUR MADAULA PWS SCHEME
1
1
3100
2022
2037
2052
27-Aug-2021
31-Oct-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
586
Farrukhabad
Vindhya-GAJA (JV)
20093133
HOTEPUR MVS
1
3
2488
2023
2038
2053
30-May-2025
09-Feb-2024
24-May-2024
25-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
587
Bahraich
PNC-SPML-JV
20016644
HTWA GOPAL PAYAGPUR PWS
1
4
3817
2022
2037
2052
31-Dec-2025
09-Nov-2025
01-May-2024
10-Nov-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0313, kindly complete it.
Pending
View
588
Ayodhya
UNIVERSAL MEP
20031474
Hunhuna Gram Panchayat Water Supply Scheme
1
2
2450
2023
2038
2053
12-Oct-2023
30-Dec-2023
30-Dec-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
589
Shahjahanpur
NCC Ltd.
8388648
HUSENPUR KAVRA
1
1
2590
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
590
Bijnor
LC INFRA
8360397
HUSENPUR KHASA VILLAGE WATER SCHEME
1
1
3266
2022
2037
2052
30-Sep-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
591
Azamgarh
LC INFRA
20057908
Husenpur water supply scheme
4
8
2706
2023
2038
2053
09-May-2024
20-Aug-2024
20-Nov-2024
21-Nov-2024
Approved
ok
Approved
OK
View
592
Kannauj
GVPR
20067729
HUSHE PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1463
2023
2038
2053
08-Sep-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
593
Ayodhya
UNIVERSAL MEP
20030150
IBBRAHIM PUR DEWALI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
2733
2023
2038
2053
12-Oct-2023
21-Jan-2024
21-Jan-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
594
Kannauj
GVPR
20067365
IBRAHIMPUR BANGER & AKBARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
5346
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
595
Meerut
Power Mech Projects Ltd
20078428
IKLA
1
1
1618
2022
2037
2052
31-Dec-2024
25-May-2024
09-Oct-2024
01-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
596
Auraiya
Indian Hume Pipe
8359385
Ikorapur
1
1
2870
2022
2037
2052
14-Sep-2022
15-May-2023
28-Oct-2023
29-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
597
Meerut
Power Mech Projects Ltd
20098082
IKWARA
1
1
2319
2023
2038
2053
31-Jan-2025
28-May-2024
15-Oct-2024
01-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
598
Muzaffarnagar
Gayatri Projects LTD
20022206
ILLAHBANS
1
1
3500
2022
2037
2052
16-Sep-2022
06-Oct-2023
06-Jan-2024
07-Jan-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
599
Sultanpur
UNIVERSAL MEP
20066569
IMILIYA KALAN & IMILIYA KHURD GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
15
4320
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
600
Mau
LC INFRA
20012739
IMILIYADIH GP WATER SUPPLY SCHEME
1
2
1647
2022
2037
2052
23-Sep-2024
22-Apr-2025
22-Apr-2025
23-Apr-2025
Approved
Approved
Approved
Approved.
View
601
Kanpur Dehat
Indian Hume Pipe
20050279
Ingwara
2
2
1730
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Sep-2023
01-Oct-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
602
Fatehpur
Power Mech Projects Ltd
20100815
IRADADPUR DHARMGADPUR
3
4
2330
2023
2038
2058
14-Aug-2023
30-Jun-2025
01-Dec-2024
02-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
603
Muzaffarnagar
JMC - Lakshmi (JV)
8360313
Islamabad
1
1
1968
2022
2037
2052
16-Mar-2021
07-Jul-2024
07-Oct-2024
08-Oct-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
APPROVED
View
604
Gautam Buddha Nagar
LC INFRA
20017812
ISMAIL NAGAR URF BHOYRA
1
1
2811
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Pending
View
605
Kannauj
GVPR
20036253
ISMAILPUR DIGAN GRAMIN PEYJAL YOJNA
2
5
3233
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
606
Amethi
Gayatri Projects LTD
20099327
ISMAILPUR WATER SUPPLY SCHEME
3
5
2799
2022
2037
2052
24-Nov-2024
17-Jun-2024
19-Sep-2024
28-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
607
Shahjahanpur
NCC Ltd.
20019349
ITAULI
2
2
2260
2022
2037
2052
31-Dec-2024
24-May-2024
23-Aug-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Itauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Itauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
608
Meerut
Power Mech Projects Ltd
20019647
ITAYIRA
1
1
2759
2022
2037
2052
31-Dec-2024
09-Mar-2024
08-Feb-2024
11-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
609
Ambedkar Nagar
Vindhya-GAJA (JV)
20026085
ITWAN WATER SUPPLY SCHEME
1
3
3440
2023
2038
2053
04-Aug-2023
20-Jul-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
610
Meerut
Power Mech Projects Ltd
20098089
JAFARNAGAR BEGAN
1
1
2174
2023
2038
2053
31-Dec-2024
06-Aug-2024
23-Dec-2024
24-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
611
Kannauj
GVPR
20036157
JAFRABAD GRAMIN PEYJAL YOJNA
1
6
4144
2023
2038
2053
13-May-2024
07-Mar-2024
10-Jun-2024
11-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
612
Auraiya
GVPR
20064605
Jaganpur and bhureypur kalan PWS
3
1
3370
2023
2038
2053
06-Jan-2022
03-May-2024
17-Mar-2024
03-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
613
Auraiya
GVPR
20093717
Jagatpur & harchandpur PWS
1
1
2676
2023
2038
2053
06-Jan-2022
20-Jun-2024
03-May-2024
21-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
614
Kanpur Dehat
GVPR
20077379
JAGDISHPUR & RAMPUR TAPPEWAN
4
7
3164
2023
2038
2053
17-Feb-2024
06-Dec-2023
20-Jan-2024
21-Jan-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
615
Ambedkar Nagar
Vindhya-GAJA (JV)
20043878
JAGDISHPUR KAPLESHVAR WSS
1
4
4950
2023
2038
2053
23-Nov-2023
27-Jul-2025
16-Nov-2025
17-Nov-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
616
Bijnor
LC INFRA
20026244
Jagdishpur Village Water Supply
1
1
1967
2022
2037
2052
10-Feb-2022
26-Apr-2024
25-Jan-2025
26-Jan-2025
Approved
Every thing complete.
Approved
Every thing is completed.
View
617
Sultanpur
Vindhya-GAJA (JV)
20078074
JAGDISHPUR WSS
1
5
3800
2023
2038
2053
12-Sep-2024
02-Dec-2024
06-Feb-2025
01-Nov-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
O&M start date 01/11/2025
View
618
Hardoi
NCC Ltd.
20012228
Jagrauli
1
2
2060
2022
2037
2052
26-Jul-2023
28-May-2023
29-Aug-2023
07-Dec-2024
Approved
ok
Approved
OK
View
619
Auraiya
GVPR
20089628
Jagupur & Purwa Patti PWS
2
9
3447
2023
2038
2053
06-Jan-2022
24-Apr-2024
21-Apr-2024
23-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
620
Farrukhabad
Vindhya-GAJA (JV)
20091347
JAHANGIRPUR & RAYPUR MVS
2
3
3452
2023
2038
2053
30-May-2025
28-Jun-2024
11-Oct-2024
12-Oct-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
621
Bijnor
LC INFRA
20026115
Jahangirpur khas Village Water Supply
1
3
2323
2022
2037
2052
31-Dec-2024
26-Nov-2023
28-May-2024
29-May-2024
Approved
every thing is completed
Approved
Every thing is completed
View
622
Ghaziabad
LC INFRA
20021552
JAHANGIRPUR PWS SCHEME
1
1
6459
2022
2037
2052
20-Sep-2021
30-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
623
Mau
GA INFRA-VPL
20092462
JAHANIYAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
2960
2023
2038
2053
30-May-2025
14-Feb-2025
13-Feb-2025
14-Feb-2025
Approved
Approved
Approved
Approved
View
624
Amethi
Gayatri Projects LTD
20034334
Jainagara water supply scheme
1
2
1850
2022
2037
2052
03-Nov-2024
02-Jun-2024
05-Sep-2024
10-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
625
Ambedkar Nagar
Vindhya-GAJA (JV)
20058509
JAINAPUR Water Supply Scheme
3
10
4220
2023
2038
2053
26-Dec-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Ok
Approved
SCHEME COMPLETED
View
626
Mau
LC INFRA
20064306
Jairamgarh Gram Panchayat Water Supply Scheme
1
2
1550
2022
2037
2052
29-Jun-2024
23-Apr-2025
23-Apr-2025
25-Apr-2025
Approved
Approved
Approved
approve
View
627
Ambedkar Nagar
Vindhya-GAJA (JV)
20026145
JAITI WATER SUPPLY SCHEME
2
2
2230
2023
2038
2053
28-Sep-2023
10-Mar-2025
20-Mar-2025
21-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
628
Etawah
Indian Hume Pipe
20094053
Jaitpur Totaram
1
1
1275
2022
2037
2052
02-Apr-2024
11-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Forwarded to you for further action.
Approved
All work of scheme found satisfactory.
View
629
Gautam Buddha Nagar
LC INFRA
20013499
JAITWARPUR W/S SCHEME
1
1
3856
2022
2037
2052
23-Sep-2023
30-Oct-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
630
Kanpur Dehat
GVPR
20069905
jajmuiya
1
4
1941
2023
2038
2053
17-Feb-2024
08-Nov-2023
23-Mar-2024
24-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
631
Ayodhya
UNIVERSAL MEP
20058762
JALAL PUR & MUZZAFFARPUR WSS
2
2
4280
2023
2038
2053
19-Mar-2024
03-Jul-2024
03-Jul-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
632
Hardoi
NCC Ltd.
20012236
Jalalpur
2
2
1810
2022
2037
2052
26-Jul-2023
10-Jan-2023
13-Apr-2023
07-Dec-2024
Approved
ok
Approved
OK
View
633
Hardoi
NCC Ltd.
20088748
JALALPUR
2
3
2370
2022
2037
2052
26-Jul-2023
15-Apr-2023
14-Aug-2023
22-Nov-2024
Approved
OK
Approved
OK
View
634
Meerut
Power Mech Projects Ltd
20011295
JALALPUR AKKHEPUR
1
1
2513
2022
2037
2052
31-Dec-2024
25-Jun-2024
16-Nov-2024
17-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
635
Auraiya
GVPR
20089644
Jalalpur bidhuna PWS
1
1
1420
2023
2038
2053
06-Jan-2022
25-Jan-2024
24-Nov-2023
25-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
636
Ghaziabad
LC INFRA
8359714
JALALPUR DIDHAR
1
1
4600
2022
2037
2052
27-Aug-2021
31-Oct-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
637
Kannauj
GVPR
20050185
JALALPUR KATRI BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3402
2023
2038
2053
15-Jun-2024
28-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
638
Kanpur Dehat
Indian Hume Pipe
20034284
JALALPUR NAGIN
1
8
4790
2022
2037
2052
24-Nov-2022
23-Nov-2023
31-Jul-2023
01-Aug-2023
Approved
forward for further action
Approved
All work of scheme found satisfactory
View
639
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008736
Jalalpur Sabakpur
2
4
4808
2022
2037
2052
07-Jul-2023
30-Jun-2025
17-Jun-2025
15-Jul-2025
Approved
Checked and Found Ok
Approved
Scheme completed
View
640
Kannauj
GVPR
20077048
JALALPUR SARWAN & ANTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
3205
2023
2038
2053
16-Aug-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
641
Meerut
Power Mech Projects Ltd
20094310
JALALUDDINPUR MASOODPUR GAWRI
1
1
1001
2022
2037
2052
31-Dec-2024
14-Aug-2024
02-Jan-2025
02-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
642
Hardoi
NCC Ltd.
20012249
Jalihapur (GOGP)
2
2
3360
2022
2037
2052
26-Jul-2023
20-Jan-2024
24-Apr-2024
30-Nov-2024
Approved
ok
Approved
OK
View
643
Kanpur Dehat
VSA
20092640
jallapur sikandra
1
1
2185
2023
2038
2023
30-Apr-2023
31-Dec-2023
10-May-2024
11-May-2025
Approved
Forward to further necessary action pls.
Approved
All work of scheme found satisfactory
View
644
Auraiya
GVPR
20091078
Jalokhar PWS
2
1
1893
2023
2038
2053
01-Jun-2022
03-Oct-2024
23-Jan-2024
10-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
645
Meerut
Power Mech Projects Ltd
8359773
JAMALPUR JALALPUR
1
1
3352
2022
2037
2052
07-Mar-2023
06-Jun-2024
22-Oct-2024
01-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
646
Meerut
Power Mech Projects Ltd
20078458
JAMALPUR MAJRA
1
1
1545
2022
2037
2052
31-Dec-2024
29-Jan-2024
18-Jun-2024
09-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
647
Amethi
Gayatri Projects LTD
20085725
JAMALPUR RAMPUR & TARAUNA WATER SUPPLY SCHEME
2
16
4652
2022
2037
2052
12-Jul-2024
07-Jun-2024
08-Jun-2024
15-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
648
Auraiya
GVPR
20065630
Jamauli PWS
1
7
4544
2023
2038
2053
06-Jan-2022
06-Jan-2024
11-Feb-2024
12-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
649
Mau
LC INFRA
20015834
Jamdra gp water supply Scheme
3
9
3152
2022
2037
2052
03-Aug-2023
02-Apr-2025
20-Apr-2025
25-Apr-2025
Approved
Approved......
Approved
approve
View
650
Balrampur
Larsen & Toubro Ltd
20019344
Jamuni Kalan water supply scheme
1
3
2262
2022
2037
2052
26-Jun-2023
06-Feb-2024
06-May-2024
07-May-2024
Approved
Approved as per theTKC agreement.
Pending
View
651
Ayodhya
UNIVERSAL MEP
20030486
JAMUNIYA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3210
2023
2038
2053
12-Oct-2023
21-Sep-2023
21-Sep-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
652
Meerut
Power Mech Projects Ltd
20011220
JANGETHI
1
1
5364
2022
2037
2052
31-Dec-2024
02-Feb-2023
21-Jun-2023
15-Oct-2024
Approved
Recommended for further Approvals....................................
Approved
APPROVED
View
653
Fatehpur
Power Mech Projects Ltd
20043844
Janta
1
3
3374
2023
2038
2053
28-Nov-2023
10-Mar-2025
05-Aug-2025
06-Aug-2025
Approved
Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram Pradhan.
Pending
View
654
Shahjahanpur
NCC Ltd.
20058837
JANYURI WSS
1
2
2060
2022
2037
2052
31-Dec-2024
20-Feb-2024
21-May-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
655
Hardoi
NCC Ltd.
20000029
JAPRA
1
5
5078
2022
2037
2052
29-Apr-2023
10-Oct-2023
09-Jan-2024
06-May-2025
Approved
ok
Approved
OK
View
656
Auraiya
GVPR
20091157
Jaraon PWS
1
4
1632
2023
2038
2053
22-Mar-2024
01-Aug-2025
31-Jul-2025
02-Aug-2025
Approved
Forwarded for further action.
Pending
View
657
Amethi
Vindhya-GAJA (JV)
20066597
JARAUTA VILLAGE WATER SUPPLY SCHEME
2
8
2614
2023
2038
2053
06-Jan-2024
08-Nov-2024
08-Feb-2025
09-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
658
Farrukhabad
Vindhya-GAJA (JV)
20092017
JARHARI MVS
2
3
2543
2023
2038
2053
30-May-2025
11-Oct-2024
11-Oct-2024
12-Oct-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
659
Bijnor
LC INFRA
20068049
JARIFPUR CHATAR WATER SUPPLY SCHEME
2
2
2246
2022
2037
2052
23-Jan-2023
26-Nov-2024
26-Nov-2024
27-Nov-2024
Approved
Every thing complete.
Approved
Everything Completed.
View
660
Meerut
Power Mech Projects Ltd
20098103
JASAR SULTANNAGAR
1
1
9048
2022
2037
2052
31-Dec-2024
13-Jul-2024
03-Dec-2024
04-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
661
Farrukhabad
Vindhya-GAJA (JV)
20074152
Jasmai SVS
1
4
3322
2023
2038
2053
30-May-2025
17-Jan-2024
01-May-2024
02-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
662
Kannauj
GVPR
20050183
JASUA MAI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
1861
2023
2038
2053
15-Jun-2024
06-Nov-2024
10-Nov-2024
10-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
663
Meerut
Power Mech Projects Ltd
20098111
JATAULA
1
1
1332
2023
2038
2053
31-Dec-2024
28-Apr-2024
14-Sep-2024
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
664
Shahjahanpur
NCC Ltd.
20015006
Jathiura W/s
1
2
3010
2022
2037
2052
09-Jul-2024
31-Dec-2024
08-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
665
Meerut
Power Mech Projects Ltd
20066858
JATPURA
1
1
2654
2022
2037
2052
31-Dec-2024
09-Feb-2024
28-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
666
Bijnor
Vindhya-GAJA (JV)
20059134
jatpura bhaunda water supply scheme
2
2
3385
2022
2037
2052
06-Jul-2023
10-Jan-2025
10-Jul-2025
11-Jul-2025
Approved
Every thing complete.
Approved
All document complete
View
667
Bijnor
Vindhya-GAJA (JV)
20063380
JAWALILALA WATER SUPPLY SCHEME
1
1
3250
2022
2037
2052
06-Jul-2023
25-Mar-2025
25-Sep-2025
26-Sep-2025
Approved
Every thing complete.
Approved
All document complete
View
668
Meerut
Power Mech Projects Ltd
8359772
JEORI
1
1
4287
2022
2037
2052
31-Dec-2024
17-Dec-2022
05-May-2023
07-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
669
Amethi
Vindhya-GAJA (JV)
20101945
JETHU MAWAI WATER SUPPLY SCHEME
1
2
1248
2023
2038
2053
04-Jul-2024
06-Nov-2024
06-Feb-2025
07-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
670
Kannauj
GVPR
20067620
JEWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
3885
2023
2038
2053
16-Aug-2024
30-Apr-2024
03-Aug-2024
04-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
671
Bijnor
LC INFRA
8360401
JHIRAN VILLAGE WATER SCHEME
1
1
3467
2022
2037
2052
02-Nov-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
672
Meerut
Power Mech Projects Ltd
20076732
JHUNJUNEE
1
1
3210
2023
2038
2053
31-Dec-2024
10-Aug-2024
27-Dec-2024
28-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
673
Moradabad
LC INFRA
20011019
JIGANIA VILLEGE WATER SUPPLY SCHEME
1
1
7012
2022
2037
2052
09-Feb-2024
03-Aug-2024
03-Nov-2024
04-Nov-2024
Approved
Ok
Pending
View
674
Kanpur Dehat
GVPR
20077384
JIGNISH
2
0
2179
2023
2038
2053
17-Feb-2024
07-Nov-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
675
Bahraich
PNC-SPML-JV
20014725
JIHURA MAFI TEJWAPUR PWS
1
9
8236
2022
2037
2052
30-Jun-2025
07-Mar-2025
23-Jun-2024
08-Mar-2025
Approved
Approved .
Approved
Scheme completed
View
676
Meerut
Power Mech Projects Ltd
20011008
JITHAULI
1
1
2845
2023
2038
2053
31-Dec-2024
16-Mar-2023
01-Aug-2023
07-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
677
Meerut
Power Mech Projects Ltd
20077312
JITPUR
1
1
2019
2022
2037
2052
31-Dec-2024
05-May-2024
21-Sep-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
678
Auraiya
GVPR
20025458
JiwaSirsani PWS
1
4
3322
2023
2038
2053
03-Dec-2021
09-Dec-2022
30-Nov-2023
01-Dec-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
679
Ambedkar Nagar
Vindhya-GAJA (JV)
20083855
JOGAPUR WSS
1
3
1800
2023
2038
2053
22-Mar-2024
14-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
680
Auraiya
GVPR
20084700
Juan PWS
1
1
3590
2023
2038
2053
06-Jan-2022
28-Mar-2024
27-Mar-2024
28-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
681
Kanpur Dehat
GVPR
20070068
JUGRAJPUR BITHOOR
1
2
1879
2023
2038
2053
17-Feb-2024
30-Dec-2024
07-May-2024
08-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
682
Hardoi
NCC Ltd.
20012123
JUJVAMAU
2
2
2180
2022
2037
2052
14-Jun-2023
08-Oct-2023
17-Jan-2024
24-Dec-2024
Approved
ok
Approved
OK
View
683
Hardoi
NCC Ltd.
8388606
Jura
1
11
4590
2022
2037
2052
05-Mar-2023
01-Dec-2023
29-Feb-2024
25-Dec-2024
Approved
ok
Approved
OK
View
684
Meerut
Power Mech Projects Ltd
20100949
JURRANPUR
1
1
1332
2023
2038
2053
11-Jun-2025
13-Aug-2024
03-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
685
Auraiya
Indian Hume Pipe
20014862
Kaba PWS
2
4
1950
2022
2037
2052
08-May-2023
26-Jul-2023
09-Nov-2023
10-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
686
Sultanpur
UNIVERSAL MEP
20066706
KABARI & DHAKHVA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
5700
2023
2038
2053
12-Jan-2024
31-Dec-2024
10-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
687
Azamgarh
LC INFRA
20101522
KABIRUDDINPUR WATER SUPPLY SCHEME
2
4
4811
2022
2037
2052
31-May-2023
15-Oct-2024
23-Oct-2024
24-Oct-2024
Approved
OK
Approved
OK
View
688
Sultanpur
UNIVERSAL MEP
20064704
KACHANAYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2600
2023
2038
2053
12-Jan-2024
12-Jan-2024
11-Oct-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
689
Kanpur Dehat
Indian Hume Pipe
20034278
KADARI
1
2
1600
2022
2037
2052
23-Nov-2023
31-Dec-2023
30-Oct-2023
01-Nov-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
690
Kanpur Dehat
Indian Hume Pipe
20034279
KAILAI
1
2
1960
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-May-2023
01-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
691
Sambhal
SPML Infra
20018922
KAILI WATER SUPPLY SCHEME
1
1
2830
2022
2037
2052
18-May-2023
05-Sep-2023
05-Dec-2023
06-Dec-2023
Approved
Trial Run Successfully Completed On 13-12-24
Pending
View
692
Amethi
Gayatri Projects LTD
20085825
KAIMA WATER SUPPLY SCHEME
1
7
2762
2022
2037
2052
22-Mar-2025
14-Sep-2024
20-Dec-2024
10-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
693
Kannauj
GVPR
20066556
KAIRDA & USMANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
3413
2023
2038
2053
16-Aug-2024
06-Nov-2024
09-Feb-2025
10-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
694
Meerut
Power Mech Projects Ltd
20011223
KAITHWARI
1
1
3867
2022
2037
2052
31-Dec-2024
05-Feb-2023
28-Jun-2023
15-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
695
Shahjahanpur
NCC Ltd.
8388653
KAJRI NOORPUR
1
1
2440
2022
2037
2052
31-Jul-2023
31-Dec-2024
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
696
Muzaffarnagar
Gayatri Projects LTD
20058586
KAKRA WATER SUPPLY SCHEME CHANDPUR BASDHARA (PART I)
1
2
8670
2022
2037
2052
16-Sep-2022
02-Aug-2024
02-Aug-2024
03-Aug-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
697
Bijnor
LC INFRA
8388783
KAKRALA VILLAGE WATER SCHEME
1
2
2269
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
All document complete
View
698
Bahraich
PNC-SPML-JV
20012357
KAKRI BALAHA PWS
1
4
7884
2022
2037
2052
31-Dec-2025
09-Nov-2025
15-May-2025
10-Nov-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0314, kindly complete it.
Approved
Scheme Completed with observation
View
699
Meerut
Power Mech Projects Ltd
20067097
KALAND
1
1
4983
2022
2037
2052
31-Dec-2024
23-Jul-2024
12-Dec-2024
13-Dec-2024
Approved
Recommended for further Approvals.
Pending
View
700
Meerut
Power Mech Projects Ltd
20011111
KALANJARI
1
1
4672
2022
2037
2052
31-Dec-2024
11-Feb-2023
01-Jul-2023
07-Oct-2024
Approved
Recommended for further Approval
Approved
Approved
View
701
Bijnor
LC INFRA
8360938
KALANPUR BUZURG (111951) GRAMPANCHAYAT WATER SUPPLY SCHEME
2
1
1812
2022
2037
2052
29-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing completed
Approved
Everything Completed
View
702
Mau
LC INFRA
20082303
KALFANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2020
2022
2037
2052
09-Feb-2025
02-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
All Documents checked and found OK
Approved
All documents found ok.
View
703
Kanpur Dehat
Indian Hume Pipe
20065249
Kalla
2
2
2700
2022
2037
2052
23-Sep-2022
31-Dec-2024
31-Mar-2023
01-Apr-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
704
Bareilly
NCC Ltd.
20015435
KALLIA water supply scheme
1
1
1763
2022
2037
2052
20-Jan-2022
13-May-2024
13-Aug-2024
25-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
705
Farrukhabad
Vindhya-GAJA (JV)
20097907
KALULI MAHBULLA PUR SVS
1
1
1598
2023
2038
2053
30-May-2025
17-May-2024
17-May-2024
18-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
Ok
View
706
Kannauj
GVPR
20090087
KALYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1714
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
707
Hardoi
NCC Ltd.
20012208
Kamalpur
1
3
3240
2022
2037
2052
26-Jul-2023
10-Nov-2023
09-Feb-2024
24-Dec-2024
Approved
ok
Approved
OK
View
708
Bijnor
LC INFRA
20016841
KAMALPUR WATER SUPPLY SCHEME
2
2
2478
2022
2037
2051
10-Feb-2024
11-Apr-2024
13-Oct-2024
14-Oct-2024
Approved
Every thing complete.
Approved
Everything Complete.
View
709
Meerut
Power Mech Projects Ltd
20078484
KAMARUDDINNAGAR MADHIYAI
1
1
3757
2023
2038
2053
31-Dec-2024
10-Aug-2024
27-Dec-2024
02-Nov-2024
Approved
Recommended for further Approvals..................................
Approved
APPROVED
View
710
Kanpur Dehat
GVPR
20053215
KAMIR
2
2
3401
2023
2038
2053
14-Sep-2023
09-Dec-2023
09-Jan-2024
10-Dec-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
711
Sultanpur
UNIVERSAL MEP
20066583
KAMOLIYA & PIKOURA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
5060
2023
2038
2053
12-Jan-2024
31-Dec-2024
25-Jul-2024
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
712
Ambedkar Nagar
Vindhya-GAJA (JV)
20058490
KANAK PATTI Water Supply Scheme
1
3
1690
2023
2038
2053
26-Dec-2023
30-Jun-2024
30-Sep-2024
01-Oct-2024
Approved
Checked and found ok
Approved
Scheme completed
View
713
Amethi
Vindhya-GAJA (JV)
20068372
KANAK SINGHPUR & KORARI HEERSHAH WATER SUPPLY SCHEME
2
7
3844
2023
2038
2053
23-Mar-2024
10-Nov-2024
10-Feb-2025
11-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
714
Ghaziabad
LC INFRA
20018959
KANAKPUR PWS SCHEME
1
1
3523
2022
2037
2052
21-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
715
Mau
GA INFRA-VPL
20092557
KANDHERI MUNGESAR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
3060
2023
2038
2053
30-Jun-2025
16-Jun-2025
16-Jun-2025
17-Jun-2025
Approved
Approved
Approved
Approved
View
716
Muzaffarnagar
Gayatri Projects LTD
20098069
KANHAERI GP RO WSS
2
2
3452
2023
2038
2053
16-Sep-2022
14-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
717
Kannauj
GVPR
20067448
KANKAR KUYIN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3866
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
718
Amethi
Vindhya-GAJA (JV)
20066620
KANKOO PUR WATE SUPPLY SCHEME
1
5
2406
2023
2038
2053
17-Feb-2024
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
719
Kannauj
GVPR
20067400
KANNAUJ KACHHOHA & CHAUDHARIAPUR KACHHOHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2840
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
720
Amethi
Vindhya-GAJA (JV)
20070858
KANOO WATER SUPPLY SCHEME
1
14
2176
2023
2038
2053
07-Feb-2024
24-Jun-2024
27-Sep-2024
28-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
.
View
721
Kannauj
GVPR
20077119
KANOULI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2692
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
722
Kanpur Dehat
Indian Hume Pipe
20016928
Kapasi
2
3
3100
2022
2037
2052
05-Feb-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
723
Shahjahanpur
NCC Ltd.
8388651
KAPOOR NAGLA
3
3
3300
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
724
Kannauj
GVPR
20036892
KAPOOR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2943
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
725
Kannauj
GVPR
20066423
KAPOORPUR KATRI & JALALPUR AMARA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
10
4246
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
726
Kanpur Dehat
GVPR
20053094
Kaprahat
1
4
4703
2023
2038
2053
18-Nov-2023
15-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
727
Amethi
Vindhya-GAJA (JV)
20065165
KAPURIPUR Water Supply Scheme
2
8
2387
2022
2038
2052
17-Feb-2024
07-May-2024
10-Aug-2024
13-Nov-2024
Approved
Hardcopy submitted
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
728
Auraiya
GVPR
20084718
Karahi PWS
1
4
3085
2023
2038
2053
01-Jun-2022
31-Dec-2024
17-Mar-2025
19-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
729
Bahraich
PNC-SPML-JV
20098744
KARAILA SAHBAJPUR RF PWS
2
15
5290
2022
2037
2052
31-Dec-2025
28-Aug-2025
12-Oct-2023
29-Aug-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0145 kindly complete it.
Approved
Scheme completed.
View
730
Farrukhabad
GVPR
20019920
Karamchand Pur W/S Scheme
1
1
1724
2022
2037
2052
26-Aug-2022
10-Jun-2024
15-May-2024
28-Jul-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
731
Sultanpur
Vindhya-GAJA (JV)
20084305
KARAMPUR PARVARBHAR WSS
1
2
2230
2022
2037
2052
23-Mar-2023
22-Mar-2024
30-Jan-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
732
Kannauj
GVPR
20077112
KAREEM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2001
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
733
Azamgarh
LC INFRA
20101559
KARENDUA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
3
13
4859
2022
2037
2052
21-Mar-2023
29-Oct-2023
31-Jan-2024
01-Feb-2024
Approved
OK
Approved
OK
View
734
Kanpur Dehat
GVPR
20053345
Kari Kalwari
1
3
3337
2023
2038
2053
18-Nov-2023
22-Nov-2023
06-Apr-2024
07-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
735
Shahjahanpur
NCC Ltd.
20057572
KARI MAKUAPUR WSS
2
3
2160
2022
2037
2052
30-Nov-2023
31-Dec-2024
29-Feb-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
736
Jaunpur
AFCONS
20072467
KARMAHI VILLAGE WATER SUPPLY SCHEME
3
13
3752
2023
2038
2053
21-Feb-2024
13-Sep-2024
09-Mar-2025
10-Mar-2025
Approved
Checked and Found ok.
Approved
ok
View
737
Bahraich
PNC-SPML-JV
20017959
KARNAI JARWAL PWS
1
12
3538
2022
2037
2052
31-Dec-2025
25-Jul-2025
25-Jul-2025
26-Jul-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1952 kindly complete it.
Approved
SCHEME COMPLETED
View
738
Kanpur Dehat
Indian Hume Pipe
20025503
Karom
1
5
2400
2022
2037
2052
24-Aug-2022
31-Dec-2024
07-Nov-2023
01-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
739
Moradabad
LC INFRA
8360494
KARSARA VILLAGE WATER SUPPLY SCHEME
1
1
5410
2022
2037
2052
01-Nov-2023
15-Mar-2024
19-Mar-2024
20-Mar-2024
Approved
Ok
Pending
View
740
Ambedkar Nagar
Vindhya-GAJA (JV)
20072738
KARTORA WSS
1
5
3300
2023
2038
2053
08-Mar-2024
02-Jul-2025
02-Jul-2025
03-Jul-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
741
Sultanpur
Vindhya-GAJA (JV)
20069822
KASAIPUR WATER SUPPLY SCHEME
2
2
3020
2023
2038
2053
05-Feb-2024
28-Dec-2024
01-Apr-2025
02-Apr-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements and O&M start date 01/08/2025
View
742
Amethi
Vindhya-GAJA (JV)
20066590
KASARA&PATAPUR VILLAGE WATER SUPLLY SCHEME
2
19
3847
2023
2038
2053
06-Jan-2024
09-Nov-2024
09-Feb-2025
10-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
743
Auraiya
GVPR
20091177
Kasba senganpur & Aima senganpur
3
3
5791
2023
2038
2053
06-Jan-2022
31-Dec-2024
25-May-2024
27-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
744
Auraiya
GVPR
20084721
Kashari
2
1
1705
2023
2038
2053
01-Jun-2022
30-Jun-2024
13-May-2024
30-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
745
Bijnor
LC INFRA
20019380
Kashmiri Abbunasarpur Water Supply
1
1
4356
2022
2037
2052
10-Feb-2022
17-Oct-2024
17-Oct-2024
18-Oct-2024
Approved
Everything is completed.
Approved
All document complete
View
746
Meerut
Power Mech Projects Ltd
20020256
KASIMPUR
1
1
3464
2022
2037
2052
31-Dec-2024
11-Dec-2023
26-Apr-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
747
Raebareli
NCC Ltd.
20062144
KASNA WATER SUPPLY SCHEME
1
2
1272
2022
2037
2052
04-Aug-2024
21-Jul-2024
21-Dec-2023
21-Nov-2024
Approved
Ok
Approved
Ok
View
748
Amethi
Vindhya-GAJA (JV)
20068063
KASTHUNI PURAB WATER SUPPLY SCHEME
3
10
2937
2023
2038
2053
08-Feb-2024
28-Jun-2024
28-Sep-2024
29-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
749
Kanpur Dehat
GVPR
20077252
KATEHI
1
3
1501
2023
2038
2053
17-Feb-2024
27-Nov-2023
11-Apr-2024
12-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
750
Kanpur Dehat
Indian Hume Pipe
20012659
Katethi
1
2
2960
2022
2037
2052
13-Oct-2021
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
FORWARD FOR FURTHER NECESSRY ACTION PLS.
Approved
All work of scheme found satisfactory
View
751
Kanpur Dehat
GVPR
20077446
KATHIKA
2
2
1729
2023
2038
2053
17-Feb-2024
18-Dec-2023
02-May-2024
03-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
752
Shahjahanpur
NCC Ltd.
20015647
kathpura
3
3
1820
2022
2037
2052
04-Jan-2024
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
753
Shahjahanpur
NCC Ltd.
20015877
Katia Rajjab
2
2
2890
2022
2037
2052
04-Jan-2024
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Katia Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Katiya Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
754
Kannauj
GVPR
20050202
KATRI AMINABAD & MAHAM BALIPUR & JALALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
4
7
4142
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
755
Kannauj
GVPR
20100928
KATRI GANGPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME
2
2
1607
2023
2038
2053
14-Nov-2024
15-Nov-2024
19-Feb-2025
20-Feb-2025
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
756
Kanpur Dehat
Indian Hume Pipe
20034288
KAUSUM
1
3
3180
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Nov-2023
01-Dec-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
757
Muzaffarnagar
Gayatri Projects LTD
20022997
KAZI KHERA RO WSS
1
2
5417
2022
2037
2052
16-Sep-2022
25-Oct-2023
25-Jan-2024
26-Jan-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
758
Meerut
Power Mech Projects Ltd
20012923
KAZMABAD GOON
1
1
5441
2052
2037
2052
31-Dec-2024
10-Mar-2023
27-Jul-2023
28-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
759
Ambedkar Nagar
Vindhya-GAJA (JV)
20047639
KEDRUPUR Water Supply Scheme
2
3
2340
2023
2038
2053
24-Nov-2022
24-Nov-2023
27-Jul-2025
28-Jul-2025
Approved
Scheme completed and ready for O&M
Pending
View
760
Etawah
Indian Hume Pipe
20026092
Kelamau PWS
1
2
1405
2022
2037
2052
22-Sep-2023
08-Jan-2024
16-Apr-2024
17-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
761
Mau
LC INFRA
20064365
Keshour Sultanipur Village Water Supply Scheme
5
9
2269
2022
2037
2052
20-Jul-2024
02-May-2025
02-May-2025
05-May-2025
Approved
Approved.
Approved
Approved.
View
762
Ambedkar Nagar
Vindhya-GAJA (JV)
20086834
KEWTALI WSS
6
9
4270
2023
2038
2053
23-Mar-2024
22-Mar-2025
22-Mar-2025
23-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
763
Mau
LC INFRA
20085366
KHAIRA NASIR PANCHAYAT WATER SUPPLY SCHEME
2
2
2440
2022
2037
2052
22-Mar-2025
05-May-2025
04-May-2025
05-May-2025
Approved
Approved..
Approved
Approved..
View
764
Bijnor
Vindhya-GAJA (JV)
20020694
Khairullapur Bila Ahatmali Gram Panchayat Water Supply
2
2
3491
2022
2037
2052
06-Jul-2023
25-Oct-2023
30-Apr-2024
01-May-2024
Approved
every thing completed
Approved
Everything Completed
View
765
Kannauj
GVPR
20100932
KHAJUHA GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1271
2023
2038
2053
14-Nov-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
766
Ambedkar Nagar
Vindhya-GAJA (JV)
20019943
Khajuri
2
3
3780
2023
2038
2053
04-Aug-2022
03-Aug-2023
02-Dec-2024
03-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
767
Kanpur Dehat
Indian Hume Pipe
20034272
KHAJURRA
1
3
2845
2022
2037
2052
24-Nov-2022
31-Dec-2024
31-Mar-2024
01-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
768
Meerut
Power Mech Projects Ltd
20090411
KHALIDPUR - DEDUPUR
2
2
3083
2023
2038
2053
31-Dec-2024
02-Apr-2024
19-Aug-2024
07-Nov-2024
Approved
checked and verified
Approved
approved
View
769
Bijnor
Vindhya-GAJA (JV)
20048038
Khalilullahpur Water Supply Scheme
1
1
3142
2023
2038
2053
06-Jul-2023
19-May-2024
19-Nov-2024
20-Nov-2024
Approved
Every thing complete.
Approved
Everything Complete
View
770
Kannauj
GVPR
20036138
KHANDE DEWAR GRAMIN PEYJAL YOJNA
1
1
3937
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
771
Shahjahanpur
NCC Ltd.
20014808
Khandsar
1
1
2900
2022
2037
2052
22-Jul-2023
31-Dec-2024
27-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
772
Hardoi
NCC Ltd.
20012358
Khanigawan Kalan
2
3
1900
2022
2037
2052
26-Jul-2023
20-Mar-2023
21-Jun-2023
07-Dec-2024
Approved
ok
Approved
OK
View
773
Kanpur Dehat
GVPR
20094174
khanpur chain kamalpur
2
7
4303
2023
2038
2053
14-Mar-2024
24-Dec-2023
08-May-2024
09-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
774
Azamgarh
LC INFRA
20053493
Khanpur Chitrawal Rural Water Supply Scheme
2
3
3635
2023
2038
2053
28-May-2024
10-Mar-2024
13-Jun-2024
14-Jun-2024
Approved
OK
Approved
OK
View
775
Meerut
Power Mech Projects Ltd
20020251
KHANUDA
1
1
2963
2022
2037
2052
31-Dec-2024
15-Jul-2024
01-Dec-2024
17-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
776
Bahraich
PNC-SPML-JV
20016081
KHAPURWA PHAKARPUR PWS
1
6
5301
2022
2037
2052
31-Dec-2025
18-Oct-2025
14-Sep-2024
18-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0502, kindly complete it.
Approved
Scheme Completed with observation
View
777
Sultanpur
UNIVERSAL MEP
20066066
KHARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
11
3965
2023
2038
2053
12-Jan-2024
31-Dec-2024
21-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
778
Kannauj
GVPR
20050190
KHARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2815
2023
2038
2053
15-Jun-2024
11-Mar-2024
12-Jun-2024
13-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
779
Amethi
Gayatri Projects LTD
20034270
Kharawa water supply scheme
2
8
3349
2022
2037
2052
06-May-2024
09-Jun-2024
15-Sep-2024
11-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
780
Fatehpur
Power Mech Projects Ltd
20097927
KHASMAU & BRAMANPUR
3
9
9040
2023
2038
2053
26-Sep-2023
25-Sep-2024
18-Dec-2024
19-Dec-2024
Approved
Trial & Run completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers.
Pending
View
781
Meerut
Power Mech Projects Ltd
8362750
KHASPUR
1
1
2653
2022
2037
2052
31-Dec-2024
27-Jan-2023
15-May-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
782
Meerut
Power Mech Projects Ltd
20082592
KHATA SAKOTI
2
2
6207
2023
2038
2053
31-Dec-2024
25-Sep-2024
15-Feb-2025
16-Feb-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
783
Muzaffarnagar
Gayatri Projects LTD
20098206
KHATAULI GRAMIN GP RO WSS
2
2
18171
2023
2038
2053
16-Sep-2022
01-Dec-2024
01-Mar-2025
02-Mar-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
784
Ambedkar Nagar
Vindhya-GAJA (JV)
20035272
KHATMIPUR WSS
1
7
2420
2023
2038
2053
21-Oct-2023
28-Dec-2024
26-Dec-2024
28-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
785
Meerut
Power Mech Projects Ltd
20090111
KHAWAJAHANPUR
1
1
964
2023
2038
2053
31-Dec-2024
03-Jun-2025
24-Oct-2024
15-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
786
Fatehpur
Power Mech Projects Ltd
20097822
KHAWAJIPUR SEMRAIYA
2
2
2170
2023
2038
2053
20-Sep-2024
11-Nov-2024
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
787
Meerut
Power Mech Projects Ltd
20083011
KHEJURI ALYARPUR
1
1
8367
2022
2037
2052
05-Jan-2024
31-Dec-2024
25-May-2024
07-Oct-2024
Approved
Recommended for further Approval
Pending
View
788
Fatehpur
Power Mech Projects Ltd
20095866
KHEOKHARI&BEYOTI
2
3
2910
2023
2033
2058
14-May-2024
30-Jun-2025
29-Apr-2025
30-Apr-2026
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
789
Meerut
Power Mech Projects Ltd
20011051
KHERI KALAN
1
1
2146
2022
2037
2052
31-Dec-2024
24-Feb-2023
12-Jul-2023
13-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
790
Meerut
Power Mech Projects Ltd
20066793
KHERI MANIHAR
1
1
3806
2023
2038
2053
31-Dec-2024
12-Aug-2024
29-Dec-2024
30-Dec-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
791
Meerut
Power Mech Projects Ltd
8362770
KHERI TAPPA LAWAR
1
1
2716
2022
2037
2052
31-Dec-2024
15-Apr-2023
02-Sep-2023
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
792
Ayodhya
VSA
20061571
KHEWLI & PUHLI WSS
4
12
4070
2023
2038
2053
20-Feb-2024
22-Oct-2024
23-Oct-2024
17-Jun-2025
Approved
FOUND OK
Pending
View
793
Kannauj
GVPR
20036300
KHIRIYA GRAMIN PEYJAL YOJNA
1
7
4841
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
794
Meerut
Power Mech Projects Ltd
20076746
KHIRWA NAUABAD
1
1
2498
2023
2038
2053
31-Dec-2024
13-Aug-2024
02-Jan-2025
03-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
795
Bijnor
LC INFRA
20018238
Khizarpur Water Supply
4
4
3335
2022
2037
2052
02-Sep-2022
18-Nov-2024
18-Nov-2024
19-Nov-2024
Approved
Everything Complete.
Approved
Everything Completed
View
796
Meerut
Power Mech Projects Ltd
20098178
KHORRAI-DAYALPUR
2
2
2705
2023
2038
2053
11-Jun-2025
16-Oct-2024
07-Mar-2025
08-Mar-2025
Approved
Recommended for further Approval
Approved
Approved
View
797
Kannauj
GVPR
20036895
KHOZI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
5767
2023
2038
2053
14-Nov-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
798
Farrukhabad
Vindhya-GAJA (JV)
20080824
KHUDNA DHAMGAWAN SVS
1
2
3152
2023
2038
2053
31-Mar-2025
25-Nov-2024
09-Mar-2025
13-May-2025
Approved
All the parameters ok
Approved
ok
View
799
Bijnor
LC INFRA
20014032
KHURAHERY WATER SUPPLY SCHEME
2
2
3417
2022
2037
2052
02-Nov-2023
03-Jul-2024
31-Dec-2024
01-Jan-2025
Approved
Every thing completed.
Approved
Everything Complete.
View
800
Ayodhya
UNIVERSAL MEP
20030590
KHURDAHA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
2220
2023
2038
2053
12-Oct-2023
09-Jun-2024
09-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
801
Farrukhabad
Vindhya-GAJA (JV)
20074156
KHWAJA AHMAD PUR KATIYA SVS
1
3
2335
2023
2038
2053
30-May-2025
11-Feb-2024
26-May-2024
27-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
802
Etawah
Indian Hume Pipe
20015029
Kiratpur
2
2
2530
2022
2037
2052
12-Sep-2022
10-Nov-2023
20-Apr-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of the scheme found satisfactory
View
803
Kannauj
GVPR
20100930
KISHAI JAGDISH PUR GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
11
5371
2023
2038
2053
14-Nov-2024
07-May-2024
10-Aug-2024
11-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
804
Meerut
Power Mech Projects Ltd
20011296
KISHANPUR BIRANA
1
1
3047
2022
2037
2052
31-Dec-2024
25-Jan-2023
14-Jun-2023
30-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
805
Meerut
Power Mech Projects Ltd
8362954
KISHORPUR
3
3
2366
2022
2037
2052
31-Dec-2024
16-Aug-2024
06-Jan-2005
07-Jan-2025
Approved
Recommended for further Approval
Approved
Approved
View
806
Kanpur Dehat
Indian Hume Pipe
20013583
Kishorpur
2
3
2100
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Aug-2023
01-Sep-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
807
Meerut
Power Mech Projects Ltd
20011048
KITHOLI
1
1
4118
2022
2037
2052
31-Dec-2024
23-Aug-2023
27-Dec-2023
26-Dec-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
808
Fatehpur
Power Mech Projects Ltd
20097727
KODARWAR ,TAUARA
5
5
4810
2023
2038
2053
14-May-2024
30-Jun-2025
15-Sep-2025
16-Sep-2025
Approved
Trial & Run completed. It was initiated in the month of June (16.06.2025) and Regular water supply is given to the consumers.
Pending
View
809
Ambedkar Nagar
Vindhya-GAJA (JV)
20033707
KODRA WATER SUPPLY SCHEME
1
1
4250
2023
2038
2053
21-Oct-2023
14-Sep-2024
18-Feb-2025
19-Feb-2025
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
810
Meerut
Power Mech Projects Ltd
20068971
KOHLA , MUBARIKPUR & SAIDIPUR SETH
3
3
5912
2023
2038
2053
31-Dec-2024
25-Jul-2024
11-Dec-2024
13-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
811
Amethi
Vindhya-GAJA (JV)
20070889
KOHRA WATER SUPPLY SCHEME
1
13
5091
2023
2038
2053
08-Feb-2023
16-Dec-2024
16-Mar-2025
17-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
812
Hardoi
NCC Ltd.
20011914
Koilara
3
3
2530
2022
2037
2052
15-Jun-2023
08-Nov-2023
09-Feb-2024
22-Nov-2024
Approved
OK
Approved
OK
View
813
Bahraich
PNC-SPML-JV
8362948
KOLUHA GRAM PANCHAYAT RURAL DRINKING WATER SUPPLY SCHEME
1
1
5670
2022
2037
2052
30-Jun-2025
15-Apr-2025
14-Feb-2024
16-Apr-2025
Approved
ok
Approved
SCHEME COMPLETED
View
814
Amethi
Vindhya-GAJA (JV)
20070871
KORARI GIRDHAR SHAH WATER SUPPLY SCHEME
1
10
3130
2023
2038
2053
08-Feb-2023
22-Dec-2024
23-Mar-2025
16-Jun-2025
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
815
Kanpur Dehat
Indian Hume Pipe
20034283
KORAUWA
1
1
2600
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-May-2023
01-Jun-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
816
Kanpur Dehat
GVPR
20025222
Korhwa
1
4
3833
2023
2038
2053
26-Sep-2023
02-Feb-2023
18-Jun-2023
19-Jun-2023
Approved
Forward for necessary action pls
Approved
All work of scheme found satisfactory
View
817
Sultanpur
UNIVERSAL MEP
20091196
KORO GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1928
2023
2038
2053
22-Mar-2024
22-Mar-2024
28-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
818
Ayodhya
UNIVERSAL MEP
20031423
KOT DEEH SARAIYAN & SARANGAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
17
8140
2023
2038
2053
12-Oct-2023
30-Jun-2024
30-Jun-2024
10-Feb-2025
Approved
FOUND OK
Pending
View
819
Ayodhya
UNIVERSAL MEP
20058447
Kotara WSS
2
2
2990
2023
2038
2053
12-Oct-2023
14-Apr-2024
14-Apr-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
820
Ayodhya
UNIVERSAL MEP
20058538
Kotdeeh WSS
1
1
3090
2023
2038
2053
12-Oct-2023
15-Oct-2024
05-Oct-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
821
Amethi
Vindhya-GAJA (JV)
20085690
KOTWAR MAU WATER SUPPLY SCHEME
1
8
1969
2023
2038
2053
29-Apr-2024
21-Jun-2024
21-Sep-2024
22-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
822
Farrukhabad
Vindhya-GAJA (JV)
20076673
KUBERPUR JUNNARDAR SVS
1
4
2479
2023
2038
2053
31-Mar-2025
21-Dec-2024
04-Apr-2025
13-May-2025
Approved
Ok..
Approved
ok
View
823
Kanpur Dehat
GVPR
20025196
Kudauli Madauli
1
3
3086
2023
2038
2053
26-Sep-2023
05-Dec-2023
19-Mar-2024
20-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
824
Kanpur Dehat
GVPR
20065136
KUDHAWAL & SALEMPUR
2
0
3198
2023
2038
2053
18-Jan-2024
22-Dec-2023
30-Mar-2024
31-Mar-2024
Approved
Forward for further necessary action
Approved
All work of scheme found satisfactory
View
825
Kanpur Dehat
GVPR
20053524
KUIT KHEDA 1, SARIYAPUR
3
2
4209
2023
2038
2053
18-Nov-2023
15-Dec-2023
25-Mar-2024
26-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work.
Approved
All work of scheme found satisfactory
View
826
Hardoi
NCC Ltd.
20000039
KUIYAN
1
3
2180
2022
2037
2052
29-Apr-2023
12-Jun-2023
11-Sep-2023
24-Dec-2024
Approved
ok
Approved
OK
View
827
Auraiya
GVPR
20100433
Kukarkat PWS
1
4
3225
2023
2038
2053
01-Jun-2022
30-Mar-2025
19-Feb-2024
31-Mar-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
828
Meerut
Power Mech Projects Ltd
20020947
KULANJAN
2
2
6001
2022
2037
2052
31-Dec-2024
24-Jan-2024
11-Jun-2024
31-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
829
Amethi
Welspun Kaveri Infraprojects JV
20013731
Kundanpur Water Supply Scheme
2
3
2490
2022
2037
2052
10-Apr-2023
01-Oct-2024
01-Oct-2024
25-Aug-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance.
View
830
Moradabad
LC INFRA
20011085
kundesra village water supply scheme
1
2
7302
2022
2037
2052
29-Sep-2023
10-Dec-2023
11-Mar-2025
12-Mar-2025
Approved
Ok
Pending
View
831
Meerut
Power Mech Projects Ltd
20010929
KUNEHRA
2
2
3257
2022
2037
2052
31-Dec-2024
15-Sep-2023
02-Feb-2024
16-Sep-2024
Approved
Recommended for further Approvals.
Approved
approved
View
832
Kannauj
GVPR
20036523
KUNWAPUR KASHIDIN & TARIND GRAMIN PEYJAL YOJNA
5
7
4605
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
833
Kannauj
GVPR
20067420
KUNWARPUR BANWARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
4743
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
834
Kannauj
GVPR
20067632
KUNWARPUR OR LODHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2117
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
835
Moradabad
LC INFRA
8359726
Kura Meerpur VILLAGE WATER SUPPLY SCHEME
1
1
4707
2022
2037
2052
27-Aug-2023
10-Jan-2024
09-Apr-2024
10-Apr-2024
Approved
Ok
Pending
View
836
Jhansi
Indian Hume Pipe
8010037
Kuraicha GOV
74
74
164050
2023
2038
2053
30-Jun-2022
30-Sep-2024
06-Jan-2025
07-Jan-2025
Approved
checked
Approved
approved
View
837
Meerut
Power Mech Projects Ltd
20011302
KURI KAMALPUR
1
1
1853
2022
2037
2052
31-Dec-2024
02-Feb-2023
20-Jun-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
838
Ayodhya
UNIVERSAL MEP
20031479
KUSHA HARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3730
2023
2038
2053
12-Oct-2023
30-Jan-2024
30-Jan-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
839
Meerut
Power Mech Projects Ltd
20011235
KUSHAWALI
1
1
5911
2022
2037
2052
31-Dec-2024
20-May-2023
09-Oct-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
840
Sultanpur
UNIVERSAL MEP
20066874
KUTUBPUR & KATKAWLAI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
5
8
5680
2023
2038
2053
12-Jan-2024
31-Dec-2024
26-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
841
Hardoi
NCC Ltd.
20012318
Kuwa Mau Simrauli
3
4
2480
2022
2037
2052
26-Jul-2023
18-Apr-2023
17-Jul-2023
25-Dec-2024
Approved
ok
Approved
OK
View
842
Kanpur Dehat
GVPR
20070043
laharpur
1
0
1433
2023
2038
2053
11-May-2024
10-Apr-2024
18-Jul-2024
19-Jul-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/.
Forward for further action
Approved
All work of scheme found satisfactory
View
843
Ayodhya
UNIVERSAL MEP
20030695
LAHRAPUR & PRANAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
6
3620
2023
2038
2053
12-Oct-2023
31-Aug-2023
31-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
844
Farrukhabad
Vindhya-GAJA (JV)
20093157
LAKHAN PUR MVS
1
5
3447
2023
2038
2053
30-May-2025
18-Jan-2024
02-May-2024
03-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
845
Ambedkar Nagar
Vindhya-GAJA (JV)
20019925
Lakhanpur
2
3
3830
2023
2038
2053
03-Aug-2023
02-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and found ok
Approved
Scheme completed
View
846
Fatehpur
Power Mech Projects Ltd
20100810
LAKHMIPUR
1
8
2530
2023
2038
2058
14-Aug-2023
13-Aug-2024
02-Sep-2024
02-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
847
Moradabad
LC INFRA
20011047
Lalpur Gosain village water supply scheme
1
2
3418
2022
2037
2052
29-Sep-2023
18-Oct-2024
16-Jan-2025
17-Jan-2025
Approved
Ok
Pending
View
848
Bijnor
Vindhya-GAJA (JV)
20020666
Lalpur Man Gram Panchayat Water Supply
1
1
3300
2023
2038
2053
06-Jul-2023
30-May-2024
29-Nov-2024
30-Nov-2024
Approved
Every thing completed
Approved
all work completed
View
849
Bahraich
PNC-SPML-JV
20092602
LALPUR PAYAGPUR RETRO PWS
1
5
3588
2022
2037
2052
31-Dec-2025
07-Oct-2025
01-May-2024
08-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0323 kindly complete it.
Approved
SCHEME COMPLETED
View
850
Ayodhya
UNIVERSAL MEP
20030517
LALUWAPUR & KOLVA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
5
5
4540
2023
2038
2053
12-Oct-2023
18-Feb-2024
18-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
851
Kanpur Dehat
GVPR
20077571
LAMHARA NARSOOJHA
2
8
4031
2023
2038
2053
17-Feb-2024
07-Mar-2024
21-Jul-2024
22-Jul-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
852
Kanpur Dehat
GVPR
20077297
Laruapur & Nandpur
4
4
4059
2023
2038
2053
17-Feb-2024
09-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
TKC unable to submit the calibration certificate, our letter SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/.
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
853
Bijnor
LC INFRA
20017125
Latifpur Bila Ahatmali Water Supply
1
1
3287
2022
2037
2052
02-Nov-2022
07-Dec-2023
05-Jun-2024
06-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
854
Amethi
Vindhya-GAJA (JV)
20101948
LAUKAPUR WATER SUPPLY SCHEME
1
1
1395
2023
2038
2053
04-Jul-2024
29-Jun-2024
29-Sep-2024
30-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
855
Mau
LC INFRA
20083037
LAUSHADH VILLAGE WATER SUPPLY SCHEME
1
5
3426
2022
2036
2052
20-Jul-2024
25-Apr-2025
25-Apr-2025
20-Sep-2025
Approved
Approved
Approved
approve
View
856
Ambedkar Nagar
Vindhya-GAJA (JV)
20019923
Lavaiya
1
6
2570
2023
2038
2053
03-Aug-2023
23-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
SCHEME COMPLETED
Approved
Scheme Completed
View
857
Ayodhya
VSA
20098899
Laxmanpur Grant WSS
1
2
660
2023
2038
2053
20-Mar-2024
31-Oct-2024
31-Oct-2024
16-Jan-2025
Approved
FOUND OK
Pending
View
858
Kannauj
GVPR
20050541
LILUIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5059
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
FORWRADED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
859
Meerut
Power Mech Projects Ltd
20058233
LOIYA
1
1
5144
2022
2037
2052
14-Aug-2024
15-Feb-2024
07-Jul-2024
08-Jul-2024
Approved
Recommended for further Approvals.
Approved
approved
View
860
Kannauj
GVPR
20067641
LOKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2692
2023
2038
2053
16-Aug-2024
30-Apr-2024
03-Aug-2024
04-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
861
Balrampur
Larsen & Toubro Ltd
20016392
Luchuiya water supply scheme
1
5
3269
2022
2037
2052
30-Dec-2024
30-May-2024
30-Aug-2024
01-Sep-2024
Approved
ok
Approved
Ok
View
862
Mau
LC INFRA
20010884
Luduhi G P Water Supply Scheme
2
6
1844
2022
2037
2052
09-Feb-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
Approved
View
863
Kanpur Dehat
VSA
20095562
Madanpur
2
2
2258
2023
2038
2023
30-Apr-2023
31-Dec-2023
20-Jun-2024
21-Jun-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
864
Bareilly
NCC Ltd.
20014951
Madanpur janubi
2
2
2552
2022
2037
2052
20-Jul-2023
19-Oct-2023
22-Feb-2024
24-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mandanpur Janubi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
865
Kanpur Dehat
GVPR
20086507
madarpur gajiuddinpur
1
2
1267
2023
2038
2053
14-Mar-2024
23-Dec-2023
07-May-2024
08-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
866
Kannauj
GVPR
20077118
MADARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1605
2023
2038
2053
08-Sep-2024
02-Nov-2024
04-Feb-2025
05-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
867
Ambedkar Nagar
Vindhya-GAJA (JV)
20033820
Madarpur Water supply scheme
1
2
2650
2023
2038
2053
21-Oct-2023
05-Sep-2024
07-Dec-2024
08-Dec-2024
Approved
Checked and found OK
Approved
Scheme completed
View
868
Fatehpur
Power Mech Projects Ltd
20097522
MADAULI
1
3
2213
2023
2033
2053
13-Aug-2024
30-Jun-2025
13-Mar-2025
14-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December(14.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
869
Ambedkar Nagar
Vindhya-GAJA (JV)
20026090
MADHOPUR WATER SUPPLY SCHEME
1
3
3800
2023
2038
2053
28-Sep-2023
14-Jun-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found OK
Approved
SCHEME COMPLETED
View
870
Moradabad
LC INFRA
20016784
Madhpuri village water supply scheme
1
1
2630
2022
2037
2052
08-Feb-2024
21-May-2024
19-Aug-2024
20-Aug-2024
Approved
Ok
Pending
View
871
Auraiya
Indian Hume Pipe
8361848
MADHUPUR
1
3
2145
2022
2037
2052
15-Sep-2021
25-Aug-2023
09-Dec-2023
10-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
872
Fatehpur
Power Mech Projects Ltd
20079124
MADURI
2
3
1850
2023
2038
2053
13-Mar-2024
14-Oct-2024
14-Oct-2024
14-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (15.07.2024).
Approved
Verified
View
873
Meerut
Power Mech Projects Ltd
20010925
MAHADEO
1
1
4377
2022
2037
2052
31-Dec-2024
12-Dec-2023
30-Apr-2024
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
874
Amethi
Gayatri Projects LTD
20034318
Mahaiya Senduriya water supply scheme
1
6
5499
2022
2037
2052
03-May-2024
16-Jun-2024
19-Sep-2024
26-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
875
Meerut
Power Mech Projects Ltd
20078402
MAHAMUDPUR SHIKHERA
1
1
2184
2023
2038
2053
31-Dec-2024
27-Jul-2024
14-Dec-2024
25-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
876
Auraiya
GVPR
20099285
Maharajpur Phaphoond PWS
1
1
256
2023
2038
2053
01-Jun-2022
29-Apr-2024
28-Apr-2024
30-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
877
Fatehpur
Power Mech Projects Ltd
20097523
MAHAWATPUR ASHAT
1
4
2660
2023
2033
2053
14-May-2024
30-Jun-2025
18-Apr-2025
19-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
878
Amethi
Vindhya-GAJA (JV)
20100650
MAHESH PUR WATER SUPPLY SCHEME
1
2
1632
2023
2038
2053
24-Apr-2024
18-Dec-2024
08-Mar-2025
09-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
879
Fatehpur
Power Mech Projects Ltd
20097475
MAHESHPUR
1
1
558
2023
2038
2053
13-Jun-2023
30-Jun-2025
08-Dec-2024
09-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
880
Bijnor
LC INFRA
20075954
Maheswari Village Water Supply
1
3
4960
2022
2037
2052
07-May-2024
07-May-2024
13-Sep-2024
14-Sep-2024
Approved
every thing completed
Approved
Everything Completed
View
881
Sultanpur
UNIVERSAL MEP
20066375
MAHMANDI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
4
4
2375
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
882
Shahjahanpur
NCC Ltd.
20015060
MAHMOODPUR
2
2
3010
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAHMOODPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mahmoodpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
883
Hardoi
NCC Ltd.
20000034
MAHMOODPUR BAHADURPUR
2
2
1470
2022
2037
2052
26-Jul-2023
11-Sep-2023
09-Dec-2023
30-Nov-2024
Approved
ok
Approved
OK
View
884
Bijnor
LC INFRA
20011718
Mahmoodpur Bikka Village Water Supply Scheme
1
2
1801
2022
2037
2052
10-Nov-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
every thing completed
View
885
Hardoi
NCC Ltd.
20018235
Mahmoodpur Lalta
2
3
2156
2022
2037
2052
29-Apr-2023
12-Oct-2023
11-Jan-2024
24-Dec-2024
Approved
ok
Approved
OK
View
886
Ayodhya
UNIVERSAL MEP
20030032
MAHMUD MAU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2779
2023
2038
2053
12-Oct-2023
13-Oct-2023
13-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
887
Ayodhya
UNIVERSAL MEP
20030266
MAHOLI UPARHAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
5450
2023
2038
2053
12-Oct-2023
16-Jun-2024
16-Jun-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
888
Meerut
Power Mech Projects Ltd
8362865
MAHROLI
1
1
3061
2022
2037
2052
31-Dec-2024
19-Dec-2022
08-May-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
889
Kannauj
GVPR
20077096
MAHSAIYAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
3507
2023
2038
2053
09-Aug-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
890
Auraiya
GVPR
20088637
Mahu PWS
1
4
2128
2023
2038
2053
06-Jan-2022
23-Apr-2024
07-Jun-2024
24-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
891
Kanpur Dehat
GVPR
20065228
MAHUA & MURRA
3
0
4094
2023
2038
2053
18-Jan-2024
20-Oct-2023
06-Mar-2024
07-Mar-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
892
Shahjahanpur
NCC Ltd.
20014003
Mahua durg W/s
1
1
2800
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
893
Hardoi
NCC Ltd.
8360561
Mahura Kalan
1
4
2730
2022
2037
2052
05-Mar-2023
12-Mar-2023
11-Jun-2023
25-Dec-2024
Approved
ok
Approved
OK
View
894
Kanpur Dehat
GVPR
20077550
MAIJUSA MASPUR
2
5
2022
2023
2038
2053
17-Feb-2024
17-Dec-2023
01-May-2024
02-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
895
Meerut
Power Mech Projects Ltd
20011056
MAIL PWS
1
1
6256
2022
2037
2052
31-Dec-2024
25-Jun-2024
11-Nov-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
896
Mau
LC INFRA
20077595
Majhauli Gram Panchayat Water supply Scheme
3
5
2120
2022
2037
2052
29-Jun-2024
04-Apr-2025
03-Apr-2025
04-Apr-2025
Approved
Approved.
Approved
Approved..
View
897
Sultanpur
UNIVERSAL MEP
20064712
MAJHNA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
14
4050
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
898
Kannauj
GVPR
20066565
MAJHO PUR & DAULTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME
5
9
4225
2023
2038
2053
16-Aug-2024
22-Apr-2025
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
899
Ayodhya
UNIVERSAL MEP
20030304
MAJNAWA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
5210
2023
2038
2053
12-Oct-2023
13-Jan-2024
13-Jan-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
900
Bahraich
PNC-SPML-JV
20020698
MAKANPUR NAWABGANJ PWS
1
4
7600
2022
2037
2052
31-Dec-2025
13-Oct-2025
13-Oct-2025
14-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0062, kindly complete it.
Approved
Scheme Completed with observation
View
901
Ambedkar Nagar
Vindhya-GAJA (JV)
20067758
MAKDOOMPUR Water Supply Scheme
2
3
5280
2023
2038
2053
23-Mar-2024
19-May-2025
19-May-2025
20-May-2025
Approved
Checked and found ok
Approved
Scheme completed
View
902
Hardoi
NCC Ltd.
20012175
MAKHADUM PURA
2
2
2240
2022
2037
2052
14-Jun-2023
31-Jan-2023
22-Apr-2023
25-Dec-2024
Approved
Approved
Approved
OK
View
903
Kanpur Dehat
GVPR
20053260
Makrandpur Kahinjari
1
2
3529
2023
2038
2053
18-Nov-2023
10-Oct-2023
12-Jan-2024
13-Jan-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
904
Kanpur Dehat
GVPR
20077274
Makrandpur Mazra
2
2
1747
2023
2038
2053
17-Feb-2024
20-Dec-2023
29-Mar-2024
30-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
905
Moradabad
LC INFRA
8389924
Malakpur Semli M S T
1
1
7094
2022
2037
2052
20-Sep-2023
23-Apr-2024
22-Jul-2024
23-Jul-2024
Approved
Ok
Pending
View
906
Kannauj
GVPR
20077102
MALGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3349
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
907
Auraiya
Indian Hume Pipe
20019892
MALHEPUR PWS
2
3
2700
2022
2037
2052
22-Sep-2023
28-Dec-2022
04-Apr-2023
05-Apr-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
908
Moradabad
LC INFRA
8361248
Malhpur Singhari
1
2
6650
2022
2037
2052
29-Sep-2023
10-Dec-2023
22-May-2024
23-May-2024
Approved
Ok
Pending
View
909
Moradabad
LC INFRA
20014464
Mali Pur
1
2
2538
2022
2037
2052
02-Nov-2023
18-Apr-2024
16-Jun-2024
17-Jun-2024
Approved
Ok
Pending
View
910
Shahjahanpur
NCC Ltd.
20096494
MALUAPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
2
3230
2022
2037
2052
19-Aug-2024
21-Dec-2024
18-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Maluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Malupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
911
Bijnor
LC INFRA
8360682
MANDAURA VILLAGE WATER SCHEME
3
3
3411
2022
2037
2052
26-Jul-2023
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
912
Bijnor
LC INFRA
20019956
Mandora VIP Water Supply Scheme
1
1
3141
2022
2037
2052
09-Feb-2022
21-Dec-2024
22-Mar-2025
23-Mar-2025
Approved
Every thing complete.
Approved
Everything is Completed.
View
913
Meerut
Power Mech Projects Ltd
20011300
MANDWARI
1
1
2203
2022
2037
2052
31-Dec-2024
10-Jan-2023
29-May-2023
30-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
914
Gautam Buddha Nagar
LC INFRA
8389573
MANGROLI GRAM PANCHAYAT WATER SUPPLY
1
1
2939
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
915
Etawah
Indian Hume Pipe
20015035
Mangupur
4
10
3550
2022
2037
2052
08-May-2023
20-May-2024
02-Jul-2024
03-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
916
Kannauj
GVPR
20050538
MANIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4048
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
917
Amethi
Vindhya-GAJA (JV)
20066548
MANJH GAON WATER SUPPLY SCHEME
1
6
2534
2023
2038
2053
07-Jan-2024
12-May-2024
04-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
918
Fatehpur
Power Mech Projects Ltd
20102043
MANJHANPUR
1
1
2390
2023
2038
2053
20-Sep-2024
25-Apr-2025
24-Apr-2025
25-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January (21.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
919
Ayodhya
UNIVERSAL MEP
20031495
MANJHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
3250
2023
2038
2053
12-Oct-2023
30-Dec-2023
30-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
920
Kanpur Dehat
GVPR
20077572
mankapur derapur
2
3
2100
2023
2038
2053
14-Mar-2024
02-Feb-2024
08-May-2024
09-May-2025
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
921
Moradabad
LC INFRA
8360504
MANKARA VILLAGE WATER SUPPLY SCHEME
1
1
4460
2022
2037
2052
20-Sep-2022
01-Sep-2024
01-Dec-2024
02-Dec-2024
Approved
Ok
Pending
View
922
Shahjahanpur
NCC Ltd.
20014021
MANORATHPUR SAH SOWARI
1
1
2350
2022
2037
2052
17-Jul-2024
31-Dec-2024
16-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Manorathpur Sah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Manorathpur Shah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
923
Kanpur Dehat
GVPR
20053677
MANPUR GAJEN1
2
1
2515
2023
2038
2053
18-Nov-2023
10-Dec-2023
11-Mar-2024
11-Mar-2024
Approved
Forwarded for Further action.
Approved
All work of scheme found satisfactory
View
924
Meerut
Power Mech Projects Ltd
20102362
Mansabgarh
1
1
650
2023
2038
2053
11-Jun-2025
14-Sep-2024
31-Jan-2025
01-May-2025
Approved
Recommended for further Approval
Approved
approved
View
925
Mau
GA INFRA-VPL
20088192
MANSDI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2120
2023
2038
2038
21-Mar-2025
21-Mar-2025
20-Mar-2025
21-Mar-2025
Approved
Approved
Approved
Approved
View
926
Auraiya
GVPR
20093417
Mansukhpur & Kasbajana
1
7
6150
2023
2038
2053
01-Jun-2022
17-Apr-2025
16-Apr-2025
18-Apr-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
927
Shahjahanpur
NCC Ltd.
20015096
Mareena
1
1
2420
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
928
Kannauj
GVPR
20036485
MARHI & BAJHERI GRAMIN PEYJAL YOJNA
2
9
3871
2023
2038
2053
13-May-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
929
Ghaziabad
LC INFRA
20021146
MASAUTA PWS SCHEME
1
1
3843
2022
2037
2052
21-Mar-2022
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
930
Hardoi
NCC Ltd.
20012541
MASFANA JJM
2
2
1500
2022
2037
2052
26-Jul-2023
01-Oct-2023
02-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
931
Ayodhya
UNIVERSAL MEP
20058296
MATAULI WSS
3
5
3450
2023
2038
2053
19-Mar-2024
03-Jun-2024
03-Jun-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
932
Ghaziabad
LC INFRA
20094905
MATAUR VILLAGE WATER SUPPLY SCHEME
1
1
2329
2022
2037
2052
31-Oct-2024
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
aprroved
View
933
Ambedkar Nagar
Vindhya-GAJA (JV)
20035086
MATHIYA WSS
1
8
6150
2023
2037
2053
21-Oct-2023
14-Jun-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
934
Jaunpur
AFCONS
20074092
MATHURAPUR URF KOTWA VILLAGE WATER SUPPLY SCHEME
1
6
2881
2023
2038
2053
21-Feb-2024
15-Apr-2024
09-Mar-2025
10-Mar-2025
Approved
Checked and found ok.
Approved
ok
View
935
Ghaziabad
LC INFRA
20094912
MATIALA VILLAGE WATER SUPPLY SCHEME
1
1
2130
2022
2033
2052
30-Sep-2024
30-Nov-2024
01-Apr-2025
05-Apr-2025
Approved
All Civil and mechanical works are completed.
Approved
All work completed
View
936
Auraiya
Indian Hume Pipe
8362646
MAU
1
2
3335
2022
2037
2052
14-Sep-2022
03-Aug-2023
04-Nov-2023
05-Nov-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
937
Auraiya
GVPR
20101891
Mau(khidarpur)PWS
1
4
556
2023
2038
2053
06-Jan-2022
03-Oct-2024
02-Oct-2024
04-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
938
Kanpur Dehat
Indian Hume Pipe
20025480
Maujpur
1
2
2350
2022
2037
2052
24-Aug-2022
31-Dec-2024
31-Jan-2024
01-Feb-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
939
Kannauj
GVPR
20077114
MAUMARPUR MAURARA & RAMPUR MAJAR GANGADARAPOUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
4777
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for futrher action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
940
Kanpur Dehat
Indian Hume Pipe
20034274
MAVAIYA
1
3
1900
2022
2037
2052
23-Nov-2023
31-Dec-2024
31-Dec-2024
01-Jan-2025
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
941
Meerut
Power Mech Projects Ltd
20020840
MAVIMIRA
2
2
4819
2022
2038
2052
31-Dec-2024
10-Jul-2024
26-Nov-2024
27-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
942
Amethi
Gayatri Projects LTD
20098295
MAWAIYA RAHMAT GARH WATER SUPPLY SCHEME
1
11
9186
2022
2037
2052
27-Jun-2025
10-Jun-2024
11-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
943
Amethi
Gayatri Projects LTD
20077657
Mayas & Nimi Water Supply Scheme
2
10
4230
2022
2037
2057
10-Aug-2024
27-Jun-2024
29-Sep-2024
18-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
944
Ambedkar Nagar
Vindhya-GAJA (JV)
20019936
Mdarbhari
2
6
5550
2023
2038
2053
03-Aug-2023
20-Dec-2024
20-Mar-2025
21-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
945
Ambedkar Nagar
Vindhya-GAJA (JV)
20019789
Medhi Sulempur
3
6
4800
2023
2038
2053
03-Aug-2023
10-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
946
Meerut
Power Mech Projects Ltd
8362147
MEDPUR
1
1
5094
2022
2037
2052
31-Dec-2024
18-Dec-2022
07-May-2023
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
947
Etawah
Indian Hume Pipe
20014159
Meerakhpur
1
5
2165
2022
2037
2052
12-Oct-2022
24-Dec-2023
31-Mar-2024
01-Apr-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
948
Kannauj
GVPR
20067636
MEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1535
2024
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2023
23-Jun-2023
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance
View
949
Farrukhabad
Vindhya-GAJA (JV)
20093150
MEERPUR KAMRUDIN NAGAR MVS
2
2
2028
2023
2038
2053
31-Mar-2025
16-Jan-2025
30-Apr-2025
13-May-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
950
Meerut
Power Mech Projects Ltd
20037228
MEGHRAJPUR
1
1
2483
2022
2037
2052
31-Dec-2024
12-Feb-2024
02-Jul-2024
04-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
951
Meerut
Power Mech Projects Ltd
20067081
MEHARMATI GANESHPUR
1
1
3517
2023
2038
2053
31-Dec-2024
22-Mar-2024
07-Aug-2024
01-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
952
Bijnor
Vindhya-GAJA (JV)
20025521
Mehbulla Pur Dhaki Gram Panchayat Water Supply
3
3
3096
2023
2038
2053
06-Jul-2023
19-Apr-2024
19-Oct-2024
20-Oct-2024
Approved
Every thing complete
Approved
Everything Complete
View
953
Meerut
Power Mech Projects Ltd
20058412
MEHMUDPUR SHERKI & MEHMUDPUR GAWRI
2
2
2292
2023
2038
2053
31-Dec-2024
19-Feb-2024
06-Jul-2024
02-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
954
Ambedkar Nagar
Vindhya-GAJA (JV)
20041720
MIJHAURA WSS
1
1
7250
2023
2038
2053
23-Nov-2023
23-Jun-2025
08-Jul-2025
08-Jul-2025
Approved
Approved Checked and found ok
Approved
CHECKED AND FOUND OK
View
955
Moradabad
LC INFRA
8360481
MILAK AMAWTI VILLAGE WATER SCHEME
1
1
4179
2022
2037
2052
20-Sep-2023
10-Dec-2023
20-Mar-2024
21-Mar-2024
Approved
Ok
Pending
View
956
Farrukhabad
Vindhya-GAJA (JV)
20091277
MILIK MAJMULLA MVS
2
3
2174
2023
2038
2053
31-Mar-2025
30-Dec-2024
11-Mar-2025
12-Mar-2025
Approved
Ok
Approved
OK
View
957
Kanpur Dehat
VSA
20092702
minapur
1
1
1632
2023
2038
2023
30-Apr-2023
31-Dec-2023
15-Apr-2024
16-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
958
Ayodhya
UNIVERSAL MEP
20030546
MINAPUR FAGAULI & FAGOLI KUARMIYAN GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
4
7
6690
2023
2038
2053
12-Oct-2023
24-Nov-2023
24-Nov-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
959
Meerut
Power Mech Projects Ltd
20011109
MIRPUR
3
3
4567
2022
2037
2052
31-Dec-2024
10-Nov-2023
30-Mar-2024
10-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
960
Auraiya
GVPR
20099292
Mirzapur Bairamshah
1
1
468
2023
2038
2053
01-Jun-2024
31-Jul-2025
30-Jul-2025
01-Aug-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
961
Bijnor
Vindhya-GAJA (JV)
20022098
Mirzapur Dhikli Gram Panchayat Water Supply
2
2
3491
2022
2037
2057
06-Jul-2023
21-Nov-2023
30-May-2024
01-Jun-2024
Approved
every thing completed.
Approved
Everything Completed
View
962
Fatehpur
Power Mech Projects Ltd
20097490
MISA
1
1
2420
2023
2038
2053
20-Sep-2024
24-Mar-2025
23-Mar-2025
24-Mar-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
963
Ghaziabad
LC INFRA
20102069
MISBAPUR VILLAGE WATER SUPPLY SCHEME
1
1
714
2022
2037
2052
31-May-2023
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approved
View
964
Moradabad
LC INFRA
8359738
Misripur Misripur
1
1
14986
2022
2037
2052
28-Aug-2023
15-Jun-2024
13-Sep-2024
14-Sep-2024
Approved
Ok
Pending
View
965
Ayodhya
UNIVERSAL MEP
20030466
MISSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
5220
2023
2038
2053
12-Oct-2023
20-Oct-2023
20-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
966
Meerut
Power Mech Projects Ltd
20037221
MITHEPUR
1
1
3504
2022
2037
2052
31-Dec-2024
03-Feb-2024
21-Jun-2024
10-Dec-2024
Approved
Recommended for further approval
Approved
approved
View
967
Kannauj
GVPR
20100931
MITRASENPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1259
2023
2038
2053
14-Nov-2024
03-May-2024
07-Aug-2024
08-Aug-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
968
Kannauj
GVPR
20066515
MIYA GANJ GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4177
2023
2038
2053
16-Aug-2024
31-Mar-2024
07-Mar-2024
07-Apr-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
969
Shahjahanpur
NCC Ltd.
20015542
Miyuna sww
1
2
2960
2022
2037
2052
31-Dec-2024
04-Jan-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
970
Etawah
Indian Hume Pipe
20022015
Mohabbatpurnagla Bhagat PWS
1
1
2245
2022
2037
2052
22-Sep-2023
11-Oct-2023
25-Jan-2024
24-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
971
Shahjahanpur
NCC Ltd.
20015943
MOHAMADPUR GULERIYA
1
3
2730
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MOHAMADPUR GULERIYA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mohammadpur Guleriya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
972
Bahraich
PNC-SPML-JV
20099559
MOHAMMAD NAGAR CHITTAURA RF MVS PWS
2
16
9780
2022
2037
2052
30-Jun-2025
10-Jun-2025
10-Jun-2025
11-Jun-2025
Approved
scheme complete
Approved
Scheme completed.
View
973
Meerut
Power Mech Projects Ltd
20078443
MOHAMMADPUR AKBARPUR CHAKBANDI
1
1
1380
2022
2037
2052
31-Dec-2024
16-Jun-2024
01-Nov-2024
02-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
974
Ghaziabad
LC INFRA
20097918
MOHAMMADPUR AMAD BAGHPAT VILLAGE WATER SUPPLY SCHEME
1
1
1779
2022
2037
2052
31-Oct-2024
01-Dec-2024
27-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
all work has been completed
View
975
Moradabad
LC INFRA
8359739
Mohammadpur Maphy VILLAGE WATER SUPPLY SCHEME
1
1
8629
2022
2037
2052
25-Aug-2023
18-Dec-2024
17-Mar-2025
18-Mar-2025
Approved
Ok
Pending
View
976
Meerut
Power Mech Projects Ltd
20037267
MOHANIPUR BHAROTA
2
2
2445
2022
2037
2052
31-Dec-2024
03-Apr-2024
20-Aug-2024
31-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
977
Shahjahanpur
NCC Ltd.
20016423
MOHANPUR KALUAPUR
2
3
1850
2022
2037
2052
31-Dec-2024
30-Sep-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mohanpur Kaluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of MOHANPUR KALUAPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
978
Kannauj
GVPR
20050198
MOHANPUR RATANPUR & CHACHASANDA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
5670
2023
2038
2053
15-Jun-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
979
Gautam Buddha Nagar
LC INFRA
20017819
MOHBALIPUR VILLAGE WATER SUPPLY SCHEME
1
1
1663
2022
2037
2052
20-Mar-2023
30-Mar-2024
30-Mar-2024
01-Apr-2024
Approved
Project certificate is verified.
Approved
Verified
View
980
Meerut
Power Mech Projects Ltd
20100955
MOHD.PUR GUMI
1
1
812
2023
2038
2053
31-Dec-2024
08-May-2024
03-Oct-2024
02-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
981
Meerut
Power Mech Projects Ltd
20011061
MOHDPUR DHUMI
1
1
3565
2022
2037
2052
31-Dec-2024
17-May-2023
03-Oct-2023
06-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
982
Ghaziabad
LC INFRA
20019990
MOHHAMADPUR HISAULI PWS SCHEME
1
1
3061
2022
2037
2052
01-Feb-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
983
Meerut
Power Mech Projects Ltd
20016932
MOHIUDDINPUR LALSANA
1
1
2029
2022
2037
2052
07-Mar-2023
27-Dec-2022
16-May-2023
18-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
984
Bijnor
LC INFRA
20013270
MOHMADPUR SADA BILA AHATMALI WATER SUPPLY SCHEME
2
2
3051
2022
2037
2052
10-Feb-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
985
Bijnor
LC INFRA
20051622
MOHRA
1
1
2517
2022
2037
2052
03-Dec-2022
05-Jul-2024
13-Jan-2025
14-Jan-2025
Approved
Every thing complete
Approved
Everything is Completed.
View
986
Meerut
Power Mech Projects Ltd
20082564
MOR KHURD & SADARPUR
2
2
6615
2023
2038
2053
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approval
Approved
Approved
View
987
Ambedkar Nagar
Vindhya-GAJA (JV)
20047599
MUBARAKPUR MARAILA Water Supply Scheme
2
2
2190
2023
2038
2053
24-Nov-2023
21-Sep-2024
20-Dec-2024
21-Dec-2024
Approved
checked and verified
Approved
SCHEME COMPLETED
View
988
Shahjahanpur
NCC Ltd.
20096501
MUDIA KALAN GRAM PANCHAYAT I VILLAGE WATER SUPPLY SCHEME
1
2
1840
2022
2037
2052
17-Aug-2024
31-Dec-2024
16-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mudia Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Mudiya Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
989
Kannauj
GVPR
20036136
MUGARA GRAMIN PEYJAL YOJNA
1
5
2707
2023
2038
2053
13-May-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
990
Auraiya
GVPR
20041745
Mughariha&belhupur PWS
2
1
3645
2023
2038
2053
26-Nov-2024
02-Nov-2023
10-Jul-2023
26-Aug-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
991
Muzaffarnagar
Gayatri Projects LTD
20022187
Muhammadpur Rai Singh
1
1
5710
2022
2037
2052
16-Sep-2022
08-Dec-2023
10-Mar-2024
11-Mar-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
992
Ambedkar Nagar
Vindhya-GAJA (JV)
20019657
Mujahidpur
1
5
2790
2023
2038
2053
03-Aug-2023
07-Sep-2024
09-Dec-2024
10-Dec-2024
Approved
Checked and found OK
Approved
Scheme completed
View
993
Meerut
Power Mech Projects Ltd
20098584
MUKHTYARPUR NAGLA
1
1
1601
2022
2037
2052
11-Jun-2025
25-Sep-2024
11-Feb-2025
13-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
994
Kanpur Dehat
GVPR
20053394
MULHI
2
2
2588
2023
2038
2053
18-Nov-2023
27-Jan-2024
14-May-2024
15-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
995
Shahjahanpur
NCC Ltd.
20015940
munavwar ganj urf barenda WSS
1
4
4620
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Munavwar Ganj Urf Barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Munawarganj urf barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
996
Muzaffarnagar
Gayatri Projects LTD
20022918
MUNDBHAR RO WSS
1
2
5545
2022
2037
2052
16-Sep-2022
03-Jun-2024
03-Sep-2024
04-Sep-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
997
Muzaffarnagar
Gayatri Projects LTD
20023355
MUNDBHAR RO WSS (BHORA KHURD WSS)
1
4
4439
2022
2037
2052
16-Sep-2022
29-Jan-2024
29-Apr-2024
30-Apr-2024
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
998
Kanpur Dehat
GVPR
20052993
Mundera kinnar singh
2
3
4554
2023
2038
2053
18-Nov-2023
12-Dec-2023
12-Mar-2024
13-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
999
Shahjahanpur
NCC Ltd.
20033494
Mundiya Aas
1
2
2310
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1000
Mau
LC INFRA
20085354
MUNJDAND PANCHAYAT WATER SUPPLY SCHEME
3
5
1421
2022
2037
2052
22-Mar-2025
02-Apr-2025
02-Apr-2025
02-Apr-2025
Approved
Approve.
Approved
Approved.
View
1001
Ghaziabad
LC INFRA
20070218
Muradabad Village Water Supply Scheme
1
1
3536
2022
2037
2052
01-Jul-2024
31-Dec-2024
30-Apr-2025
01-May-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed and approved
View
1002
Ghaziabad
LC INFRA
20102064
MURADGAM PUR PURSI VILLAGE WATER SUPPLY SCHEME
1
1
9763
2022
2037
2052
31-May-2023
01-Nov-2024
30-Apr-2025
01-May-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
1003
Shahjahanpur
NCC Ltd.
20014146
Muradpur Nibiakhera
1
1
3308
2022
2037
2052
31-Dec-2024
31-Aug-2023
30-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Muradpur Nibiakhera scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Pending
View
1004
Farrukhabad
Vindhya-GAJA (JV)
20080821
MURAITHI SVS
1
1
3388
2023
2038
2053
30-May-2025
26-Jan-2024
10-May-2024
11-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1005
Farrukhabad
Vindhya-GAJA (JV)
20091736
MURAN & NAGLA SOODAN MVS
2
2
3391
2023
2038
2053
30-May-2025
09-Feb-2024
24-May-2024
25-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1006
Mau
GA INFRA-VPL
20088206
MURARPUR GRAM PANCHAYAT WATER VSUPPLY SCHEME
4
10
2170
2023
2038
2053
30-Nov-2024
15-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Approved
Approved
Approved
View
1007
Shahjahanpur
NCC Ltd.
8361721
MURHA HARIS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1008
Meerut
Power Mech Projects Ltd
20098087
MURLIPUR PHOOL
1
1
4505
2023
2038
2053
11-Jun-2025
15-Oct-2024
05-Mar-2025
06-Mar-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
1009
Kannauj
GVPR
20067358
MURRA & BAUSIA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3816
2023
2038
2053
16-Aug-2024
20-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1010
Azamgarh
LC INFRA
20025166
Mustafabad Khas Rural Bad Water Supply Scheme
1
2
5115
2022
2037
2052
21-Mar-2023
15-Mar-2024
16-Jun-2024
17-Jun-2024
Approved
OK
Approved
OK
View
1011
Bijnor
LC INFRA
20019392
Mustfapuransu Water Supply
1
1
1203
2022
2037
2052
10-Feb-2022
21-Apr-2024
23-Oct-2024
24-Oct-2024
Approved
Every thing completed.
Approved
All Documents checked and verified
View
1012
Bijnor
LC INFRA
20019982
Muswi Khan pur Water Supply Scheme
1
3
1544
2022
2037
2052
10-Feb-2024
05-Apr-2024
14-Oct-2024
15-Oct-2024
Approved
every thing completed
Approved
Everything Completed
View
1013
Amethi
Gayatri Projects LTD
20076489
NABHANPUR WATER SUPPLY SCHEME
2
7
3007
2022
2037
2052
14-Mar-2025
15-Jun-2024
19-Sep-2024
25-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1014
Shahjahanpur
NCC Ltd.
20015102
NADIAYA RAMPUR Jatipur W/s
1
1
2210
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nadiaya Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of NADIAYA RAMPUR Jatipur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1015
Amethi
Gayatri Projects LTD
20101996
NADIWAN WATER SUPPLY SCHEME
1
13
3024
2022
2037
2052
27-Jun-2025
07-Sep-2024
13-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
1016
Gautam Buddha Nagar
LC INFRA
20102367
NAGALA CHITI VILLAGE WATER SUPPLY SCHEME
1
1
665
2022
2037
2052
07-Feb-2024
01-Oct-2024
01-Jul-2024
01-Oct-2024
Approved
Project certificate is verified
Pending
View
1017
Kannauj
GVPR
20036635
NAGALA KHEM KARAN & DILWARPUR GRAMIN PEYJAL YOJNA
2
2
3754
2023
2038
2053
13-May-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1018
Etawah
Indian Hume Pipe
20025932
Nagari PWS
1
3
1470
2022
2037
2052
22-Sep-2023
16-Mar-2023
19-Jun-2023
20-Jun-2023
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
1019
Shahjahanpur
NCC Ltd.
20015211
NAGARIYA BUZURG
1
1
1650
2022
2037
2052
19-Dec-2023
31-Dec-2024
19-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nagariya Bujurg have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Nagariya Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1020
Farrukhabad
Vindhya-GAJA (JV)
20075132
NAGARIYA GHALBARAN MVS
6
6
4265
2023
2038
2053
30-May-2025
03-Apr-2024
03-Apr-2024
04-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1021
Gautam Buddha Nagar
LC INFRA
8389561
Nagla chamrooo
1
1
2162
2022
2037
2052
20-Mar-2023
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Project certificate is verified.
Approved
Verified
View
1022
Hardoi
NCC Ltd.
20012361
Nagla Kallu
3
4
2130
2021
2037
2052
28-Jul-2023
30-Oct-2023
31-Jan-2024
30-Nov-2024
Approved
ok
Approved
OK
View
1023
Farrukhabad
Vindhya-GAJA (JV)
20076912
NAGLA KHEM RANGAI SVS
1
10
3083
2023
2038
2053
30-May-2025
26-Mar-2024
09-Jul-2024
10-Jul-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1024
Meerut
Power Mech Projects Ltd
20077314
NAGLA ORDER
1
1
4216
2022
2037
2052
31-Dec-2024
07-Aug-2024
20-Jan-2025
21-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
1025
Auraiya
GVPR
20065300
Nagla Pathak PWS
3
6
3104
2023
2038
2053
12-Jan-2023
04-Jan-2025
03-Jan-2025
04-Jan-2025
Approved
Forwarded for further action.
Pending
View
1026
Meerut
Power Mech Projects Ltd
20031856
NAGLA PATU - KHANPUR
2
2
2617
2023
2038
2053
31-Dec-2024
10-Mar-2024
27-Jul-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1027
Auraiya
GVPR
20065298
Nagla simar PWS
1
2
1997
2023
2038
2053
01-Jun-2024
16-Jun-2024
15-Jun-2024
17-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1028
Etawah
Indian Hume Pipe
20014151
Nagla Sukul
3
3
2070
2022
2037
2052
12-Sep-2022
14-Aug-2023
15-Jan-2024
14-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
1029
Bijnor
LC INFRA
20017102
Naglan Nensi Bila Ahatmali water Supply
1
1
2081
2022
2037
2052
02-Nov-2023
22-Nov-2023
26-May-2024
27-May-2024
Approved
every thing completed.
Approved
Everything Completed
View
1030
Meerut
Power Mech Projects Ltd
20020264
NAGLI AZAMABAD
1
1
1922
2022
2037
2052
31-Dec-2024
08-Mar-2024
15-Jun-2024
14-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1031
Meerut
Power Mech Projects Ltd
20098086
NAGLI KITHAUR
1
1
3855
2023
2038
2053
11-Jun-2025
12-Sep-2024
29-Jan-2025
30-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
1032
Meerut
Power Mech Projects Ltd
20076726
NAGLI SADHARAN
1
1
2952
2022
2037
2052
31-Dec-2024
20-Nov-2024
08-Apr-2025
10-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1033
Siddharth Nagar
JAKSON - VISHVARAJ (JV)
20076609
NAGWA GP WSS
1
1
1867
2023
2038
2053
02-Sep-2024
18-Jul-2025
18-Jul-2025
29-Oct-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
1034
Kanpur Dehat
GVPR
20086502
Nahili
1
5
1979
2023
2038
2053
14-Mar-2024
31-Jul-2024
14-Dec-2024
15-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1035
Meerut
Power Mech Projects Ltd
20069024
NAIDU & NAGLA KATAR
2
2
4526
2022
2038
2052
31-Dec-2024
11-Mar-2024
30-Jul-2024
01-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
1036
Bahraich
PNC-SPML-JV
20018643
NAKWA MAHASI PWS
1
2
3588
2022
2037
2052
31-Dec-2025
17-Oct-2025
17-Oct-2025
18-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0501, kindly complete it.
Approved
Scheme Completed with observation
View
1037
Auraiya
Indian Hume Pipe
8360956
Nalhupur, Bhagua
2
8
2575
2022
2037
2052
15-Sep-2022
28-May-2023
02-Dec-2023
03-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1038
Meerut
Power Mech Projects Ltd
20011006
NALPUR
1
1
3728
2022
2037
2052
31-Dec-2024
16-Sep-2023
03-Feb-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1039
Bijnor
LC INFRA
8360402
NALPURA VILLAGE WATER SCHEME
1
1
1950
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
1040
Auraiya
Indian Hume Pipe
20056125
Nandgaon PWS
3
8
1890
2022
2037
2052
22-Sep-2023
10-Oct-2023
31-Jan-2024
01-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1041
Kannauj
GVPR
20066445
NANDLALPUR & GHILOY KHAS GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
2061
2023
2038
2053
16-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1042
Bijnor
LC INFRA
20075930
NANGLA GANNA WATER SUPPLY SCHEME
1
1
2375
2022
2037
2052
31-Dec-2024
28-Jan-2024
03-Aug-2024
04-Aug-2024
Approved
every thing completed
Approved
Compeleted
View
1043
Kannauj
GVPR
20077123
NANHEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2318
2023
2038
2053
09-Aug-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1044
Sultanpur
UNIVERSAL MEP
20066052
NARAHI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3620
2023
2038
2053
12-Jan-2024
12-Jan-2024
06-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1045
Fatehpur
Power Mech Projects Ltd
20079161
NARAICHA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4300
2023
2038
2053
13-Mar-2024
06-Nov-2024
07-Aug-2024
07-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (7.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1046
Hardoi
NCC Ltd.
20011355
NARAINPUR GRANT
1
7
1590
2022
2037
2052
26-Jul-2023
11-Feb-2023
12-Aug-2023
30-Nov-2024
Approved
ok
Approved
OK
View
1047
Meerut
Power Mech Projects Ltd
20066746
NARANGPUR
1
1
3580
2023
2038
2053
31-Dec-2024
06-Nov-2024
25-Mar-2025
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1048
Meerut
Power Mech Projects Ltd
20010915
NARANGPUR
3
3
4737
2022
2037
2052
27-May-2024
31-Dec-2024
13-Oct-2024
14-Oct-2024
Approved
Recommended for further Approval
Pending
View
1049
Ambedkar Nagar
Vindhya-GAJA (JV)
20092701
NARHARIYA KARAMPUR Water Supply Scheme
2
7
3470
2023
2038
2053
24-Mar-2024
01-Jul-2025
17-Oct-2025
18-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1050
Amethi
Vindhya-GAJA (JV)
20068981
NARHARPUR WATER SUPPLY SCHEME
1
4
2270
2023
2038
2053
23-Mar-2024
26-Jun-2024
26-Sep-2024
27-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1051
Kanpur Dehat
Indian Hume Pipe
20015137
NARIHA
1
1
3825
2022
2037
2052
13-Oct-2021
12-Oct-2020
31-Mar-2024
01-Apr-2024
Approved
Forwarded to further action
Approved
All work of scheme found satisfactory
View
1052
Kanpur Dehat
GVPR
20053272
NarKhurd
1
3
2558
2023
2038
2053
18-Nov-2023
27-Apr-2023
10-Sep-2023
11-Sep-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1053
Moradabad
LC INFRA
20015486
Naronda Village Water Supply Scheme
1
1
8145
2022
2037
2052
08-Feb-2024
18-Feb-2024
18-May-2024
19-May-2024
Approved
Ok
Pending
View
1054
Sultanpur
UNIVERSAL MEP
20066074
NARSARA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2670
2023
2038
2053
12-Jan-2024
31-Dec-2024
29-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1055
Etawah
Indian Hume Pipe
20014153
Naseerpur Bhoja
2
2
2580
2022
2037
2052
13-Sep-2021
09-Apr-2023
09-Apr-2024
10-Apr-2024
Approved
All work completed as per approved departmental design and drawing. Water supply is continue from last 1 years. No any leakage or pressure drop found during the final inspection.
Approved
All work of scheme found satisfactory
View
1056
Auraiya
Indian Hume Pipe
20056126
Nasirabad
2
2
3200
2022
2037
2052
22-Sep-2023
01-Mar-2024
15-Jul-2024
16-Jul-2024
Approved
Forwarded for further action.
Pending
View
1057
Ambedkar Nagar
Vindhya-GAJA (JV)
20083477
NASIRPUR CHITTAUNA WSS
4
6
3240
2023
2038
2053
08-Mar-2024
08-Mar-2025
08-Feb-2025
09-Feb-2025
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
1058
Bareilly
NCC Ltd.
20013552
Nathapura Water Supply Scheme
1
1
2216
2022
2037
2052
02-May-2023
04-Feb-2023
04-May-2023
24-Oct-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Pending
View
1059
Farrukhabad
Vindhya-GAJA (JV)
20074586
NATWARA MVS
2
6
2600
2023
2038
2053
31-Mar-2025
05-Sep-2024
01-Jan-2025
12-May-2025
Approved
Ok..
Approved
OK
View
1060
Kanpur Dehat
VSA
20092709
naubadpur
1
1
1918
2023
2038
2023
31-Mar-2024
15-Jan-2024
25-Apr-2024
26-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1061
Farrukhabad
Vindhya-GAJA (JV)
20076891
NAUGAON SVS
1
4
3531
2023
2038
2053
30-May-2025
03-Jun-2024
16-Sep-2024
17-Sep-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1062
Sultanpur
UNIVERSAL MEP
20064699
NAUGVATEER GRAM PANCHAYAT WATER SUPPLY SCHEME
1
14
3460
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
1063
Kanpur Dehat
GVPR
20053281
Nauha Naugaon
1
7
3284
2023
2038
2053
18-Nov-2023
01-Feb-2024
16-Jun-2024
17-Jun-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1064
Ambedkar Nagar
Vindhya-GAJA (JV)
20056723
NAURAHANI RAMPUR WSS
3
9
6820
2023
2038
2053
26-Dec-2023
24-Feb-2025
14-Jul-2025
15-Jul-2025
Approved
Approved Checked and found ok
Approved
CHECKED AND FOUND OK
View
1065
Kannauj
GVPR
20036325
NAURANGPUR NAGARIYA & TIRWA DEHAT GRAMIN PEYJAL YOJNA
2
6
3802
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1066
Auraiya
GVPR
20065296
Nawada Dandu
1
7
4117
2023
2038
2053
06-Jan-2022
08-Jan-2024
31-Aug-2023
09-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1067
Auraiya
GVPR
20025449
NAWADA JWALA PRASAD
3
2
3645
2023
2038
2053
06-Jan-2022
12-Sep-2023
04-Jun-2023
21-Jul-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1068
Hardoi
NCC Ltd.
8362393
NAYA GAON DEORIYA
1
3
2160
2022
2037
2052
05-Mar-2023
05-Feb-2023
04-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1069
Hardoi
NCC Ltd.
20012336
NAYA GAON MUBARAKPUR
1
3
5595
2022
2037
2052
05-Mar-2023
09-Feb-2023
08-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1070
Farrukhabad
Vindhya-GAJA (JV)
20076881
NAYAMATPUR BHUKSI SVS
1
3
1716
2023
2038
2053
31-Mar-2025
30-Jan-2025
14-May-2025
15-May-2025
Approved
OK..
Approved
OK
View
1071
Meerut
Power Mech Projects Ltd
20011114
NEEMKA
4
4
2783
2022
2037
2052
31-Dec-2024
19-Feb-2023
10-Jul-2023
30-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1072
Ayodhya
UNIVERSAL MEP
20030434
NEOTI & KOPAKANP GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
3404
2023
2038
2053
12-Oct-2023
17-Oct-2023
17-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1073
Hardoi
NCC Ltd.
20012481
Newada Chathiya
3
5
2660
2022
2037
2052
26-Jul-2023
24-Feb-2023
23-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1074
Amethi
Vindhya-GAJA (JV)
20085670
NEWADA KISUNPUR GARH WATER SUPPLY SCHEME
2
13
3882
2023
2038
2053
27-Mar-2023
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1075
Azamgarh
LC INFRA
20066405
Newada water supply scheme
2
5
3315
2022
2037
2052
04-Aug-2024
22-Jul-2024
22-Oct-2024
23-Oct-2024
Approved
OK
Approved
OK
View
1076
Farrukhabad
Vindhya-GAJA (JV)
20097912
NIBALPUR SVS
1
1
1395
2023
2038
2053
30-May-2025
02-Jun-2024
02-Jun-2024
03-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1077
Kanpur Dehat
GVPR
20053031
Nibauli bujurg
2
2
2943
2023
2038
2053
17-Nov-2023
21-Dec-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further action.
Approved
All work of scheme found satisfactory
View
1078
Kanpur Dehat
GVPR
20077480
NIGIHIYA
2
4
2203
2023
2038
2053
17-Feb-2024
15-Jan-2024
20-Apr-2024
21-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
1079
Amethi
Vindhya-GAJA (JV)
20067969
NIHAL GARH SAIDA PATTI WATER SUPPLY SCHEME
2
6
2006
2023
2038
2053
22-Mar-2024
22-Jun-2024
23-Sep-2024
24-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1080
Kanpur Dehat
Indian Hume Pipe
20017095
Nihutha
2
2
1460
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Jan-2024
01-Feb-2024
Approved
Forward for Necessary
Approved
All work of scheme found satisfactory
View
1081
Farrukhabad
Vindhya-GAJA (JV)
20076656
NINAURA SHANKLAPUR SADARIAPUR MVS
2
3
2229
2023
2038
2053
30-May-2025
04-Apr-2024
04-Apr-2024
05-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1082
Kanpur Dehat
Indian Hume Pipe
8361988
NINHAURA
1
1
3370
2022
2037
2052
15-Sep-2021
14-Sep-2021
30-Jun-2023
01-Jul-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1083
Hardoi
NCC Ltd.
20010582
Nipaniya W/S
2
4
2350
2022
2037
2052
14-Jun-2023
05-Apr-2023
06-Jul-2023
30-Nov-2024
Approved
ok
Approved
OK
View
1084
Sultanpur
UNIVERSAL MEP
20066442
NIRSAHIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
8
3720
2023
2038
2053
12-Jan-2024
12-Jan-2024
20-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1085
Kanpur Dehat
GVPR
20077486
NIWADA ANI BARIGAON
4
9
3290
2023
2038
2053
17-Feb-2024
18-Nov-2023
02-Apr-2024
03-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1086
Kanpur Dehat
Indian Hume Pipe
20031467
Niwada deoray
1
1
2580
2022
2037
2052
23-Sep-2022
31-Dec-2024
31-Dec-2023
01-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1087
Kannauj
GVPR
20050188
NIYAMATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
4
2966
2023
2038
2053
15-Jun-2024
16-Mar-2024
19-Jun-2024
20-Jun-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1088
Etawah
Indian Hume Pipe
20024493
NIZAMPUR PWS
2
3
2185
2022
2037
2052
22-Sep-2023
16-Mar-2024
22-Jun-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
1089
Kanpur Dehat
VSA
20099336
Nonapur
1
1
2466
2023
2038
2023
31-Mar-2024
02-Feb-2024
11-Jan-2024
12-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1090
Hardoi
NCC Ltd.
20011186
NOORPUR HATHAURA
1
8
6310
2022
2037
2052
05-Mar-2023
19-Dec-2023
18-Mar-2024
24-Dec-2024
Approved
ok
Approved
OK
View
1091
Shahjahanpur
NCC Ltd.
20015952
NOORPUR NURSUIYA
1
1
2210
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Noorpur Nursuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Noorpur Narsuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1092
Kannauj
GVPR
20077106
NUNARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2216
2023
2038
2053
08-Sep-2024
13-Apr-2024
17-Apr-2024
18-Apr-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1093
Auraiya
GVPR
20084701
Nurpur kharagpur
1
4
1578
2023
2038
2053
06-Jan-2022
03-May-2024
25-May-2024
26-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1094
Bijnor
LC INFRA
20011765
Orangpur Jogipura Water Supply Scheme
1
1
2496
2022
2037
2052
10-Feb-2022
13-May-2024
13-May-2024
14-May-2024
Approved
Every thing complete.
Approved
All document complete
View
1095
Ayodhya
UNIVERSAL MEP
20058244
ORAVA & BAKAULI WSS
2
7
4820
2023
2038
2053
19-Mar-2024
04-Oct-2023
05-Oct-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1096
Meerut
Power Mech Projects Ltd
20011596
PABLI KHURD
1
1
2572
2022
2037
2052
31-Dec-2024
28-Dec-2022
31-Mar-2023
11-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
1097
Meerut
Power Mech Projects Ltd
20037233
PACHGAON PATTI AMARSINGH
1
1
4373
2022
2037
2052
31-Dec-2024
17-Jul-2024
05-Jan-2025
06-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1098
Moradabad
LC INFRA
20015867
Pachokra Khanpur Village Water Supply Scheme
1
2
3162
2022
2037
2052
29-Sep-2023
24-Mar-2024
13-Jun-2024
14-Jun-2024
Approved
Ok
Pending
View
1099
Kannauj
GVPR
20066526
PACHORE GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2815
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1100
Maharajganj
JMC - Lakshmi (JV)
20009809
PACHRUKHI Gram Panchayat Water Supply Scheme
1
11
3440
2022
2037
2052
30-Jul-2024
30-Jul-2024
29-Oct-2024
01-Nov-2024
Approved
Ok
Approved
As per JE/AE/TPIA Recommendation Pachrukhi W/S schemes completed. Water supply was provided regular basis.
View
1101
Moradabad
LC INFRA
8360511
Padia Nagla Mustahkam
1
1
4410
2022
2037
2052
19-Sep-2023
28-Dec-2024
27-Mar-2025
28-Mar-2025
Approved
Ok
Pending
View
1102
Bijnor
LC INFRA
20087917
Padli Village Water Supply Scheme
2
2
1981
2022
2037
2052
13-Apr-2023
24-Feb-2025
23-Feb-2005
24-Feb-2025
Approved
Every thing completed.
Approved
Everything Completed.
View
1103
Sultanpur
UNIVERSAL MEP
20066919
PADRE & KANEHATI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
19
5320
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements
View
1104
Fatehpur
Power Mech Projects Ltd
20106722
PADRI NBIPUR
1
1
510
2023
2038
2053
18-Mar-2025
30-Jun-2025
15-Sep-2025
16-Sep-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June(16.06.2025) and Direct Regular water supply is given to the consumers.
Approved
Verified
View
1105
Shahjahanpur
NCC Ltd.
20018036
Padria dalelpur
3
3
3620
2022
2037
2052
31-Dec-2024
31-Jul-2023
30-Oct-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Padaria Dalelpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Pending
View
1106
Mau
LC INFRA
20035392
PAHARIPUR KHIRIYA WATER SUPPLY SCHEME
2
6
2339
2022
2037
2052
06-Jul-2024
03-Nov-2023
06-Jul-2023
26-Nov-2024
Approved
All works of this scheme has been completed and water supply has been start.
Approved
Approved
View
1107
Fatehpur
Power Mech Projects Ltd
20099435
PAHARPUR
2
3
2670
2023
2038
2053
13-Aug-2024
30-Jun-2025
18-Apr-2025
19-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1108
Ambedkar Nagar
Vindhya-GAJA (JV)
20041820
PAHARPUR SULTANPUR WSS
2
3
2510
2023
2038
2053
23-Nov-2023
21-Dec-2024
21-Mar-2025
22-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1109
Sultanpur
UNIVERSAL MEP
20066386
PAHATTEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
2724
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Jun-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1110
Amethi
Gayatri Projects LTD
20101987
PAIGA WATER SUPPLY SCHEME
1
5
1248
2022
2037
2052
26-Nov-2025
25-Jun-2024
26-Sep-2024
15-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1111
Auraiya
GVPR
20084714
Pakhangoi PWS
1
1
1608
2023
2038
2053
01-Jun-2024
30-Apr-2024
29-Apr-2024
01-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1112
Ambedkar Nagar
Vindhya-GAJA (JV)
20096249
PAKRI NAGAUPUR Water Supply Scheme
1
7
2320
2023
2038
2053
08-Mar-2024
25-Jun-2025
28-Oct-2025
29-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1113
Ayodhya
UNIVERSAL MEP
20058437
Pakriyagaon WSS
2
4
2350
2023
2038
2053
22-Jan-2024
02-Jun-2024
02-Jun-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1114
Kannauj
GVPR
20067668
PALA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2071
2023
2038
2053
16-Aug-2024
10-Nov-2024
15-Nov-2024
15-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1115
Shahjahanpur
NCC Ltd.
20033489
Palia
1
1
2200
2022
2037
2052
31-Dec-2024
04-Jan-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Palia scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Pending
View
1116
Kanpur Dehat
GVPR
20065233
Paliya Banskhera
1
6
2744
2023
2038
2053
18-Jan-2024
04-Dec-2023
18-Apr-2024
19-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1117
Kannauj
GVPR
20066652
PALIYA BUNCHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2492
2023
2038
2053
06-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1118
Shahjahanpur
NCC Ltd.
20014817
PALIYA PATTI
2
2
2159
2022
2037
2052
01-Dec-2023
31-Dec-2024
01-Mar-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1119
Kanpur Dehat
Indian Hume Pipe
20111027
Paman
2
3
2405
2022
2037
2052
10-Oct-2023
31-Dec-2024
31-Aug-2024
01-Sep-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1120
Meerut
Power Mech Projects Ltd
8362073
PANCHI
1
1
5693
2022
2037
2052
16-Jul-2023
15-Feb-2023
05-Jul-2023
06-Apr-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1121
Azamgarh
LC INFRA
20058125
Pandaha water supply scheme
4
8
2710
2023
2038
2053
09-May-2024
13-Mar-2024
12-Jun-2024
13-Jun-2024
Approved
ok
Approved
ok
View
1122
Ambedkar Nagar
Vindhya-GAJA (JV)
20041625
PANDEY PAIKAULI
1
7
4750
2023
2038
2053
23-Oct-2023
14-Aug-2024
09-Jul-2025
10-Oct-2025
Approved
Checked and Found OK
Approved
CHECKED AND FOUND OK
View
1123
Lakhimpur Kheri
NCC Ltd.
8359762
PANGI KALAN
1
4
4847
2022
2037
2052
09-Apr-2023
01-Aug-2023
02-Nov-2023
21-Mar-2025
Approved
Approved as per check list
Pending
View
1124
Amethi
Vindhya-GAJA (JV)
20065222
Paniyar Water Supply Scheme
5
17
4114
2023
2038
2053
17-Feb-2024
15-Jun-2025
15-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1125
Shahjahanpur
NCC Ltd.
20019694
Panthi
2
2
2520
2022
2037
2052
31-Aug-2023
31-Dec-2024
11-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1126
Kannauj
GVPR
20050181
PANTHRA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
4077
2023
2038
2053
15-Jun-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
1127
Amroha
OMIL-JWIL (JV)
20023387
PARA KHALSA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2099
2023
2038
2053
31-Dec-2024
30-Nov-2024
08-Mar-2024
30-Nov-2024
Approved
Trial run successfully completed on 10-09-2024
Approved
Approved
View
1128
Ambedkar Nagar
Vindhya-GAJA (JV)
20047603
PARAS KATUI Water Supply Scheme
3
7
3460
2023
2038
2053
23-Nov-2023
03-Apr-2025
03-Apr-2025
04-Apr-2025
Approved
Checked and Verifiyed
Approved
Scheme completed
View
1129
Siddharth Nagar
Megha
8360529
Paraspur GP WSS
1
3
2115
2022
2037
2052
31-Dec-2025
02-Apr-2025
15-Jan-2025
12-Apr-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
1130
Mau
GA INFRA-VPL
20100924
PARASPURA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
850
2023
2038
2053
19-Jan-2025
19-Jan-2025
18-Jan-2025
19-Jan-2025
Approved
APPROVED
Approved
APPROVED
View
1131
Fatehpur
Power Mech Projects Ltd
20102042
PARI NARWA
1
1
1920
2023
2038
2053
24-Jan-2024
23-Jan-2025
19-Aug-2025
20-Aug-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of May(20.05.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1132
Meerut
Power Mech Projects Ltd
20020242
PARIKSHITGARH DEHAT
1
1
3638
2022
2037
2052
31-Dec-2024
14-Jan-2024
01-Jun-2024
18-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1133
Ambedkar Nagar
Vindhya-GAJA (JV)
20068319
PARIYAI WSS
2
5
2970
2023
2038
2053
20-Feb-2024
30-Jun-2025
25-Oct-2025
26-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
1134
Hardoi
NCC Ltd.
20021753
PARSA MOHADDINPUR
3
12
6560
2022
2037
2052
14-Jun-2023
07-Oct-2023
06-Jan-2024
24-Dec-2024
Approved
ok
Approved
OK
View
1135
Sitapur
NCC Ltd.
8362975
PARSADA
1
3
3379
2022
2037
2052
11-Mar-2023
30-Aug-2022
25-Dec-2023
18-Nov-2024
Approved
Work completed as per filled checklist.
Approved
APPROVE
View
1136
Kannauj
GVPR
20036207
PARSARAMAU GRAMIN PEYJAL YOJNA
2
5
3850
2023
2038
2053
13-May-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1137
Kanpur Dehat
GVPR
20065234
PARSAURA
2
3
1955
2023
2038
2053
18-Jan-2024
22-Jul-2024
05-Dec-2024
06-Dec-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1138
Kanpur Dehat
GVPR
20026303
PARSOLI & BHUJPURA
2
5
3674
2023
2038
2053
26-Sep-2023
08-Nov-2023
22-Mar-2024
23-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1139
Amethi
Vindhya-GAJA (JV)
20068382
PARSOYIA WATER SUPPLY SCHEME
2
10
2541
2023
2038
2053
23-Mar-2024
27-Jun-2024
27-Sep-2024
28-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1140
Moradabad
LC INFRA
8359729
Pasia Pura Padarath VILLAGE WATER SCHEME
1
2
4349
2022
2037
2052
31-Dec-2024
21-Oct-2024
19-Jan-2025
20-Jan-2025
Approved
Ok
Pending
View
1141
Ayodhya
UNIVERSAL MEP
20030555
PASTAMAPHI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2590
2023
2038
2053
12-Oct-2023
29-Aug-2023
29-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found correct
View
1142
Meerut
Power Mech Projects Ltd
20012933
PASWARA
1
1
3634
2022
2037
2052
31-Dec-2024
22-Feb-2023
11-Jul-2023
11-Nov-2024
Approved
CHECKED AND VERIFIED....
Approved
approved
View
1143
Sultanpur
UNIVERSAL MEP
20066498
PATAIPUR & NAAUGVA RAYTASI GRAM PANCHAYAT WATER SUPPLY SCHEME
4
8
5110
2023
2038
2053
12-Jan-2024
12-Jan-2024
25-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1144
Ghaziabad
LC INFRA
8360451
PATTI
1
1
2048
2022
2037
2052
31-Mar-2024
10-Mar-2024
10-Mar-2024
01-Apr-2024
Approved
Satisfactory on the work & completed all civil works and E&M works.
Approved
All work checked and recommended for O&M
View
1145
Kannauj
GVPR
20066667
PATTI & BIBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
5
6
2905
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1146
Farrukhabad
Vindhya-GAJA (JV)
20092860
PATTI DARAPUR MVS
3
3
2972
2023
2038
2053
31-Mar-2025
02-Sep-2024
15-Dec-2024
16-Dec-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1147
Meerut
Power Mech Projects Ltd
20098181
PATTI KHERKI
1
1
642
2023
2038
2053
31-Dec-2024
05-Apr-2024
21-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1148
Kannauj
GVPR
20050537
PAURAUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
4735
2023
2038
2053
15-Jun-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
Forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1149
Amethi
Gayatri Projects LTD
20072819
Peeparpur & Naugirwan GP water supply scheme
2
6
2689
2022
2037
2052
13-Aug-2024
25-Jun-2024
29-Sep-2024
16-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1150
Meerut
Power Mech Projects Ltd
20011227
PEPLA
1
1
2911
2022
2037
2052
31-Dec-2024
02-Mar-2023
19-Jul-2023
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1151
Kannauj
GVPR
20077071
PHARHAN GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1774
2023
2038
2053
16-Aug-2024
21-Jan-2025
23-Apr-2025
24-Apr-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1152
Meerut
Power Mech Projects Ltd
20011298
PHITKARI
1
1
5025
2023
2037
2052
31-Dec-2024
17-Mar-2023
05-Aug-2023
10-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1153
Etawah
Indian Hume Pipe
20015030
Phoolpur
1
3
1790
2022
2037
2052
12-Oct-2022
14-Apr-2024
24-Jul-2024
25-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1154
Auraiya
GVPR
20064344
Phoolpur PWS
1
6
3085
2023
2038
2053
01-Jun-2024
01-Oct-2024
30-Sep-2024
01-Oct-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1155
Jaunpur
AFCONS
20044677
PHOOLPUR VILLAGE WATER SUPPLY SCHEME
2
5
2647
2023
2038
2053
18-Nov-2023
15-Feb-2025
15-May-2025
16-May-2025
Approved
ok
Approved
ok
View
1156
Kannauj
GVPR
20077126
PHULANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2931
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1157
Ambedkar Nagar
Vindhya-GAJA (JV)
20068332
PICHAWARA WSS
2
3
1580
2023
2038
2053
08-Mar-2024
15-Jun-2025
14-Oct-2025
15-Oct-2025
Approved
Checked and found ok
Approved
Scheme Completed
View
1158
Mau
LC INFRA
8389108
PIDHWAL
1
10
4349
2022
2037
2052
20-Sep-2023
11-Sep-2024
10-Sep-2024
11-Sep-2024
Approved
Approved
Approved
Approved
View
1159
Moradabad
LC INFRA
20015986
Pilakpur Gumani(m.s.t.) village water supply scheme
1
2
6650
2022
2037
2052
29-Sep-2023
10-Dec-2023
22-Jan-2025
23-Jan-2025
Approved
Ok
Pending
View
1160
Amethi
Gayatri Projects LTD
20035177
PINDARA PARERA WATER SUPPLY SCHEME
1
11
4328
2022
2037
2052
03-Nov-2024
15-May-2024
20-Aug-2024
01-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1161
Ambedkar Nagar
Vindhya-GAJA (JV)
20019810
Pipri Mohammadi
2
7
2053
2023
2038
2053
03-Aug-2023
17-Feb-2025
17-May-2025
18-May-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1162
Hardoi
NCC Ltd.
20011881
PIPRINARAYANPUR
2
4
2320
2022
2037
2052
14-Jun-2023
15-May-2023
17-Aug-2023
17-Dec-2024
Approved
ok
Approved
OK
View
1163
Sultanpur
UNIVERSAL MEP
20066414
PIROOSARAIYA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3790
2023
2038
2053
12-Jan-2024
31-Dec-2024
20-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified, found as per requirements.
View
1164
Etawah
Indian Hume Pipe
20026341
Pirthverampur pWS
1
3
1575
2022
2037
2052
22-Sep-2023
04-Apr-2024
10-Jul-2024
11-Jul-2024
Approved
Dear Sir, the above data has been verified and forwarded to you for further action.
Approved
All work of scheme found satisfactory
View
1165
Kanpur Dehat
GVPR
20025202
PITARAPUR
2
4
3415
2023
2038
2053
26-Sep-2023
01-Sep-2023
12-Jan-2024
13-Jan-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1166
Meerut
Power Mech Projects Ltd
8359771
POHALI
1
1
6287
2022
2037
2052
31-Dec-2024
25-Feb-2024
13-Jul-2024
13-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1167
Meerut
Power Mech Projects Ltd
20011059
POOTHI
1
1
2513
2022
2037
2052
31-Dec-2024
21-Jun-2023
06-Nov-2023
28-May-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1168
Auraiya
GVPR
20091178
Pouthi PWS
2
1
2285
2023
2038
2053
31-Dec-2024
24-Jul-2024
27-Jul-2024
27-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1169
Ambedkar Nagar
Vindhya-GAJA (JV)
20042925
PRATAPIPUR WSS
1
5
4010
2023
2037
2053
23-Nov-2023
14-Jun-2024
02-Dec-2024
03-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
1170
Sultanpur
UNIVERSAL MEP
20066674
PRATAPPUR SECOND & KOTVA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
3620
2023
2038
2053
12-Jan-2024
12-Jan-2024
03-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1171
Jaunpur
Welspun Kaveri Infraprojects JV
20020896
Prempur
2
6
3490
2022
2037
2021
22-May-2023
31-Dec-2024
20-Dec-2024
21-Dec-2024
Approved
Checked & Found ok
Approved
ok
View
1172
Kannauj
GVPR
20043957
PREMPUR GRAMIN PEYJAL YOJNA
2
4
2930
2023
2038
2053
13-May-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1173
Bijnor
LC INFRA
20018334
Prempur Water Supply Scheme
1
1
2200
2022
2037
2052
10-Feb-2024
23-Nov-2023
27-May-2024
28-May-2024
Approved
every thing completed
Approved
Compeleted
View
1174
Auraiya
GVPR
20041733
Pura kalan PWS
3
2
4154
2023
2038
2053
31-Dec-2024
23-Jun-2023
06-May-2024
23-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1175
Amethi
Vindhya-GAJA (JV)
20098338
PURAB DWARA Water Supply Scheme
1
3
1541
2023
2038
2053
04-Jul-2024
11-Nov-2024
11-Feb-2025
10-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1176
Amethi
Vindhya-GAJA (JV)
20085699
PURAB GAON WATER SUPPLY SCHEME
1
11
1863
2023
2038
2053
13-Mar-2024
18-Jun-2024
18-Sep-2024
21-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1177
Ayodhya
UNIVERSAL MEP
20058524
Purain WSS
1
5
5190
2023
2038
2053
12-Oct-2023
02-Sep-2024
02-Sep-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1178
Rampur
SPML Infra
20033276
Purainia Kalan GP W/S Scheme
1
1
2601
2022
2037
2052
01-Nov-2023
08-Nov-2024
08-Feb-2025
09-Feb-2025
Approved
All docs found in order
Pending
View
1179
Kanpur Dehat
GVPR
20069962
puran purwa
1
3
3673
2023
2038
2053
17-Feb-2024
05-Jan-2024
11-Apr-2024
12-Apr-2024
Approved
We cane Approve & refer Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 and SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025.
Approved
All work of scheme found satisfactory
View
1180
Amethi
Vindhya-GAJA (JV)
20098321
PURE MIHIB SHAH Water Supply Scheme
2
7
3000
2023
2038
2053
04-Jul-2024
05-Jun-2024
05-Sep-2024
06-Dec-2024
Approved
All Document not provided by EPC hence returns to the EPC
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1181
Amethi
Vindhya-GAJA (JV)
20067991
PURE PAHAL WAN WATER SUPPLY SCHEME
2
14
2088
2023
2038
2053
07-Feb-2024
22-Jun-2024
22-Sep-2024
23-Dec-2024
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance.
View
1182
Auraiya
GVPR
20099159
Purwa balai
3
2
2102
2023
2038
2053
06-Jan-2022
06-Apr-2024
15-Dec-2023
01-Feb-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1183
Jhansi
DARA ENGINEERING
8135931
Purwa GOV
32
8
77784
2023
2038
2053
11-Jun-2022
01-Apr-2024
23-Dec-2024
24-Dec-2024
Approved
checked
Approved
approved
View
1184
Auraiya
GVPR
20095101
Purwa Rahat PWS
1
1
1474
2023
2038
2033
31-Dec-2024
19-May-2024
08-May-2024
09-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1185
Auraiya
GVPR
20089648
Purwa rawat PWS
4
8
2311
2023
2038
2053
06-Jan-2022
31-Dec-2024
06-Jun-2024
23-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1186
Hardoi
NCC Ltd.
8388443
PURWA WAJI RAO
1
2
3495
2022
2037
2052
05-Mar-2023
16-May-2023
15-Aug-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1187
Auraiya
Indian Hume Pipe
20022753
Pusauli Village Water Supply Schem
2
2
2350
2022
2037
2052
09-May-2022
07-Nov-2023
29-Feb-2024
01-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1188
Meerut
Power Mech Projects Ltd
20011335
PUTHRI
1
1
2513
2022
2037
2052
31-Dec-2024
21-Jun-2023
06-Nov-2023
05-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1189
Gautam Buddha Nagar
LC INFRA
20013502
PYAWALI TAJPUR W/S SCHEME
1
1
5726
2022
2037
2052
07-Feb-2024
15-Dec-2024
15-Sep-2024
15-Dec-2024
Approved
Project certificate is verified
Pending
View
1190
Shahjahanpur
NCC Ltd.
20084376
RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
3300
2023
2038
2053
31-Dec-2024
30-Jun-2023
29-Sep-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of the RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1191
Meerut
Power Mech Projects Ltd
20098098
RAFAN
1
1
1634
2023
2038
2053
11-Jun-2025
26-Oct-2024
15-Mar-2025
01-May-2025
Approved
Recommended for further Approval
Approved
approved
View
1192
Meerut
Power Mech Projects Ltd
20098078
RAGHUNATHPUR
1
1
1285
2023
2038
2053
31-Dec-2024
14-Aug-2024
02-Jan-2025
04-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1193
Shahjahanpur
NCC Ltd.
20014017
Raghunathpur
4
4
2500
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Raghunathpur J Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Raghunathpur J. Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1194
Shahjahanpur
NCC Ltd.
20015591
Raghunathpur Khas
1
1
2810
2022
2037
2052
24-Dec-2023
31-Dec-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of RAGHUNATHPUR KHAS scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Raghunathpur Khas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1195
Ghaziabad
LC INFRA
20021478
RAGHUNATHPUR PWS SCHEME
1
1
2695
2022
2037
2052
09-Feb-2022
30-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
1196
Azamgarh
LC INFRA
20101578
RAGHUNATHPUR WSS
3
9
4161
2023
2038
2053
31-May-2023
25-Jul-2024
24-Oct-2024
25-Oct-2024
Approved
ok
Approved
ok
View
1197
Fatehpur
Power Mech Projects Ltd
20097879
RAHALLAPUR
2
2
2360
2023
2033
2058
13-Aug-2024
30-Jun-2025
29-Apr-2025
30-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1198
Ayodhya
UNIVERSAL MEP
20030535
RAHIMGANJ GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
3120
2023
2038
2053
12-Oct-2023
31-Aug-2023
31-Aug-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
1199
Ambedkar Nagar
Vindhya-GAJA (JV)
20019826
Rahimpur Patti
2
7
3250
2023
2038
2053
03-Aug-2023
20-Jul-2024
02-Dec-2024
03-Dec-2029
Approved
Checked and found ok
Approved
Scheme completed
View
1200
Meerut
Power Mech Projects Ltd
20010922
RAHMAPUR
1
1
2701
2022
2037
2052
31-Dec-2024
19-Dec-2023
05-May-2024
06-Nov-2024
Approved
Recommended for further Approval
Approved
approved
View
1201
Bijnor
LC INFRA
20013983
RAHTI JAGIR WATER SUPPLY SCHEME
1
1
3029
2022
2037
2052
30-Sep-2023
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete
Approved
Everything is Completed.
View
1202
Moradabad
LC INFRA
20014312
Raib Nagla village water supply scheme
1
1
1840
2022
2037
2052
08-Feb-2024
18-Mar-2024
16-Jun-2024
17-Jun-2024
Approved
Ok
Pending
View
1203
Bijnor
LC INFRA
8388868
RAIPUR MAUZAMPUR NARAYAN GRAMPANCHAYAT WATER SUPPLY SCHEME
1
1
2404
2022
2037
2052
13-Sep-2023
14-Nov-2023
27-May-2024
28-May-2024
Approved
Every thing completed.
Approved
EVERY THIS COMPLETED
View
1204
Mau
LC INFRA
20064741
Raisa Gram Panchayat Water Supply Scheme
3
7
2920
2022
2037
2052
05-Jan-2025
01-Apr-2025
01-Apr-2025
05-Apr-2025
Approved
Approved....
Approved
Approved
View
1205
Sultanpur
UNIVERSAL MEP
20064683
RAJAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
10
3110
2023
2038
2053
12-Jan-2024
12-Jan-2024
26-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1206
Shahjahanpur
NCC Ltd.
20015092
Rajepur Raipur
1
2
2430
2022
2037
2052
31-Dec-2024
04-Jan-2024
04-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1207
Kannauj
GVPR
20050182
RAJPUR KARAN GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
1989
2023
2038
2053
15-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1208
Etawah
Indian Hume Pipe
20058832
Rajpurtameri
3
3
2280
2022
2037
2052
05-Jan-2024
09-Jun-2023
13-Dec-2023
14-Dec-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1209
Auraiya
GVPR
20091145
Rajuamau PWS
1
2
3254
2033
2038
2053
06-Jan-2022
19-Apr-2024
18-Apr-2025
20-Apr-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1210
Fatehpur
Power Mech Projects Ltd
20097892
RAKSHAPAL&DARIYAMAU
2
3
4810
2023
2038
2053
26-Sep-2023
25-Sep-2024
04-Dec-2024
05-Dec-2024
Approved
Trial & Run completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers.
Pending
View
1211
Meerut
Power Mech Projects Ltd
8362623
RALI CHAUHAN
1
1
3588
2022
2037
2052
31-Dec-2024
01-Mar-2023
20-Jul-2023
10-Dec-2024
Approved
Recommend for Further Approval
Approved
approved
View
1212
Bijnor
LC INFRA
8388717
RAM NAGER VILLAGE WATER SUPPLY SCHEME
1
1
2430
2022
2037
2052
29-Sep-2023
12-Mar-2024
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
All document checked
View
1213
Farrukhabad
Vindhya-GAJA (JV)
20098004
RAM PURA SVS
1
1
2010
2023
2038
2053
30-May-2025
08-May-2024
08-May-2024
29-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
Ok
View
1214
Amethi
Gayatri Projects LTD
20034985
RAMAE WATER SUPPLY SCHEME
1
4
3002
2022
2037
2052
06-May-2025
21-Jun-2024
24-Sep-2024
06-Nov-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1215
Kanpur Dehat
GVPR
20077563
RAMALNYAI NARSOOJHA
3
4
2808
2023
2038
2053
17-Feb-2024
27-Jan-2024
30-Apr-2024
01-May-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1216
Kannauj
GVPR
20036627
RAMKHERA & SARAI GOPAL GRAMIN PEYJAL YOJNA
2
3
3882
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1217
Sultanpur
UNIVERSAL MEP
20066596
RAMNAGAR BANKATH & UGAIPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
5460
2023
2038
2053
12-Jan-2024
31-Dec-2024
15-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1218
Sultanpur
UNIVERSAL MEP
20067058
RAMNAGAR FIRST & DHABIA GRAM PANCHAYAT WATER SUPPLY SCHEME
3
10
4005
2023
2038
2053
12-Jan-2024
12-Jan-2024
30-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1219
Moradabad
LC INFRA
8360496
Ramnagar Gangpur
1
2
6650
2022
2037
2052
29-Sep-2023
10-Dec-2023
03-Apr-2025
04-May-2025
Approved
Ok
Pending
View
1220
Ambedkar Nagar
Vindhya-GAJA (JV)
20033823
RAMNAGAR NARSINGHPUR WATER SUPPLY SCHEME
2
8
4666
2023
2038
2053
22-Oct-2022
21-Oct-2023
14-Jan-2025
15-Jan-2025
Approved
checked and found ok
Approved
Scheme completed
View
1221
Sultanpur
UNIVERSAL MEP
20077655
RAMPUR & DHARUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
6
3680
2023
2038
2053
12-Jan-2024
12-Jan-2024
12-Feb-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1222
Hardoi
NCC Ltd.
20011899
RAMPUR ATWA
3
4
3060
2022
2037
2052
14-Jun-2023
24-Jul-2023
23-Oct-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1223
Gautam Buddha Nagar
LC INFRA
20017814
RAMPUR BANGER GRAM PANCHAYAT WATER SUPPLY
1
1
4293
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Verified
View
1224
Auraiya
GVPR
20099251
Rampur bihari PWS
3
8
2995
2023
2038
2053
06-Jan-0222
23-Oct-2023
22-Oct-2023
23-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory. All work of scheme found satisfactory.
View
1225
Amethi
Gayatri Projects LTD
20076471
RAMPUR CHAUDHARI & ALIPUR WATER SUPPLY SCHEME
2
10
3234
2022
2037
2052
22-Mar-2025
02-Sep-2024
05-Dec-2024
10-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
1226
Bijnor
LC INFRA
20038886
Rampur Gram Panchayat Water Supply
3
3
1917
2022
2037
2052
14-Nov-2022
06-Jan-2025
06-Jan-2025
07-Jan-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
1227
Ambedkar Nagar
Vindhya-GAJA (JV)
20026107
RAMPUR INDI-PINDI WATER SUPPLY SCHEME
1
1
2200
2023
2038
2053
26-Dec-2023
23-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
1228
Ayodhya
UNIVERSAL MEP
20031499
RAMPUR JANAK & DEVAIT GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
2
5
3740
2023
2038
2053
12-Oct-2023
22-May-2024
22-May-2024
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1229
Mau
LC INFRA
20044981
Rampur Kadhi GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
2
4
1441
2022
2037
2052
02-May-2023
26-Dec-2024
21-Dec-2024
26-Dec-2024
Approved
All Documents Checked $ Verified
Approved
Approved
View
1230
Kanpur Dehat
Indian Hume Pipe
20034292
RAMPUR KUKHAT
1
2
3600
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1231
Kannauj
GVPR
20090117
RAMPUR NIGOH & GHILOEE GHAS GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3179
2023
2038
2053
08-Sep-2024
04-Nov-2024
07-Feb-2025
08-Feb-2025
Approved
forwarded for Further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1232
Ambedkar Nagar
Vindhya-GAJA (JV)
20033825
RAMPUR SAKARWARI WATER SUPPLY SCHEME
4
13
5088
2023
2038
2053
21-Oct-2023
09-Apr-2025
09-Apr-2025
10-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1233
Shahjahanpur
NCC Ltd.
20017965
Rampur W/S
2
2
2340
2022
2037
2052
06-Jul-2024
31-Dec-2024
05-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rampur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1234
Kannauj
GVPR
20050178
RANVEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
8
3048
2023
2038
2053
11-Jun-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1235
Hardoi
NCC Ltd.
20058225
RARA JJM
1
8
4910
2023
2038
2053
26-Jul-2024
11-Oct-2024
10-Jan-2025
25-Sep-2025
Approved
ok
Approved
Ok
View
1236
Mau
LC INFRA
8360470
RASADI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
3
5
2728
2022
2037
2052
20-Sep-2023
05-Nov-2024
02-Nov-2024
05-Nov-2024
Approved
Approved....
Approved
Approved.
View
1237
Ayodhya
UNIVERSAL MEP
20031488
RASEED PATTI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2460
2023
2038
2053
12-Oct-2023
14-Jan-2025
14-Jan-2025
01-Feb-2025
Approved
FOUND OK
Pending
View
1238
Amethi
Gayatri Projects LTD
20102462
RASOOLABADH WATER SUPPLY SCHEME
1
14
5536
2022
2037
2052
27-Jun-2024
03-Jun-2024
06-Sep-2024
15-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
1239
Kanpur Dehat
GVPR
20077538
RASOOLPUR RASULABAD
2
4
1849
2023
2038
2053
17-Feb-2024
21-Nov-2023
05-Apr-2024
06-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1240
Bahraich
PNC-SPML-JV
20014668
RASOOLPUR SARRAIYA CHITTAURA PWS
1
7
3588
2022
2037
2052
31-Dec-2025
07-Oct-2025
07-Oct-2025
08-Oct-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0143 kindly complete it.
Approved
SCHEME COMPLETED
View
1241
Etawah
Indian Hume Pipe
20026096
Rasulabad PWS
1
2
1450
2022
2037
2052
22-Sep-2023
27-Feb-2024
08-Jun-2024
09-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
1242
Kannauj
GVPR
20077066
RASULPUR BIKUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
3054
2023
2038
2053
16-Aug-2024
31-Mar-2024
03-Jul-2024
04-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1243
Meerut
Power Mech Projects Ltd
20020267
RASULPUR DANTLA
1
1
2776
2023
2037
2052
31-Dec-2024
16-Dec-2023
03-May-2024
17-Feb-2025
Approved
Recommended for Further Approval
Approved
approved
View
1244
Meerut
Power Mech Projects Ltd
20078572
RASULPUR IKLA WATER SUPPLY SCHEME
1
1
5297
2023
2038
2053
31-Dec-2024
05-Apr-2024
21-Aug-2024
07-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1245
Meerut
Power Mech Projects Ltd
20067224
RASULPUR MURADNAGAR & TANDI
2
2
3235
2022
2037
2052
31-Dec-2024
24-Mar-2024
09-Aug-2024
05-Feb-2025
Approved
Recommended for further Approval
Approved
approved
View
1246
Fatehpur
Power Mech Projects Ltd
20097478
RASULPUR URF VAISAPUR
1
1
1730
2023
2038
2053
15-Apr-2025
07-Jan-2025
07-Jan-2025
08-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (08.10.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1247
Bijnor
Vindhya-GAJA (JV)
20102321
RASULPUR VEERAN WSS
2
2
370
2022
2037
2052
06-Jul-2023
12-Feb-2025
12-Aug-2025
13-Aug-2025
Approved
Every thing complete.
Approved
All document complete
View
1248
Mau
LC INFRA
20025893
Rasulpur Water Supply Scheme
4
12
1881
2022
2037
2052
30-Nov-2023
25-Mar-2025
12-Jun-2024
25-Mar-2025
Approved
All Documents Checked $ Verified
Approved
Approved.
View
1249
Farrukhabad
Vindhya-GAJA (JV)
20093046
RATANPUR PAMARAN SVS
1
1
2001
2023
2038
2053
30-May-2025
31-Jan-2024
15-May-2024
16-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1250
Shahjahanpur
NCC Ltd.
20015651
Rath
2
2
2600
2022
2037
2052
31-Dec-2024
20-Jul-2024
19-Oct-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Rath WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Rath scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1251
Meerut
Power Mech Projects Ltd
20098095
RATHAURA KHURD
1
1
1362
2023
2038
2053
31-Jan-2025
28-Sep-2024
14-Feb-2025
15-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1252
Farrukhabad
Vindhya-GAJA (JV)
20076894
RATHAURA MUHIUDDINPUR SVS
1
2
2295
2023
2038
2053
31-Mar-2025
11-Oct-2024
02-Feb-2025
03-Feb-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
OK
View
1253
Muzaffarnagar
Gayatri Projects LTD
20098063
RATHUR GP RO WSS
1
1
1771
2023
2038
2053
16-Sep-2022
02-Dec-2024
02-Mar-2025
03-Mar-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
1254
Kanpur Dehat
GVPR
20065237
RATNIYAPUR
2
3
2680
2023
2038
2053
18-Jan-2024
08-Dec-2023
12-Dec-2023
16-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1255
Farrukhabad
Vindhya-GAJA (JV)
20074585
REHA KARANPUR MVS
4
5
4507
2023
2038
2053
30-May-2025
26-Apr-2024
26-Apr-2024
27-Apr-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1256
Meerut
Power Mech Projects Ltd
20058444
REHADRA & MURADGAON URF KUWAKHEDA
2
2
2720
2022
2037
2052
31-Dec-2024
25-Mar-2024
10-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1257
Moradabad
LC INFRA
20087133
Rehta Mafi (RO) VWSS
1
1
9350
2022
2037
2052
08-Mar-2024
04-Jul-2024
02-Oct-2024
03-Oct-2024
Approved
Ok
Pending
View
1258
Kannauj
GVPR
20077109
RERI & RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
1976
2023
2038
2053
08-Sep-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1259
Ambedkar Nagar
Vindhya-GAJA (JV)
20056396
REWALI WSS
1
4
3850
2023
2038
2053
28-Jun-2023
25-Dec-2024
31-Mar-2025
01-Apr-2025
Approved
checked and found ok
Approved
Scheme completed
View
1260
Kannauj
GVPR
20077103
RITUKALA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1746
2023
2038
2053
08-Sep-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1261
Mau
LC INFRA
8389102
RIYAV
3
5
3472
2022
2036
2052
20-Sep-2023
25-Oct-2024
20-Oct-2024
25-Oct-2024
Approved
Approved.
Approved
Approved..
View
1262
Mau
LC INFRA
20085245
RO MAIDPUR SAMASTPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1520
2022
2037
2052
02-Mar-2025
02-Apr-2024
02-Apr-2025
03-Apr-2025
Approved
Approved..
Approved
Approved..
View
1263
Ambedkar Nagar
Vindhya-GAJA (JV)
20084870
ROHAN PARA WSS
2
2
3380
2023
2038
2053
20-Mar-2024
23-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
1264
Muzaffarnagar
Gayatri Projects LTD
20022060
Roni harjipur
1
1
8632
2023
2038
2053
04-Feb-2024
05-Nov-2023
05-Feb-2024
06-Feb-2024
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1265
Auraiya
GVPR
20087930
Rooppur Sahar
2
6
3478
2023
2038
2053
22-Mar-2024
07-Jun-2024
06-Jun-2024
08-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1266
Kannauj
GVPR
20067644
ROOR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
7
3352
2023
2038
2053
16-Aug-2024
03-May-2024
07-Aug-2024
08-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
1267
Kanpur Dehat
Indian Hume Pipe
8361972
ROSHANMAU
1
1
2290
2022
2037
2052
14-Sep-2022
31-Dec-2024
15-Feb-2024
01-Mar-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1268
Farrukhabad
Vindhya-GAJA (JV)
20074155
ROSHNABAD SVS
1
5
3593
2023
2038
2053
31-Mar-2025
18-Sep-2024
31-Dec-2024
13-May-2025
Approved
Ok..
Approved
ok
View
1269
Shahjahanpur
NCC Ltd.
20014018
Rpujari W/s
1
1
3010
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rujaari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Rpujari scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1270
Ambedkar Nagar
Welspun Kaveri Infraprojects JV
20008677
Rukunpur Kasimpur
1
8
4912
2022
2037
2052
06-Jul-2023
27-Apr-2025
15-Jun-2024
28-Apr-2025
Approved
checked and found ok
Approved
Scheme completed
View
1271
Farrukhabad
Vindhya-GAJA (JV)
20091689
RUP NAGAR MVS
1
6
4096
2023
2038
2053
30-May-2025
04-Mar-2024
17-Jun-2024
18-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1272
Kanpur Dehat
Indian Hume Pipe
20012976
Rurgaon
2
5
4400
2022
2037
2052
05-Feb-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1273
Moradabad
LC INFRA
8360484
RUSTAMPUR TIGRI VILLAGE WATER SUPPLY SCHEME
1
1
9918
2022
2037
2052
02-Nov-2023
01-May-2024
30-Jul-2024
31-Jul-2024
Approved
Ok
Pending
View
1274
Kanpur Dehat
GVPR
20053422
SABDALPUR
2
1
2040
2023
2038
2053
18-Nov-2023
23-Nov-2023
07-Apr-2024
08-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1275
Etawah
Indian Hume Pipe
20024515
SABDALPUR DAUDPUR
3
5
2350
2022
2037
2052
22-Sep-2023
22-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
Forwarded for further action.
Approved
All works are satisfactory.
View
1276
Bijnor
LC INFRA
8360409
SABDALPUR VILLAGE WATER SUPPLY SCHEME
1
1
2754
2022
2037
2052
23-Sep-2023
05-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
1277
Bijnor
LC INFRA
8360415
SABHACHANDPUR MOHAN (111972) GRAMPANCHAYAT WATER SUPPLY
1
1
1428
2022
2037
2052
29-Sep-2023
12-Dec-2023
12-Dec-2023
13-Dec-2023
Approved
Every thing completed
Approved
Everything Completed
View
1278
Bijnor
LC INFRA
20095656
SADAKPUR VILLAGE WSS
1
1
2518
2022
2037
2052
03-Apr-2023
23-Oct-2024
23-Oct-2024
24-Oct-2024
Approved
Every thing complete.
Approved
All document complete
View
1279
Bijnor
LC INFRA
20011786
Saddovar Bila Ahatmali Village Water Supply Scheme
2
1
3379
2022
2037
2052
09-Feb-2022
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
every thing completed
Approved
Everything Completed
View
1280
Kanpur Dehat
VSA
20094256
Sadhuapur
2
2
1986
2023
2038
2023
30-Apr-2023
31-Dec-2023
15-Apr-2024
16-Apr-2024
Approved
forward for further action and refer to our letter SWSM/BLG/TPI/KD/P-3/L-6759 DT.29-09-2025. Balance work complete within one week as assure by TKC representative .
Approved
All work of scheme found satisfactory
View
1281
Amethi
Gayatri Projects LTD
20098293
SADIPUR WATER SUPPLY SCHEME
1
3
2882
2022
2037
2052
27-May-2025
07-Sep-2024
13-Dec-2024
15-Mar-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance...
View
1282
Meerut
Power Mech Projects Ltd
20012824
SADULLAPUR URF CHANDPURA
1
1
3061
2022
2037
2052
31-Dec-2024
19-Dec-2022
08-May-2023
26-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1283
Shahjahanpur
NCC Ltd.
20019697
Saftyara
1
2
2740
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAFTYARA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Saftyara scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1284
Ambedkar Nagar
Vindhya-GAJA (JV)
20047661
SAHABUDDINPUR Water Supply Scheme
1
2
2310
2023
2038
2053
19-Sep-2023
21-Mar-2025
21-Mar-2025
22-Mar-2025
Approved
CHECKED AND FOUND OK
Approved
Scheme completed
View
1285
Bijnor
LC INFRA
20087919
Sahapur Sukkha Village Water Supply Scheme
2
2
1578
2022
2037
2052
13-Mar-2023
18-Jul-2024
19-Oct-2024
20-Oct-2024
Approved
Every thing complete.
Approved
Everything is Completed.
View
1286
Ambedkar Nagar
Vindhya-GAJA (JV)
20026097
SAHJANA HAMJAPUR WATER SUPPLY SCHEME
1
2
4320
2023
2038
2053
28-Sep-2023
14-Aug-2024
05-Dec-2024
06-Dec-2024
Approved
Checked and found ok
Approved
SCHEME COMPLETED
View
1287
Shahjahanpur
NCC Ltd.
20018013
Sahora
2
2
2910
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sahora scheme have been checked and verified. The submitted records are recommended and forwarded for further
Approved
All information on the portal for the completion certificate of Sahora scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1288
Bijnor
Vindhya-GAJA (JV)
20021786
Sahrifpur Gram Panchayat Water Supply
3
3
2742
2023
2038
2053
06-Jul-2023
10-Oct-2024
10-Apr-2025
11-Apr-2025
Approved
Every thing complete.
Approved
Everything complete
View
1289
Kannauj
GVPR
20077108
SAHROI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
5
2764
2023
2038
2053
08-Sep-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1290
Ambedkar Nagar
Vindhya-GAJA (JV)
20058740
SAIDPUR RASEEDPUR WSS
4
16
4420
2023
2038
2053
26-Dec-2023
28-Jun-2025
21-Oct-2025
22-Oct-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme Completed
View
1291
Bijnor
LC INFRA
20076114
SAIFPUR BANGAR WATER SUPPLY SCHEME
4
4
1605
2022
2037
2052
03-Feb-2023
16-Dec-2024
16-Dec-2024
17-Dec-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1292
Sultanpur
UNIVERSAL MEP
20066432
SAINI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
5
3200
2023
2038
2053
12-Jan-2024
12-Jan-2024
02-Dec-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1293
Kanpur Dehat
Indian Hume Pipe
20012636
Saintha
1
4
4300
2022
2037
2052
13-Oct-2021
12-Oct-2022
31-Aug-2023
01-Sep-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1294
Amethi
Vindhya-GAJA (JV)
20085696
SAITHA WATER SUPPLY SCHEME
1
19
5011
2023
2038
2053
29-Apr-2024
30-Jun-2025
15-Mar-2025
16-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1295
Gautam Buddha Nagar
LC INFRA
20013504
SAITHALI W/S SCHEME
1
1
3799
2022
2037
2052
07-Feb-2024
01-Dec-2024
01-Sep-2024
01-Dec-2024
Approved
Project certificate is verified
Pending
View
1296
Kannauj
GVPR
20036477
SAKARBABA & TILAK SARAI & BHAWANI SARAI
3
8
6110
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1297
Kannauj
GVPR
20077097
SAKHAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2467
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
1298
Bijnor
LC INFRA
20011779
Saktalpur Milak Water Supply Scheme
2
2
2870
2022
2037
2052
10-Feb-2022
09-Aug-2024
09-Aug-2024
10-Aug-2024
Approved
Every thing completed
Approved
Everything is completed
View
1299
Ghaziabad
LC INFRA
20096363
SAKURPUR VILLAGE WATER SUPPLY SCHEME
1
1
4120
2022
2037
2052
09-Feb-2022
30-Sep-2024
31-Jan-2025
01-Mar-2025
Approved
Satisfactory on the work. All civil works and E&M works are completed.
Approved
All documents find satisfactory
View
1300
Ambedkar Nagar
Vindhya-GAJA (JV)
20100682
Salahuddinpur Water Supply Scheme
1
2
1610
2023
2038
2053
17-May-2024
24-Nov-2024
24-Feb-2025
25-Feb-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1301
Bijnor
LC INFRA
20051674
SALAIMPUR
1
1
2670
2022
2037
2052
03-Dec-2022
25-Mar-2025
25-Mar-2025
26-Mar-2025
Approved
Every thing complete.
Approved
Everything Completed.
View
1302
Auraiya
GVPR
20025228
Salaiya PWS
3
2
3510
2023
2038
2053
26-Sep-2022
25-Sep-2023
08-Jun-2023
01-Nov-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1303
Ambedkar Nagar
Vindhya-GAJA (JV)
20059385
SALARPUR Water Supply Scheme
2
3
2230
2023
2038
2053
26-Dec-2023
27-Nov-2024
27-Feb-2025
28-Feb-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
1304
Ayodhya
VSA
20061583
SALARPUR WSS
1
2
2260
2023
2038
2053
20-Feb-2024
04-Jul-2024
04-Jul-2024
03-Feb-2025
Approved
FOUND OK
Pending
View
1305
Shahjahanpur
NCC Ltd.
8362103
SALEMPUR BUZURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
4
4
2000
2022
2037
2052
31-Dec-2024
30-Sep-2023
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Salempur Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Salempur Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1306
Kannauj
GVPR
20067697
SALEMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2595
2023
2038
2053
15-Jun-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1307
Kanpur Dehat
GVPR
20053528
SALEMPUR MAHERA1
2
0
4201
2023
2038
2053
18-Nov-2023
22-Oct-2023
06-Mar-2024
07-Mar-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1308
Auraiya
Indian Hume Pipe
20033782
SALEMPUR NABAL SINGH PWS
2
2
1800
2022
2037
2052
22-Sep-2023
20-Jun-2023
04-Oct-2023
05-Oct-2023
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1309
Auraiya
GVPR
20040107
Salempur PWS
1
2
2693
2023
2038
2053
06-Jan-2022
31-Dec-2024
23-Apr-2024
25-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1310
Kannauj
GVPR
20036899
SALEMPUR RAUPALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
6
3171
2023
2038
2053
15-Jun-2024
30-Apr-2024
03-Aug-2024
04-Aug-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
1311
Kannauj
GVPR
20050184
SALEMPUR TARA BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2038
2023
2038
2053
15-Jun-2024
28-Mar-2024
30-Jun-2024
01-Jul-2024
Approved
forwarded for further action
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1312
Gautam Buddha Nagar
LC INFRA
20097860
SALEPUR VILLAGE WATER SUPPLY SCHEME
1
1
2401
2022
2037
2052
07-Feb-2024
15-Dec-2024
15-Sep-2024
15-Dec-2024
Approved
Project certificate is verified
Pending
View
1313
Auraiya
Indian Hume Pipe
20055881
Salhoopur PWS
1
3
1760
2022
2037
2052
22-Sep-2023
15-Jul-2023
19-Jul-2024
20-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1314
Shahjahanpur
NCC Ltd.
20019652
SALLIA
2
2
3340
2022
2037
2052
31-Dec-2024
02-Sep-2024
02-Dec-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SALLIA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
Approved
All information on the portal for the completion certificate of Sallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1315
Mau
LC INFRA
20012740
SAMANPURA, GP-WATER SUPPLY SCHEME
2
6
2109
2022
2037
2052
20-Mar-2024
10-Jan-2025
09-Jan-2025
10-Jan-2025
Approved
Approved
Approved
Approved..
View
1316
Meerut
Power Mech Projects Ltd
8362752
SAMASPUR
1
1
2450
2022
2037
2052
31-Dec-2024
12-Feb-2024
21-Apr-2023
25-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1317
Meerut
Power Mech Projects Ltd
20020955
SAMASPUR (HASTINAPUR)
2
2
1723
2022
2037
2052
31-Dec-2024
15-Jun-2023
30-Jan-2023
30-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1318
Ghaziabad
LC INFRA
20104991
SAMAYPUR VILLAGE WATER SUPPLY SCHEME
1
1
2131
2022
2033
2052
09-Feb-2022
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Satisfactory on the work. All Civil works and E&M works are completed.
Approved
All Work Completed
View
1319
Moradabad
LC INFRA
20011067
Samdi village water suplly scheme
1
2
3710
2022
2037
2052
08-Feb-2024
02-Jan-2025
01-Apr-2025
02-Apr-2025
Approved
Ok
Pending
View
1320
Meerut
Power Mech Projects Ltd
20020246
SAMOLI SALEMPUR
1
1
5141
2022
2037
2052
04-Feb-2024
20-Sep-2024
06-Feb-2025
06-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1321
Amethi
Vindhya-GAJA (JV)
20068050
SANAHA WATER SUPPLY SCHEME
1
2
2680
2023
2038
2053
01-Jun-2024
05-Nov-2024
09-Sep-2024
12-Aug-2024
Approved
Hardcopy submitted
Approved
All Things Are Found Satisfactory , Scheme is Finalized For Operation and Maintenance
View
1322
Kannauj
GVPR
20036125
SANDA GRAMIN PEYJAY YOJNA
3
5
3403
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1323
Kanpur Dehat
Indian Hume Pipe
20012576
Sangansiyapur
1
3
2880
2022
2037
2052
13-Oct-2021
12-Oct-2022
30-Sep-2023
01-Oct-2023
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1324
Amethi
Vindhya-GAJA (JV)
20068350
SANGRAMPUR & GOOJIPUR WATER SUPPLY SCHEME
3
18
5465
2023
2038
2053
23-Mar-2024
30-Jun-2025
12-Mar-2025
13-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1325
Fatehpur
Power Mech Projects Ltd
20095909
SANGRAMPUR,BHAKRANA
3
4
4670
2023
2038
2058
15-May-2023
30-Jun-2025
18-Dec-2024
19-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1326
Meerut
Power Mech Projects Ltd
20031790
SANOTA - PINAI - KUNDA
3
3
6832
2023
2038
2053
31-Dec-2024
05-Sep-2024
22-Jan-2025
23-Jan-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1327
Auraiya
GVPR
20095107
Sanwaliya PWS
1
2
1643
2023
2038
2053
01-Jun-2024
06-Apr-2024
01-Mar-2024
19-Apr-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1328
Sultanpur
UNIVERSAL MEP
20066727
SARAI & BAGGA & TAUDHIKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
9
4510
2023
2038
2053
12-Jan-2024
31-Dec-2024
11-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1329
Fatehpur
Power Mech Projects Ltd
20097755
SARAI IDRISH & LADLEPUR
2
4
3020
2023
2038
2058
14-May-2024
30-Jun-2025
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August(12.08.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1330
Auraiya
Indian Hume Pipe
20022758
Sarai Khati Water Supply Scheme
1
3
1280
2022
2037
2052
08-May-2023
28-Dec-2023
31-Mar-2024
01-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1331
Ayodhya
UNIVERSAL MEP
20078591
SARAI PEER WSS
2
2
2110
2023
2038
2053
21-Jun-2024
04-Oct-2024
04-Oct-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1332
Auraiya
GVPR
20091164
Sarai pratham PWS
1
3
3125
2023
2038
2053
01-Jun-2024
04-May-2025
03-May-2025
05-May-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1333
Kannauj
GVPR
20036655
SARAI SUNDAR & KUNWARPUR JANU GRAMIN PEYJAL YOJNA
3
7
4118
2023
2038
2053
15-Mar-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1334
Kannauj
GVPR
20067284
SARAI THEKU GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
2658
2023
2038
2053
16-Aug-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1335
Sultanpur
UNIVERSAL MEP
20066385
SARAIYA BHARTHI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
13
2849
2023
2038
2053
12-Jan-2024
12-Jan-2024
01-Jul-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1336
Gautam Buddha Nagar
LC INFRA
20097856
SARAKPUR VILLAGE WATER SUPPLY SCHEME
1
1
1080
2022
2037
2052
07-Feb-2024
10-Jan-2025
10-Oct-2024
10-Jan-2025
Approved
Project certificate is verified
Pending
View
1337
Meerut
Power Mech Projects Ltd
20037263
SARANPUR
2
2
2548
2022
2037
2052
31-Dec-2024
01-Feb-2024
19-Jun-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1338
Sultanpur
UNIVERSAL MEP
20066481
SARAV & MUDWA GRAM PANCHAYAT WATER SUPPLY SCHEME
5
14
5740
2023
2038
2053
12-Jan-2024
31-Dec-2024
31-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1339
Fatehpur
Power Mech Projects Ltd
20097905
Saray Mohan Salempur
3
3
2860
2023
2038
2053
20-Sep-2024
22-Oct-2024
22-Oct-2024
23-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (23.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1340
Hardoi
NCC Ltd.
20021344
SARAYA
2
6
3740
2022
2037
2052
26-Jul-2023
12-Sep-2023
11-Dec-2023
25-Dec-2024
Approved
ok
Approved
OK
View
1341
Kannauj
GVPR
20036511
SARDA MAI & DHARNIDHARPUR NAGARIYA GRAMIN PEYJAL YOJNA
2
12
5170
2023
2038
2053
13-May-2024
25-Mar-2024
27-Jun-2024
28-Jun-2024
Approved
FORWARDED FOR FURTHER ACTION
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1342
Kannauj
GVPR
20077074
SARDAPUR & KUSKA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
5
3156
2023
2038
2053
08-Sep-2024
22-Mar-2024
24-Jun-2024
25-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1343
Kanpur Dehat
Indian Hume Pipe
20012964
Sardarpur
2
2
3425
2022
2037
2052
05-Feb-2022
04-Feb-2022
31-Mar-2024
01-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1344
Bijnor
LC INFRA
20025878
Sareefpur Malakpur Water Supply Scheme
3
3
2930
2022
2037
2052
18-Aug-2022
03-Mar-2024
04-Jun-2024
05-Jun-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1345
Etawah
Indian Hume Pipe
20015039
Sarekhipura
1
3
2130
2022
2037
2052
08-May-2023
03-Nov-2023
26-Mar-2024
25-Jun-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory
View
1346
Kanpur Dehat
Indian Hume Pipe
20025481
Sargaon Khurd
1
2
2750
2022
2037
2052
24-Aug-2022
31-Dec-2024
30-Oct-2024
01-Feb-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
1347
Mau
GA INFRA-VPL
20093521
SARHASA ZAMIN SARHASA, PAHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
7
3550
2023
2038
2053
19-Mar-2025
19-Mar-2025
18-Mar-2025
19-Mar-2025
Approved
Approved
Approved
Approved
View
1348
Amethi
Vindhya-GAJA (JV)
20070856
SARIYA DUBAAN WATER SUPPLY SCHEME
1
9
2190
2023
2033
2053
07-Feb-2024
23-Dec-2024
23-Mar-2025
09-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1349
Raebareli
NCC Ltd.
20011086
Saroura GP Water Supply Scheme
1
3
2037
2022
2037
2052
16-Jul-2023
21-Jul-2024
08-Jan-2024
21-Nov-2024
Approved
Ok
Approved
Ok
View
1350
Farrukhabad
Vindhya-GAJA (JV)
20075398
SARPARPUR, RASIDPUR TARAI & UGARPUR MVS
4
10
4735
2023
2038
2053
31-Mar-2025
02-Apr-2024
31-Jul-2024
01-Aug-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1351
Meerut
Power Mech Projects Ltd
20020253
SARSWA
1
1
3773
2022
2037
2052
31-Dec-2024
25-Sep-2024
11-Feb-2025
12-Feb-2025
Approved
Recommended for further Approvals.
Approved
approved
View
1352
Fatehpur
Power Mech Projects Ltd
20102039
SARWAL
1
1
1726
2023
2038
2053
21-Sep-2023
03-Jan-2025
24-May-2025
25-May-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of February(25.2.2025) and Regular water supply is given to the consumers.
Approved
Verified
View
1353
Fatehpur
Power Mech Projects Ltd
20097832
SATO JOGA
1
5
4900
2023
2038
2053
25-Oct-2024
16-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (16.10.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1354
Fatehpur
Power Mech Projects Ltd
20097536
SATO PEET
1
3
2550
2023
2038
2053
20-Sep-2024
23-Apr-2025
23-Apr-2025
24-Apr-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of January ( 24.01.2025) and Regular water supply is given to the consumers.
Approved
Verify
View
1355
Kannauj
GVPR
20067330
SATOURA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
5356
2023
2038
2053
16-Aug-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1356
Ambedkar Nagar
Vindhya-GAJA (JV)
20072736
SATRAHI WSS
1
4
2685
2023
2038
2053
22-Mar-2024
05-Apr-2025
05-Apr-2025
06-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1357
Meerut
Power Mech Projects Ltd
20010916
SATWAI
2
1
3992
2022
2037
2052
16-Jul-2023
14-Mar-2023
01-Aug-2023
13-Dec-2024
Approved
Recommended for further Approval
Approved
approved
View
1358
Amethi
Vindhya-GAJA (JV)
20066500
SAUNA WATER SUPPLY SCHEME
1
4
2965
2023
2038
2053
22-Dec-2023
29-Dec-2024
29-Mar-2025
30-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1359
Kannauj
GVPR
20099738
SAURIKH DEHAT GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3454
2023
2038
2053
16-Aug-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1360
Ayodhya
UNIVERSAL MEP
20030225
SEEWAN GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
2640
2023
2038
2053
12-Oct-2023
11-Dec-2023
11-Dec-2023
30-Nov-2024
Approved
FOUND OK
Pending
View
1361
Auraiya
GVPR
20065273
Seganputta & jalupurPWS
3
5
821
2023
2038
2053
01-Jun-2024
18-Jan-2025
17-Jan-2025
20-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1362
Fatehpur
Power Mech Projects Ltd
20095915
SEMARI
2
7
3840
2023
2038
2053
25-Sep-2024
30-Jun-0020
11-Nov-2024
12-Nov-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024)
Approved
Verified
View
1363
Bahraich
PNC-SPML-JV
20020733
SEMRAUNA VISESHWARGANJ PWS
1
2
8653
2022
2037
2052
31-Dec-2025
21-Aug-2025
21-Aug-2025
22-Aug-2025
Approved
scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1953 kindly complete it.
Approved
SCHEME COMPLETED
View
1364
Meerut
Power Mech Projects Ltd
8362763
SET KUAN
1
1
1734
2022
2037
2052
31-Dec-2024
05-Jan-2023
24-May-2023
17-Dec-2024
Approved
Recommended for Further Approval
Approved
approved
View
1365
Ambedkar Nagar
Vindhya-GAJA (JV)
20026061
SETHA KALA WATER SUPPLY SCHEME
2
7
4530
2023
2038
2053
28-Sep-2023
12-Feb-2024
30-Jun-2024
01-Jul-2024
Approved
Checked and found ok
Approved
Scheme completed
View
1366
Hardoi
NCC Ltd.
20085610
SEVA
1
2
1710
2022
2037
2052
26-Jul-2023
28-Feb-2023
27-May-2023
24-Dec-2024
Approved
ok
Approved
OK
View
1367
Sultanpur
UNIVERSAL MEP
20066347
SEWARA WATER SUPPLY SCHEME
3
21
4940
2023
2038
2053
12-Jan-2024
31-Dec-2024
11-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1368
Sultanpur
UNIVERSAL MEP
20064745
SHADIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3640
2023
2038
2053
12-Jan-2024
12-Jan-2024
29-Mar-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1369
Bijnor
LC INFRA
8361240
SHADIPUR GRAMPANCHAYAT WATER SUPPLY SCHEME
2
2
5063
2022
2037
2052
24-Sep-2023
11-Feb-2024
10-Aug-2024
11-Aug-2024
Approved
Every thing complete.
Approved
All Documents checked and verified
View
1370
Bijnor
LC INFRA
20012936
SHADIPUR KALAN WATER SUPPLY SCHEME
1
2
2359
2022
2037
2052
02-Nov-2023
18-Jan-2024
24-Jul-2024
25-Jul-2024
Approved
every thing completed.
Approved
Everything Completed
View
1371
Meerut
Power Mech Projects Ltd
20031852
SHAH KULIPUR - MANPUR
2
2
4274
2023
2038
2053
31-Dec-2024
12-Mar-2024
30-Jul-2024
21-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1372
Kannauj
GVPR
20067689
SHAH NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2762
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1373
Bijnor
LC INFRA
20051664
SHAHABPURA
1
1
3563
2022
2037
2052
03-Dec-2022
16-Nov-2024
16-Nov-2024
17-Nov-2024
Approved
Every thing complete.
Approved
Every thing is completed.
View
1374
Bijnor
LC INFRA
20087918
Shahabpura Ratan Singh Village Water Supply Scheme
3
3
6354
2022
2037
2052
13-Mar-2025
15-Apr-2024
23-Aug-2024
24-Aug-2024
Approved
every thing completed.
Approved
Every thing is completed
View
1375
Bijnor
LC INFRA
8361855
SHAHADPUR GULAL VILLAGE WATER SCHEME
1
1
2282
2022
2037
2052
13-Apr-2023
08-Jul-2024
15-Jan-2025
16-Jan-2025
Approved
Everything Complete.
Approved
Everything Complete.
View
1376
Ayodhya
UNIVERSAL MEP
20030398
SHAHBAZPUR & PHELSANDA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
5
3220
2023
2038
2053
12-Oct-2023
20-Aug-2023
20-Aug-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1377
Kanpur Dehat
GVPR
20070706
Shahi
1
3
1299
2023
2038
2053
17-Feb-2024
18-Dec-2023
23-Mar-2024
24-Apr-2024
Approved
Forward for further action
Approved
All work of scheme found satisfactory
View
1378
Fatehpur
Power Mech Projects Ltd
20100816
SHAHIPUR
2
3
1820
2023
2038
2053
20-Sep-2024
25-Sep-2024
24-Sep-2024
25-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (25.06.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1379
Kannauj
GVPR
20077128
SHAHJAHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2034
2023
2038
2053
08-Sep-2024
04-Apr-2024
07-Jul-2024
08-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1380
Bijnor
LC INFRA
20087653
Shahlipur Abdul Sattar water supply scheme
1
1
2769
2022
2037
2052
30-Mar-2025
30-Mar-2025
30-Mar-2025
01-Apr-2025
Approved
Every thing completed
Approved
Every thing completed
View
1381
Ayodhya
UNIVERSAL MEP
20030565
SHAHPUR & PARSAU & KOPEYPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME
3
5
6140
2023
2038
2053
12-Oct-2023
19-Feb-2024
19-Feb-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1382
Kanpur Dehat
GVPR
20077347
shahpur derapur
2
5
3160
2023
2038
2053
17-Feb-2024
20-Dec-2023
04-May-2024
05-May-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1383
Fatehpur
Power Mech Projects Ltd
20102044
SHAHPUR HARDASPUR
1
1
1830
2023
2038
2053
20-Sep-2024
20-Sep-2024
02-Sep-2024
03-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of June (03.06.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1384
Meerut
Power Mech Projects Ltd
20020950
SHAHPUR PIRPUR
3
3
2652
2022
2037
2052
31-Dec-2024
13-Jun-2024
03-Nov-2024
04-Nov-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1385
Meerut
Power Mech Projects Ltd
20037269
SHAHPUR ZADID
1
1
2710
2022
2037
2052
31-Dec-2024
22-Feb-2024
30-Apr-2024
09-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1386
Ghaziabad
LC INFRA
20018261
SHAKAR PULLA PWS SCHEME
1
1
3007
2022
2037
2052
27-Aug-0201
30-Nov-2024
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work completed
View
1387
Farrukhabad
Vindhya-GAJA (JV)
20075758
SHAMASPUR BHIKHARI & HASANPUR & LALAUR RAJPUTAN MVS
3
5
5127
2023
2038
2053
30-May-2025
08-Aug-2024
21-Nov-2024
22-Nov-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1388
Hardoi
NCC Ltd.
20011904
SHAMSPUR
1
2
5540
2022
2037
2052
14-Jun-2023
22-Mar-2023
21-Jun-2023
24-Dec-2024
Approved
ok
Approved
Ok
View
1389
Kannauj
GVPR
20090109
SHARIFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
2234
2023
2038
2053
08-Sep-2024
16-Apr-2024
19-Jul-2024
20-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1390
Meerut
Power Mech Projects Ltd
20031798
SHAZADPUR - LALPUR
2
2
2411
2023
2038
2053
31-Dec-2024
03-Jun-2024
20-Oct-2024
21-Oct-2024
Approved
Recommended for further Approvals.
Approved
Approved
View
1391
Bijnor
LC INFRA
20097003
Sheh Village WSS
1
1
3476
2022
2037
2052
03-May-2025
10-Jun-2024
19-Dec-2024
20-Dec-2024
Approved
every thing completed
Approved
Everything is completed
View
1392
Moradabad
LC INFRA
20015181
Shekhoopur Khas village water supply scheme
1
1
4640
2022
2037
2052
08-Feb-2023
15-Sep-2024
15-Dec-2024
01-Jan-2025
Approved
Ok
Pending
View
1393
Bijnor
LC INFRA
20051715
SHEKHPUR LALA
2
2
3376
2022
2037
2052
03-Dec-2022
25-May-2025
25-May-2025
26-May-2025
Approved
Every thing complete.
Approved
complete check
View
1394
Ambedkar Nagar
Vindhya-GAJA (JV)
20041828
SHEKHPUR MALPURA WSS
1
5
5980
2023
2038
2053
23-Nov-2023
23-Dec-2024
02-Apr-2025
03-Apr-2025
Approved
Scheme completed and ready for O&M
Approved
Scheme completed
View
1395
Amethi
Welspun Kaveri Infraprojects JV
20013338
ShekhPur Water Supply Scheme
2
6
2436
2022
2037
2052
10-Apr-2023
23-Aug-2024
23-Aug-2024
27-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1396
Muzaffarnagar
Gayatri Projects LTD
20098062
SHEKHPURA GP RO WSS
1
2
11818
2023
2038
2053
16-Sep-2022
07-Oct-2024
08-Jan-2025
09-Jan-2025
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1397
Meerut
Power Mech Projects Ltd
20011226
SHEKHPURI
1
1
1993
2022
2037
2052
31-Dec-2024
04-Jan-2023
25-May-2023
15-Nov-2024
Approved
Recommended for further Approvals..................
Approved
APPROVED
View
1398
Bijnor
LC INFRA
8388790
Shekhpuri Chaohad
1
2
2350
2022
2032
2052
29-Sep-2023
11-Dec-2023
09-Oct-2024
10-Oct-2024
Approved
Every thing completed.
Approved
All document complete
View
1399
Bijnor
LC INFRA
20015905
SHEKPURI MINA WATER SUPPLY
2
2
3556
2022
2037
2052
08-Feb-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete.
Approved
Complete Check
View
1400
Bijnor
LC INFRA
20017093
Sher Nagar Naraini Water Supply
3
3
1428
2022
2037
2052
09-Feb-2024
09-Dec-2023
07-Jun-2024
08-Jun-2024
Approved
Every thing completed.
Approved
Everything Completed
View
1401
Bijnor
LC INFRA
8388726
SHERGARH, BAHADAR NAGAR, TAIMOORABAD SAHALIPUR VILLAGE WATER SUPPLY SCHEME
4
4
3574
2022
2037
2052
30-Sep-2024
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete.
Approved
All document checked
View
1402
Ghaziabad
LC INFRA
8360448
SHERPUR
1
1
4120
2022
2037
2052
01-Mar-2023
30-Nov-2021
31-Mar-2025
01-Apr-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
Approvd
View
1403
Bijnor
LC INFRA
20017183
SHERPUR BALLA WATER SUPPLY SCHEME
1
1
2890
2022
2037
2052
10-Feb-2024
10-Dec-2023
08-Jun-2024
09-Jun-2024
Approved
Every thing complete.
Approved
All document checked.
View
1404
Sultanpur
Vindhya-GAJA (JV)
20073749
SHERPUR PARS RAMPUR WATER SUPPLY SCHEME
2
2
1651
2023
2038
2053
05-Feb-2024
20-Dec-2024
25-Mar-2025
01-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1405
Farrukhabad
Vindhya-GAJA (JV)
20091728
SHERPUR SARAI MVS
2
4
2212
2023
2038
2053
31-Mar-2025
17-Dec-2024
30-Mar-2025
01-Apr-2025
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1406
Auraiya
GVPR
20041743
Sherpur saraiya PWS
3
2
2796
2023
2038
2053
06-Jan-2022
28-Apr-2023
01-Feb-2024
19-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1407
Ghaziabad
LC INFRA
20021553
SHIKHAIDA HAJARI PWS SCHEME
1
1
2402
2022
2037
2052
09-Feb-2022
30-Sep-2024
31-Jan-2025
01-Feb-2025
Approved
Actual Executed Cost Verified based on approved variation statement.
Approved
All work checked and recommended for O&M
View
1408
Hardoi
NCC Ltd.
8388423
SHIVRI
1
1
1930
2022
2037
2052
05-Mar-2023
20-Apr-2023
19-Jul-2023
25-Dec-2024
Approved
ok
Approved
OK
View
1409
Meerut
Power Mech Projects Ltd
20098532
SHODUTT-SHIVPURI
2
2
10245
2023
2038
2053
31-Jan-2025
24-Feb-2024
12-Jul-2024
10-Oct-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1410
Muzaffarnagar
Gayatri Projects LTD
20098064
SHOROM GP RO WSS
1
2
9276
2023
2038
2053
16-Sep-2022
02-Dec-2024
21-Jun-2025
22-Jun-2025
Approved
The details given by the contractor are correct at the time of approval.
Pending
View
1411
Muzaffarnagar
Gayatri Projects LTD
20098066
SHUKRATAL GP RO WSS
2
2
24542
2023
2038
2053
16-Sep-2022
01-Oct-2024
31-Dec-2024
01-Jan-2025
Approved
The details given by the contractor are correct at the time of approval.
Approved
OK
View
1412
Amethi
Vindhya-GAJA (JV)
20098341
SHUKUL PUR Water Supply Scheme
1
2
1224
2023
2038
2053
20-Apr-2024
19-Jun-2024
19-Sep-2024
25-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1413
Bahraich
PNC-SPML-JV
20014678
SHYAMPUR NADAUNA CHITTAURA MVS PWS
2
6
6260
2022
2037
2052
30-Jun-2025
30-Apr-2025
30-Apr-2025
01-May-2025
Approved
Approved the as per TKC Contract Agreement.
Approved
Scheme Completed
View
1414
Gautam Buddha Nagar
LC INFRA
8361578
SIDIPUR VILLAGE WATER SUPPLY SCHEME
1
1
4770
2022
2037
2052
20-Mar-2023
31-Mar-2024
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
verified
View
1415
Moradabad
LC INFRA
8360489
Sihari mala
1
1
4570
2022
2037
2052
29-Sep-2023
10-Dec-2023
17-Mar-2024
18-Mar-2024
Approved
Ok
Pending
View
1416
Fatehpur
Power Mech Projects Ltd
20095919
SIHARI PATTI
2
3
2330
2023
2038
2053
13-Aug-2023
30-Jun-2025
07-Dec-2024
08-Dec-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1417
Auraiya
GVPR
20091128
Sihauli PWS
1
3
1182
2023
2038
2053
06-Jan-2022
05-Mar-2024
30-Jan-2024
31-Jan-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1418
Hardoi
NCC Ltd.
20013193
SIKANDAR PUR
3
6
2160
2022
2037
2052
14-Jun-2023
25-Mar-2023
24-Jun-2023
25-Dec-2024
Approved
forwarded for O&M
Approved
OK
View
1419
Meerut
Power Mech Projects Ltd
20098180
SIKANDARPUR
1
1
745
2023
2038
2053
31-Dec-2024
24-Sep-2024
10-Feb-2025
11-Feb-2025
Approved
Recommended for Further Approval
Approved
Approved
View
1420
Hardoi
NCC Ltd.
20011167
SIKANDARPUR BAZAR
1
2
3780
2022
2037
2052
26-Jul-2023
20-Sep-2023
23-Dec-2023
13-Dec-2024
Approved
ok
Approved
OK
View
1421
Kanpur Dehat
GVPR
20077295
Sikandrapur Bilhaur & Gadaipur
3
6
2565
2023
2038
2053
17-Feb-2024
25-Nov-2023
09-Apr-2024
10-Apr-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1422
Azamgarh
LC INFRA
8359685
SIKRAURA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
1
3
5623
2022
2037
2052
24-Feb-2023
15-Nov-2023
18-Feb-2024
19-Feb-2024
Approved
OK
Approved
OK
View
1423
Kannauj
GVPR
20099301
SIKRORI GRAMM PANCHAYAT WATER SUPPLY SCHEME
1
1
1127
2023
2038
2053
14-Nov-2024
22-Apr-2024
26-Jul-2024
27-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1424
Kanpur Dehat
Indian Hume Pipe
20031465
Silhaula Buzurg
3
3
2550
2022
2037
2052
23-Sep-2022
31-Dec-2024
19-Aug-2023
20-Aug-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1425
Kanpur Dehat
Indian Hume Pipe
20050767
Simtamau
3
3
1880
2022
2037
2052
24-Nov-2022
31-Dec-2024
30-Jun-2023
01-Jul-2023
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1426
Kannauj
GVPR
20090107
SINGARI GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
1369
2023
2038
2053
08-Sep-2024
10-Nov-2024
14-Feb-2025
15-Feb-2025
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1427
Bahraich
PNC-SPML-JV
20099234
SINGARO PHAKARPUR RF PWS
1
5
2400
2022
2037
2052
31-Dec-2025
04-Oct-2025
04-Oct-2025
05-Oct-2025
Approved
Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0460, kindly complete it.
Approved
Scheme Completed with observation
View
1428
Mau
LC INFRA
20080877
SINGHASAN VILLAGE WATER SUPPLY SCHEME
2
4
2394
2022
2037
2052
26-Jan-2025
15-Jan-2025
14-Jan-2025
15-Jan-2025
Approved
Approved
Approved
Approved.
View
1429
Kannauj
GVPR
20090105
SINGHPUR & HARI NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME
3
3
3955
2023
2038
2053
08-Sep-2024
07-Apr-2024
11-Jul-2024
12-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1430
Amethi
Vindhya-GAJA (JV)
20101943
SINGTHEE WATER SUPPLY SCHEME
1
4
1290
2023
2038
2053
04-Jul-2024
16-Jun-2024
16-Sep-2024
17-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1431
Bijnor
LC INFRA
8360412
SINKRI BUZURG VILLAGE WATER SCHEME
1
1
2215
2022
2037
2052
14-Nov-2022
15-Jan-2025
15-Jan-2025
16-Jan-2025
Approved
Every thing complete
Approved
Every thing is completed.
View
1432
Azamgarh
LC INFRA
20101017
sirwan water supply scheme
1
7
3263
2023
2038
2053
22-Nov-2024
25-Aug-2024
28-Aug-2024
29-Aug-2024
Approved
OK
Approved
OK
View
1433
Kanpur Dehat
GVPR
20053382
Sisahi
1
2
2264
2023
2038
2053
18-Nov-2023
05-Oct-2023
21-Feb-2024
22-Feb-2024
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1434
Shahjahanpur
NCC Ltd.
20014899
Sisnai W/s
1
1
2340
2022
2037
2052
31-Aug-2023
31-Dec-2024
30-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
Approved
All information on the portal for the completion certificate of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1435
Meerut
Power Mech Projects Ltd
20010942
SISOLA KHURD
1
1
2944
2022
2037
2052
31-Dec-2024
21-Apr-2023
05-Sep-2023
14-Dec-2024
Approved
Recommended for Further Approval
Approved
approved
View
1436
Meerut
Power Mech Projects Ltd
20019638
SISOLI
1
1
7240
2022
2037
2052
31-Dec-2024
23-May-2024
12-Oct-2024
13-Oct-2024
Approved
Recommended for further Approvals.........
Approved
Approved
View
1437
Shahjahanpur
NCC Ltd.
20077485
SISORI WSS
1
4
3080
2022
2037
2052
31-Dec-2024
10-Aug-2024
09-Nov-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1438
Kanpur Dehat
GVPR
20077293
Sithau Matana
2
6
3408
2023
2038
2053
17-Feb-2024
05-Jan-2024
09-Apr-2024
10-Apr-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
1439
Ayodhya
UNIVERSAL MEP
20030603
SITHAULI GRAM PANCHAYAT WATER SUPPLY SCHEME
3
9
4880
2023
2038
2053
12-Oct-2023
22-Jan-2024
22-Jan-2024
30-Nov-2024
Approved
FOUND OK
Pending
View
1440
Meerut
Power Mech Projects Ltd
20058321
SOHARKA & ANJAULI
2
2
2351
2023
2038
2053
31-Dec-2024
30-Mar-2024
17-Aug-2024
02-Mar-2025
Approved
Recommended for further Approval
Approved
approved
View
1441
Raebareli
NCC Ltd.
8360964
Soitha
3
3
2334
2022
2037
2052
06-Mar-2023
12-Jul-2023
12-Jul-2023
09-Dec-2024
Approved
Ok
Approved
Ok
View
1442
Amethi
Vindhya-GAJA (JV)
20065731
SONARI KALAN & AMTAHI WATER SUPPLY SCHEME
2
19
7074
2023
2038
2053
09-Jan-2024
07-Dec-2024
07-Mar-2025
08-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1443
Amethi
Vindhya-GAJA (JV)
20067972
SONARI KANOO WATER SUPPLY SCHEME
2
18
2474
2023
2038
2053
08-Feb-2024
18-Jun-2024
18-Sep-2024
19-Dec-2024
Approved
d All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1444
Maharajganj
JMC - Lakshmi (JV)
20009558
Sonbarasa Gram Panchayat Water Supply Scheme
1
1
2075
2022
2037
2052
31-Dec-2024
26-Jul-2024
25-Oct-2024
01-Nov-2024
Approved
ok
Pending
correction required in amount
View
1445
Amethi
Welspun Kaveri Infraprojects JV
20012683
Songara Water Supply Scheme
2
6
2571
2022
2037
2052
10-Apr-2023
10-Jan-2024
13-Aug-2024
27-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
Hardcopy submitted and found okay as per the submitted documents..
View
1446
Ambedkar Nagar
Vindhya-GAJA (JV)
20058306
SONGAWN WSS
1
6
3260
2023
2038
2053
26-Dec-2023
26-Dec-2024
26-Mar-2025
27-Mar-2025
Approved
checked and found ok
Approved
Scheme completed
View
1447
Fatehpur
Power Mech Projects Ltd
20097910
SONHI
2
2
3090
2023
2038
2053
20-Sep-2024
19-Jul-2025
18-Jul-2025
19-Jul-2025
Approved
Trial & Run completed. It was initiated in the month of April (19.04.2025) and Regular water supply is given to the consumers.
Pending
View
1448
Ayodhya
VSA
20061625
SONWARSA MAFI W/S
3
5
6400
2023
2038
2053
20-Feb-2024
05-Feb-2025
05-Feb-2025
06-May-2025
Approved
FOUND OK
Pending
View
1449
Ambedkar Nagar
Vindhya-GAJA (JV)
20072514
SUBARPUR WSS
1
3
2180
2023
2038
2053
15-Mar-2024
30-Apr-2025
30-Apr-2025
01-May-2025
Approved
SCHEME COMPLETED AND READY FOR O&M
Approved
Scheme completed
View
1450
Farrukhabad
Vindhya-GAJA (JV)
20080826
SUBHAN PUR SVS
1
1
2492
2023
2038
2053
31-Mar-2025
03-Feb-2025
03-Feb-2025
04-Feb-2025
Approved
All the parameters ok
Approved
OK
View
1451
Fatehpur
Power Mech Projects Ltd
20100803
SUDANPUR
2
3
1640
2023
2038
2058
14-Aug-2023
30-Jun-2025
09-Sep-2024
12-Sep-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1452
Kanpur Dehat
GVPR
20053434
SUDERPUR GAJEN
2
0
2623
2023
2038
2053
18-Nov-2023
01-Dec-2023
11-Mar-2024
12-Mar-2024
Approved
TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's.
Approved
All work of scheme found satisfactory
View
1453
Shahjahanpur
NCC Ltd.
20016435
Sujatpur
1
1
2440
2022
2037
2052
09-Aug-2023
31-Dec-2024
09-Nov-2023
16-Nov-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1454
Mau
LC INFRA
20032906
SULTANIPUR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME
5
8
2880
2022
2037
2052
02-Nov-2023
25-Mar-2025
28-Aug-2024
25-Mar-2025
Approved
All Documents verified & Checked
Approved
Approved..
View
1455
Varanasi
Larsen & Toubro Ltd
20009677
SULTANPUR
1
4
2444
2022
2037
2052
09-May-2023
23-Jan-2024
30-Sep-2024
01-Oct-2024
Approved
Approve
Approved
Approved
View
1456
Bijnor
LC INFRA
8388812
SULTANPUR KHADAR VILLAGE WATER SCHEME
2
2
2237
2022
2037
2052
30-Sep-2024
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing completed.
Approved
Everything Complete.
View
1457
Bijnor
Vindhya-GAJA (JV)
20067544
Sultanpur Sadat water supply scheme
2
2
1838
2023
2038
2053
06-Jul-2023
06-Jan-2025
06-Jul-2025
07-Jul-2025
Approved
Every thing complete.
Approved
All document complete
View
1458
Fatehpur
Power Mech Projects Ltd
20097537
SULTANPUR SATO
1
3
1850
2023
2038
2053
20-Sep-2024
11-Oct-2024
11-Oct-2024
12-Oct-2024
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of July (12.07.2024) and Regular water supply is given to the consumers.
Approved
Verify
View
1459
Kannauj
GVPR
20050204
SULTAPUR & SHANKARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
4
2960
2023
2038
2053
15-Jun-2024
10-Mar-2024
14-Jun-2024
15-Jun-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory,scheme finalized for operation & maintenance.
View
1460
Auraiya
Indian Hume Pipe
20056127
Sundaripur PWS
2
2
2100
2022
2037
2052
22-Sep-2023
15-Jun-2024
24-Sep-2024
25-Sep-2024
Approved
Forwarded for further action.
Approved
All work of scheme fond satisfactory.
View
1461
Farrukhabad
Vindhya-GAJA (JV)
20092998
SUNDERPUR MVS
1
9
1960
2023
2038
2053
30-May-2025
28-Feb-2024
12-Jun-2024
13-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1462
Moradabad
LC INFRA
20012279
sunderpur village water supply scheme
3
3
8680
2022
2037
2052
19-Sep-2023
24-May-2024
22-Aug-2024
23-Aug-2024
Approved
Ok
Pending
View
1463
Bijnor
LC INFRA
20018328
Sungarpur Water Supply Scheme
1
1
2083
2022
2037
2052
10-Feb-2022
26-Apr-2024
07-Nov-2024
08-Nov-2024
Approved
Every thing complete.
Approved
Every thing complete.
View
1464
Kanpur Dehat
Indian Hume Pipe
20064924
Surasi
3
4
3430
2022
2037
2052
11-Jan-2024
31-Dec-2024
31-Aug-2023
01-Sep-2023
Approved
Forward for further necessary action pls
Approved
All work of scheme found satisfactory
View
1465
Ambedkar Nagar
Vindhya-GAJA (JV)
20035148
SURJUPUR WSS
4
4
2910
2023
2038
2053
21-Oct-2023
08-Sep-2024
19-Mar-2025
20-Mar-2025
Approved
Checked and Veryfied
Approved
Scheme completed
View
1466
Bahraich
PNC-SPML-JV
20014669
SUSRAULI CHITTAURA PWS
1
4
3509
2022
2037
2052
28-Feb-2025
28-Jan-2025
30-Oct-2023
28-Jan-2025
Approved
ok
Approved
Scheme completed ready for O&M
View
1467
Shahjahanpur
NCC Ltd.
20105023
SUTHA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2745
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sutha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Sutha scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1468
Mau
LC INFRA
20064779
Suwah Gram Panchayat Water Supply Scheme
2
3
1940
2022
2037
2052
29-Jun-2024
02-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Approved
Approved
Approved.
View
1469
Bijnor
LC INFRA
20075940
SUWAHERI KHURD WATER SUPPLY SCHEME
1
1
1890
2022
2037
2052
22-Dec-2023
23-Dec-2022
15-Nov-2024
16-Nov-2024
Approved
Every thing completed
Approved
ALL WORK COMPLETED
View
1470
Moradabad
LC INFRA
20064484
Taha Nayak Village Water Supply Scheme
1
1
6650
2022
2037
2052
31-Mar-2024
31-Mar-2024
16-Aug-2024
17-Aug-2024
Approved
Ok
Pending
View
1471
Bijnor
LC INFRA
20011753
Taharpur Gulam Imam Village Water Supply Scheme
1
1
2802
2022
2037
2052
09-Feb-2024
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete.
Approved
Complete Check
View
1472
Bijnor
LC INFRA
20011564
Taharpur Madad Imam Village Water Supply Scheme
1
3
1856
2022
2037
2052
10-Feb-2024
07-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
All works completed
Approved
Everything Completed
View
1473
Farrukhabad
Vindhya-GAJA (JV)
20077864
TAJPUR & KUMHAULI MVS
2
4
3289
2023
2038
2053
30-May-2025
02-Mar-2024
15-Jun-2024
16-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1474
Auraiya
GVPR
20089658
Tajpur Chhonk PWS
1
1
2550
2023
2033
2053
06-Jan-2022
30-Aug-2023
13-Jul-2024
30-Aug-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1475
Kanpur Dehat
GVPR
20025234
TAJPUR TARSOLI
2
4
4377
2023
2038
2053
26-Sep-2023
12-Oct-2023
12-Mar-2024
13-Mar-2024
Approved
Forward for further action pls
Approved
All work of scheme found satisfactory
View
1476
Ambedkar Nagar
Vindhya-GAJA (JV)
20067460
TAJPUR Water Supply Scheme
4
8
3460
2023
2038
2053
20-Feb-2024
25-Jan-2025
26-Apr-2025
27-Apr-2025
Approved
checked and verified and found OK
Approved
Scheme completed
View
1477
Sultanpur
UNIVERSAL MEP
20066724
TAKARIYA & NONARA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
3310
2023
2038
2053
12-Jan-2024
31-Dec-2024
30-Jan-2025
01-Feb-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1478
Meerut
Power Mech Projects Ltd
20020942
TAKHAWALI
2
2
2733
2022
2037
2052
31-Dec-2024
14-Jan-2024
03-Jun-2024
20-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1479
Ayodhya
UNIVERSAL MEP
20030048
TALAGAON GRAM PANCHAYAT WATER SUPPLY SCHEME
1
2
3210
2023
2038
2053
12-Oct-2023
11-Sep-2023
11-Sep-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1480
Auraiya
GVPR
20041713
Talehpur
3
4
3075
2023
2038
2053
06-Jan-2022
29-May-2024
28-May-2024
29-May-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1481
Farrukhabad
Vindhya-GAJA (JV)
20091788
TANDA BAHRAMPUR MVS
3
3
2276
2023
2038
2053
30-May-2025
22-May-2024
22-May-2024
23-May-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1482
Ayodhya
UNIVERSAL MEP
20030149
TANDA KHULASA GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
2700
2023
2038
2053
12-Oct-2023
15-Oct-2023
15-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1483
Ayodhya
UNIVERSAL MEP
20058287
Tandava WSS
2
5
2610
2023
2038
2053
22-Jan-2024
09-May-2024
09-May-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1484
Amethi
Vindhya-GAJA (JV)
20068083
TARA PUR WATER SUPPLY SCHEME
2
5
1719
2023
2038
2053
29-Apr-2024
07-Nov-2024
07-Feb-2025
09-May-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1485
Mau
LC INFRA
20011928
TARAI DIH GP WATER SUPPLY SCHEME
3
8
1957
2022
2037
2052
20-Mar-2024
22-Jan-2025
22-Jan-2025
25-Jan-2025
Approved
Approved.
Approved
Approved.
View
1486
Mau
LC INFRA
20098943
TARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
1360
2022
2037
2052
26-Sep-2024
01-Apr-2025
01-Apr-2025
02-Apr-2025
Approved
Ok
Approved
approve
View
1487
Meerut
Power Mech Projects Ltd
8362955
TARAPUR
3
3
4006
2022
2037
2052
31-Dec-2024
17-Jul-2023
03-Dec-2023
11-Apr-2025
Approved
Recommended for further Approval
Approved
approved
View
1488
Bahraich
PNC-SPML-JV
20100941
TARAPUR KHURD TEJWAPUR RF PWS
1
8
6490
2022
2037
2052
31-Dec-2025
15-Oct-2025
14-Nov-2023
16-Oct-2025
Approved
Scheme completed, minnor observation is identified, kindly complete it.
Approved
Scheme Completed with observation
View
1489
Gautam Buddha Nagar
LC INFRA
20013497
TATARPUR W/S SCHEME
1
1
2222
2022
2037
2052
20-Sep-2023
30-Oct-2023
31-Oct-2024
01-Nov-2024
Approved
Project certificate is verified
Approved
Work completed. O&M Started
View
1490
Farrukhabad
Vindhya-GAJA (JV)
20097999
tatia nibal wss
2
3
1483
2023
2038
2053
31-Mar-2025
10-Feb-2025
25-May-2025
26-May-2025
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1491
Meerut
Power Mech Projects Ltd
20066787
TATINA
1
1
2444
2022
2037
2052
31-Dec-2024
20-Jun-2024
06-Nov-2024
21-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1492
Meerut
Power Mech Projects Ltd
20098116
TATINA SAINI
1
1
2101
2019
2038
2053
31-Dec-2024
28-Jun-2024
16-Nov-2024
01-Jan-2025
Approved
Recommended for further Approvals.
Approved
Approved
View
1493
Ayodhya
UNIVERSAL MEP
20030397
TEEKAR AND SHAH PUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
3
2100
2023
2038
2053
12-Oct-2023
10-Oct-2023
10-Oct-2023
15-Nov-2024
Approved
Found ok
Approved
Found Correct
View
1494
Azamgarh
LC INFRA
20066376
Tekmalpur water supply
2
4
2319
2023
2038
2053
03-Aug-2024
23-Jul-2024
26-Oct-2024
27-Oct-2024
Approved
OK
Approved
OK
View
1495
Amethi
Vindhya-GAJA (JV)
20066593
TENDUA WATER SUPPLY SCHEME
1
3
2836
2023
2038
2053
06-Jan-2024
12-Jun-2024
12-Sep-2024
15-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1496
Amethi
Vindhya-GAJA (JV)
20098333
TENWASI Water Supply Scheme
1
5
1731
2023
2038
2053
24-Apr-2024
27-Dec-2024
27-Mar-2025
28-Jun-2025
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1497
Sultanpur
Gayatri Projects LTD
20015265
TERAAYEN WATER SUPPLY SCHEME
3
3
4050
2022
2037
2052
01-Sep-2024
12-Aug-2025
31-May-2024
13-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Pending
View
1498
Hardoi
NCC Ltd.
20011452
TERIA
1
1
2130
2022
2037
2052
26-Jul-2023
20-Mar-2023
20-Jul-2023
25-Nov-2024
Approved
OK
Approved
OK
View
1499
Fatehpur
Power Mech Projects Ltd
20097484
TEUJA
1
1
2690
2023
2038
2053
13-Aug-2024
30-Jun-2025
12-Jan-2025
13-Jan-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of October (13.10.2024)
Approved
Verified
View
1500
Auraiya
GVPR
20084727
Teurlal pur & babayan
1
9
3918
2023
2038
2053
06-Jan-2022
31-Dec-2024
31-Dec-2024
02-Jan-2025
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1501
Auraiya
Indian Hume Pipe
20014502
THAKUR GOAN
2
3
2950
2022
2037
2052
08-May-2023
25-Apr-2023
14-Aug-2023
01-Sep-2023
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1502
Hardoi
NCC Ltd.
20012132
THATHIYA NARAINMAU
2
5
3020
2022
2037
2052
14-Jun-2023
06-Jun-2024
05-Sep-2024
24-Dec-2024
Approved
ok
Approved
OK
View
1503
Ambedkar Nagar
Vindhya-GAJA (JV)
20026062
THATTA WATER SUPPLY SCHEME
3
16
5040
2023
2038
2053
28-Sep-2023
23-Dec-2024
23-Mar-2025
24-Mar-2025
Approved
Scheme completed and ready for O&M
Approved
CHECKED AND FOUND OK
View
1504
Kanpur Dehat
GVPR
20099719
Thenamau
1
0
1069
2023
2038
2053
11-May-2024
01-Jan-2024
15-Apr-2024
16-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1505
Amethi
Vindhya-GAJA (JV)
20085700
THENGHA WATER SUPPLY SCHEME
1
10
4948
2023
2038
2053
20-Mar-2024
17-Jun-2024
17-Sep-2024
18-Dec-2024
Approved
Hardcopy submiited and all documents found okay..
Pending
View
1506
Ayodhya
UNIVERSAL MEP
20092406
THEWGA WSS
2
3
2165
2023
2038
2053
21-Jun-2024
08-Dec-2024
08-Dec-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1507
Meerut
Power Mech Projects Ltd
20020261
THIROT
1
1
2185
2023
2037
2052
31-Dec-2024
05-Nov-2023
23-Mar-2024
20-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1508
Bijnor
LC INFRA
8360404
THURELA VILLAGE WATER SCHEME
1
1
2201
2022
2037
2052
30-Sep-2023
12-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete
Approved
Everything Completed.
View
1509
Shahjahanpur
NCC Ltd.
20016387
TIHAR AJANPUR
3
3
3155
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1510
Sultanpur
Gayatri Projects LTD
20011984
Tikar
1
1
2820
2022
2037
2052
01-Sep-2024
12-Aug-2025
31-May-2024
13-Aug-2025
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Pending
View
1511
Amethi
Vindhya-GAJA (JV)
20098346
Tikariya Water Supply Scheme
1
13
2451
2023
2038
2053
16-May-2023
16-Dec-2024
16-Mar-2025
17-Jun-2025
Approved
Hardcopy submitted and found okay as per the submitted documents.
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance..
View
1512
Jhansi
NCC Ltd.
8009966
Tilaitha GOV
25
6468
45923
2023
2038
2053
30-Jun-2022
30-Aug-2023
19-Nov-2024
20-Nov-2024
Approved
Checked
Approved
Checked and Approved
View
1513
Auraiya
GVPR
20084719
Tilakpur Rajohapur PWS
1
2
2637
2023
2038
2053
06-Jan-2022
23-Jul-2024
07-Jun-2024
24-Jul-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1514
Auraiya
GVPR
20091142
Tilakpur Sahar PWS
1
2
1313
2023
2038
2053
01-Jun-2022
24-Mar-2024
23-Mar-2024
25-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1515
Siddharth Nagar
JAKSON - VISHVARAJ (JV)
20096825
TILGADIYA BUJURG GP WSS
2
2
2260
2023
2038
2053
31-Dec-2024
13-Aug-2025
13-Aug-2025
01-Dec-2025
Approved
All documents verified and found as per guideline of SWSM. Sending for further process
Pending
View
1516
Bijnor
LC INFRA
8360413
TIRPURI VILLAGE WATER SCHEME
2
2
1447
2022
2037
2052
30-Sep-2023
11-Dec-2023
10-Jun-2024
11-Jun-2024
Approved
Every thing complete
Approved
Every thing is completed.
View
1517
Kannauj
GVPR
20067634
TIZALAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
3
1365
2023
2038
2053
16-Aug-2024
10-Apr-2024
13-Jul-2024
14-Jul-2024
Approved
FORWARDED FOR FURTHER ACTION
Pending
View
1518
Amethi
Gayatri Projects LTD
20085858
TRILOKPUR WATER SUPPLY SCHEME
2
7
3423
2023
2038
2053
13-Sep-2024
10-Apr-2024
20-Jul-2024
25-Nov-2024
Approved
Hardcopy submitted
Approved
All things found satisfactory in the Scheme and finalized for Operation And Maintenance
View
1519
Farrukhabad
Vindhya-GAJA (JV)
20091718
TURKIPUR MVS
2
2
2719
2023
2038
2053
30-Nov-2024
05-Aug-2024
01-Dec-2024
02-Dec-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1520
Jaunpur
AFCONS
20058702
TUSAURI VILLAGE WATER SUPPLY SCHEME
2
6
2687
2023
2038
2053
31-Dec-2024
16-Jan-2024
10-Mar-2025
10-Mar-2025
Approved
Checked and Found Ok.
Approved
ok
View
1521
Kanpur Dehat
VSA
20092630
Tutuapur
1
4
2370
2023
2038
2023
30-Apr-2023
02-Jan-2024
14-Apr-2024
15-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found atisfactory
View
1522
Kanpur Dehat
VSA
20094293
udaipur
2
2
1659
2023
2038
2023
01-Dec-2024
20-Dec-2024
01-Apr-2024
02-Apr-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1523
Balrampur
Larsen & Toubro Ltd
20016395
Udaipur water supply scheme
2
5
1627
2022
2037
2052
30-Dec-2024
06-Feb-2024
06-May-2024
07-May-2024
Approved
OK
Approved
Ok......
View
1524
Kannauj
GVPR
20077115
UDAITAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
2
2
2241
2023
2038
2053
08-Sep-2024
13-Apr-2024
16-Jul-2024
17-Jul-2024
Approved
forwarded for further action.
Approved
All works of scheme found satisfactory, scheme finalized for operation & maintenance.
View
1525
Moradabad
LC INFRA
8360479
UDHOPURA VILLAGE WATER SUPPLY SCHEME
1
2
2538
2022
2037
2052
02-Nov-2023
18-Apr-2024
17-Jul-2024
18-Jul-2024
Approved
Ok
Pending
View
1526
Sultanpur
UNIVERSAL MEP
20064763
UGHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
4
3460
2023
2038
2053
12-Jan-2024
12-Jan-2024
20-Jan-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements.
View
1527
Farrukhabad
Vindhya-GAJA (JV)
20076888
UJARAMAU NAYAGAON SVS
1
3
2744
2023
2038
2053
30-May-2025
10-Jun-2024
10-Jun-2024
11-Jun-2024
Approved
All the parameters of scheme verified can take in O&M.
Approved
ok
View
1528
Meerut
Power Mech Projects Ltd
20082984
UKASIA
1
1
1617
2022
2037
2052
31-Dec-2024
30-May-2024
20-Oct-2024
25-Jan-2025
Approved
Recommended for further Approval
Approved
approved
View
1529
Ambedkar Nagar
Vindhya-GAJA (JV)
20026103
UKRA WATER SUPPLY SCHEME
1
6
3152
2023
2038
2053
28-Sep-2023
01-Jan-2025
01-Jan-2025
02-Jan-2025
Approved
checked and verified
Approved
Scheme completed
View
1530
Ayodhya
UNIVERSAL MEP
20031485
UMAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
4580
2023
2038
2053
12-Oct-2023
20-Feb-2024
20-Feb-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1531
Fatehpur
Power Mech Projects Ltd
20097485
UMARA
1
3
2360
2023
2038
2058
15-May-2023
30-Jun-2025
08-Dec-2024
09-Dec-0004
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1532
Bijnor
LC INFRA
20014092
UMARPUR WATER SUPPLY SCHEME
2
2
1941
2022
2037
2052
29-Sep-2023
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete
Approved
Every thing complete
View
1533
Fatehpur
Power Mech Projects Ltd
20102041
UMRA
1
1
1670
2023
2038
2053
20-Sep-2024
23-Feb-2025
22-Feb-2025
23-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November (23.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1534
Shahjahanpur
NCC Ltd.
20015680
UMRAHA
1
1
2730
2022
2037
2052
09-Jan-2024
31-Dec-2024
09-Apr-2024
06-Dec-2024
Approved
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
Approved
All information on the portal for the completion certificate of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
View
1535
Bijnor
LC INFRA
8362910
UMRI GRAMPANCHAYAT WATER SUPPLY SCHEME
3
3
3993
2022
2037
2052
22-Sep-2023
11-Dec-2023
09-Jun-2024
10-Jun-2024
Approved
Every thing complete.
Approved
All document complete
View
1536
Meerut
Power Mech Projects Ltd
20098109
UPLEHRA
1
1
1990
2023
2038
2053
31-Dec-2024
23-Jan-2024
10-Jun-2024
07-Nov-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1537
Auraiya
GVPR
20087934
Urelalpur & Shahoopur PWS
2
5
3335
2023
2038
2053
06-Jan-2022
26-Mar-2024
25-Mar-2024
26-Mar-2024
Approved
Forwarded for further action.
Approved
All work of scheme found satisfactory.
View
1538
Kanpur Dehat
Indian Hume Pipe
8361986
URSAN
1
2
4095
2022
2037
2052
15-Sep-2021
31-Dec-2024
31-Dec-2023
01-Jan-2024
Approved
Forward for further necessary action pls.
Approved
All work of scheme found satisfactory
View
1539
Mau
LC INFRA
20011546
USARI KHURD GP WATER SUPPLY SCHEME
2
7
4732
2022
2037
2052
26-Apr-2023
11-Dec-2024
11-Dec-2024
12-Dec-2024
Approved
Approved..
Approved
approve
View
1540
Moradabad
LC INFRA
8360510
Uttampur Bahlolpur
1
1
5480
2022
2037
2052
20-Sep-2023
01-Aug-2024
30-Oct-2024
31-Oct-2024
Approved
Ok
Pending
View
1541
Amethi
Vindhya-GAJA (JV)
20066641
UTTARGAON WATER SUPPLY SCHEME
1
16
3726
2023
2038
2053
06-Jan-2024
15-Jun-2024
15-Sep-2024
16-Dec-2024
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance
View
1542
Ayodhya
UNIVERSAL MEP
20030212
VAJIDPUR GRAM PANCHAYAT WATER SUPPLY SCHEME
1
1
3170
2023
2038
2053
12-Oct-2023
15-Jul-2024
15-Jul-2024
01-Feb-2025
Approved
FOUND OK
Pending
View
1543
Amethi
Gayatri Projects LTD
20099387
VATIYA WATER SUPPLY SCHEME
1
1
2173
2022
2037
2052
27-Nov-2024
07-Jun-2024
11-Sep-2024
15-Jan-2025
Approved
Hardcopy submitted and found okay as per the submitted documents..
Approved
All things are found satisfactory in this Scheme , finalized for Operation And Maintenance
View
1544
Farrukhabad
Vindhya-GAJA (JV)
20092026
VEERPUR MVS
2
5
3139
2023
2038
2023
30-Nov-2024
09-May-2024
02-Sep-2024
03-Sep-2024
Approved
All the parameters of scheme verified can take in O&M
Approved
ok
View
1545
Ayodhya
VSA
20051242
VIJAYPUR SHAJAHARA
2
14
3181
2023
2038
2053
24-Nov-2023
30-Mar-2025
20-Aug-2025
25-Aug-2025
Approved
FOUND OK
Pending
View
1546
Sultanpur
UNIVERSAL MEP
20066606
VIKANA & SOMNABHAR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME
2
8
6040
2023
2038
2053
12-Jan-2024
12-Jan-2024
19-Nov-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1547
Ayodhya
VSA
20055757
VINAYAKPUR WSS
1
4
3380
2023
2038
2053
24-Nov-2023
31-Mar-2025
05-Aug-2025
18-Aug-2025
Approved
FOUND OK
Pending
View
1548
Sultanpur
UNIVERSAL MEP
20066453
VINAYKPUR & KOTA GRAM PANCHAYAT WATER SUPPLY SCHEME
2
13
4340
2023
2038
2053
12-Jan-2024
12-Jan-2024
11-May-2024
01-Dec-2024
Approved
All uploaded documents has been checked and found as per requirements. This is sending for further action.
Approved
All uploaded documents have been checked and verified as per requirements
View
1549
Meerut
Power Mech Projects Ltd
20066751
WALIDPUR
1
1
3352
2023
2038
2053
07-Mar-2023
06-Jun-2024
22-Oct-2024
01-Dec-2024
Approved
Recommended for further Approvals.
Approved
approved
View
1550
Fatehpur
Power Mech Projects Ltd
20100818
YOHAN
2
4
2100
2023
2038
2053
13-Aug-2024
30-Jun-2025
07-Feb-2025
08-Feb-2025
Approved
Work has been completed. Trial & Run also completed. It was initiated in the month of November(08.11.2024) and Regular water supply is given to the consumers.
Approved
Verified
View
1551
Bijnor
LC INFRA
20018243
Yusufpur Hamid Water supply Scheme
1
1
1961
2022
2037
2052
29-Oct-2021
07-May-2024
08-Aug-2024
09-Aug-2024
Approved
Every thing complete.
Approved
Complete
View
1552
Ghaziabad
LC INFRA
20026210
YUSUFPUR ISHAPUR PWS SCHEME
1
1
3075
2022
2037
2052
08-Aug-2023
31-Oct-2024
28-Feb-2025
01-Mar-2025
Approved
Satisfactory on the work. All civil works and E&M works are completed.
Approved
All Work Completed
View
1553
Mau
LC INFRA
20023719
YUSUPH PUR WATER SUPPLY SCHEME
2
5
2387
2022
2037
2052
25-Feb-2024
22-Apr-2025
22-Apr-2025
23-Apr-2025
Approved
Approved
Approved
approve
View
1554
Meerut
Power Mech Projects Ltd
20011234
ZAFRABAD DURVESHPUR
1
1
2371
2022
2037
2052
31-Dec-2024
10-Dec-2022
20-Mar-2023
24-Nov-2024
Approved
recommended for Further approval
Approved
approved
View